Transformation, flow, and value constellations in AEC projects
暂无分享,去创建一个
[1] S D Eppinger,et al. Innovation at the speed of information. , 2001, Harvard business review.
[2] Iris D. Tommelein,et al. Value stream analysis of a re-engineered construction supply chain , 2003 .
[3] Gregory A. Howell,et al. Interaction between subcycles: one key to improved methods , 1993 .
[4] Daniel E. Whitney,et al. Designing the design process , 1990 .
[5] Iris D. Tommelein,et al. Value Stream Mapping for Make-to-Order Products in a Job Shop Environment , 2005 .
[6] Iris D. Tommelein,et al. Lean construction tools and techniques , 2007 .
[7] Lauri Koskela,et al. Towards Lean Design Management , 1997 .
[8] Maik Maurer,et al. Structural Awareness in Complex Product Design , 2007 .
[9] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[10] Nigel Cross,et al. Engineering Design Methods: Strategies for Product Design , 1994 .
[11] S. H. Bok,et al. Process-Parameter-Interface Model for Design Management , 2003 .
[12] Iris D. Tommelein,et al. DePlan: a tool for integrated design management , 2004 .
[13] G. Susman,et al. An Assessment of the Scientific Merits of Action Research. , 1978 .
[14] Jim Suhr,et al. The Choosing By Advantages Decisionmaking System , 1999 .
[15] Jack R. Meredith,et al. Building operations management theory through case and field research , 1998 .
[16] Steve Caplin,et al. Principles Of Design , 2011 .
[17] Jeffrey K. Liker,et al. The Toyota Product Development System: Integrating People, Process And Technology , 2006 .
[18] Tyson R. Browning,et al. Applying the design structure matrix to system decomposition and integration problems: a review and new directions , 2001, IEEE Trans. Engineering Management.
[19] Iris D. Tommelein,et al. Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .
[20] Andrew N. Baldwin,et al. Modelling design information to evaluate pre-fabricated and pre-cast design solutions for reducing construction waste in high rise residential buildings , 2008 .
[21] Chimay J. Anumba,et al. Introduction to Concurrent Engineering in Construction , 2007 .
[22] Lauri Koskela,et al. The prevalent theory of construction is a hindrance for innovation , 2000 .
[23] Edward Cohen,et al. Minimum Design Loads for Buildings and Other Structures , 1990 .
[24] Iris D. Tommelein,et al. Exploration of Set-Based Design for Reinforced Concrete Structures , 2007 .
[25] Koshy Varghese,et al. Application of Dependency Structure Matrix for Activity Sequencing in Concurrent Engineering Projects , 2006 .
[26] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[27] Charles G. Salmon. Steel structures : design and behavior emphasizing load and resistance factor design / Charles G. Salmon, John E. Johnson , 1990 .
[28] Daniel T. Jones,et al. Seeing the Whole Mapping the Extended Value Stream , 2002 .
[29] John Clarkson,et al. Models of designing , 2005 .
[30] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[31] Durward K. Sobek,et al. Toyota's Principles of Set-Based Concurrent Engineering , 1999 .
[32] Gregory A. Howell,et al. Production System Design in Construction , 2001 .
[33] D. Dillman,et al. How to conduct your own survey , 1994 .
[34] Iris D. Tommelein,et al. PARADE GAME :I MPACT OF WORK FLOW VARIABILITY ON TRADE PERFORMANCE , 1999 .
[35] Glenn Ballard,et al. Positive Vs. Negative Iteration in Design , 2000 .
[36] Lauri Koskela. WE NEED A THEORY OF CONSTRUCTION , 1999 .
[37] Iris D. Tommelein,et al. VALUE STREAM ANALYSIS OF CONSTRUCTION SUPPLY CHAINS: CASE STUDY ON PIPE SUPPORTS USED IN POWER PLANTS , 2002 .
[38] Maqsood Sandhu,et al. Project logistics with the dependency structure matrix approach – an analysis of a power plant delivery , 2006 .
[39] Andrew Kusiak,et al. Engineering Design: Products, Processes, and Systems , 1999 .
[40] Andrew N. Baldwin,et al. Application of the Analytical Design Planning Technique to Construction Project Management , 2000 .
[41] Bozidar Stojadinovic,et al. Set-Based Design: Case Study on Innovative Hospital Design , 2008 .
[42] Gregory A. Howell,et al. CASE STUDY FOR WORK STRUCTURING: INSTALLATION OF METAL DOOR FRAMES , 2000 .
[43] Stuart Pugh,et al. Total Design: Integrated Methods for Successful Product Engineering , 1991 .
[44] Aminah Robinson Fayek,et al. Developing a standard methodology for measuring and classifying construction field rework , 2004 .
[45] YAN JIN,et al. The virtual design team: A computational model of project organizations , 1996, Comput. Math. Organ. Theory.
[46] Robert Lane,et al. “Wicked Problems, Righteous Solutions” Back to the Future on Large Complex Projects , 2000 .
[47] Udo Lindemann,et al. Structural awareness in complex product design – the Multiple-Domain Matrix , 2007 .
[48] John C. Tang,et al. An observational methodology for studying group design activity , 1991 .
[49] D. V. Steward,et al. The design structure system: A method for managing the design of complex systems , 1981, IEEE Transactions on Engineering Management.
[50] Gregory A. Howell,et al. Reforming Project Management: The Role of Lean Construction , 2000 .
[51] Lauri Koskela. Making-Do — the Eighth Category of Waste , 2004 .
[52] Thomas A. Salomone,et al. What every engineer should know about concurrent engineering , 1995 .
[53] Gregory Howell,et al. The Underlying Theory of Project Management Is Obsolete , 2008, IEEE Engineering Management Review.
[54] Lauri Koskela,et al. Application of the New Production Philosophy to Construction , 1992 .
[55] Karl T. Ulrich,et al. Product Design and Development , 1995 .
[56] Şule Taşlı Pektaş,et al. Modelling detailed information flows in building design with the parameter-based design structure matrix , 2006 .
[57] H. Rittel,et al. Dilemmas in a general theory of planning , 1973 .
[58] T. Saaty. How to Make a Decision: The Analytic Hierarchy Process , 1990 .
[59] K. Lewin. Action Research and Minority Problems , 1946 .
[60] Graham Clark,et al. Service Operations Management , 2001 .
[61] Iris D. Tommelein,et al. Design Structure Matrix (DSM) Implementation on a Seismic Retrofit , 2008 .
[62] Li Chen,et al. Towards Rapid Redesign: Decomposition Patterns for Large-Scale and Complex Redesign Problems , 2005 .
[63] Simon A. Austin,et al. A problem‐solving approach to value‐adding decision making in construction design , 2006 .
[64] G. Ballard,et al. Lean Project Delivery System ( LPDS ) Model , 2003 .
[65] Karl T. Ulrich,et al. Special Issue on Design and Development: Product Development Decisions: A Review of the Literature , 2001, Manag. Sci..
[66] E. Nawy. Reinforced Concrete: A Fundamental Approach , 1985 .
[67] Iris D. Tommelein,et al. Structural Design Iteration: The Application of DSM to Seismic Retrofit , 2009 .
[68] Iris D. Tommelein,et al. The foundations of lean construction , 2002 .
[69] Anders Björnfot,et al. A systematic framework for long-span timber structures , 2004 .
[70] John R. Dixon,et al. A review of research in mechanical engineering design. Part I: Descriptive, prescriptive, and computer-based models of design processes , 1989 .
[71] E. Crawley,et al. The projection relationship between object process models (opm) and design system matrices (DSM) , 2007 .
[72] Glenn Ballard,et al. Implementing Lean Construction: Understanding and Action , 1998 .
[73] Don Clausing. Total quality development : a step-by-step guide to world class concurrent engineering , 1994 .
[74] Finland,et al. Use of the design structure matrix in construction , 1997 .
[75] Iris D. Tommelein,et al. Design Structure Matrix Implementation on a Seismic Retrofit , 2010 .
[76] Durward K. Sobek,et al. The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .
[77] Olivier L. de Weck,et al. 4.3.2 Platform identification using Design Structure Matrices , 2006 .
[78] T. Y. Lin,et al. Structural concepts and systems for architects and engineers , 1981 .
[79] Jeffrey K. Liker,et al. The Toyota way : 14 management principles from the world's greatest manufacturer , 2004 .
[80] Iris D. Tommelein,et al. INTEGRATED PRODUCT-PROCESS DEVELOPMENT BY A LIGHT FIXTURE MANUFACTURER , 2001 .
[81] Crispin Hales,et al. Engineering design: a systematic approach , 1989 .
[82] C. Syan. Introduction to concurrent engineering , 1994 .
[83] Iris D. Tommelein,et al. Work Structuring to Achieve Integrated Product-Process Design , 2004 .
[84] Iris D. Tommelein,et al. “Lean” Comparison Using Process Charts of Complex Seismic Retrofit Projects , 2009 .
[85] Olivier de Weck,et al. Platform identification using Design Structure Matrices , 2005 .
[86] A. Posner. Learning to see. , 1955, Eye, ear, nose & throat monthly.
[87] Wolfgang Beitz,et al. Engineering Design: A Systematic Approach , 1984 .