Optimization and simulation of the operational motion of a pantograph: Uplift and retraction

A single-arm pantograph of metro train was studied in this work. The mathematical model of a single-arm pantograph was first established and an optimal design method to obtain the geometric parameters of the pantograph was proposed. The 3D model for the pantograph was then built and the simulation was performed by using virtual prototyping technology to ensure superior performance of the optimized pantograph. The fatigue test of pantograph-insulator system was performed under two operating conditions: Electric pantograph lifting and real train operation. Fatigue test results validated the stability of the optimized pantograph system.

[1]  Lars Drugge,et al.  An Interactive Model of a Pantograph-Catenary System , 1996 .

[2]  Weihua Zhang,et al.  A hybrid method to simulate the interaction of pantograph and catenary on overlap span , 2006 .

[3]  Ning Zhou,et al.  Investigation on dynamic performance and parameter optimization design of pantograph and catenary system , 2011 .

[4]  Young Shin Lee,et al.  Modal characteristics and fatigue strength of compressor blades , 2014 .

[5]  W H Zhang,et al.  A Study on Dynamic Behaviour of Pantographs by Using Hybrid Simulation Method , 2005 .

[6]  Li Feng-liang Establishment of the pantographs mechanical models and measurement of their parameters , 2006 .

[7]  T. X. Wu,et al.  Basic Analytical Study of Pantograph-catenary System Dynamics , 1998 .

[8]  Mo Zu-dong Optimization of Pantograph Mechanism Based on Genetic Algorithms and It's Virtual Prototyping Validation , 2006 .

[9]  Mei Gui-ming Study on Pantograph-catenary System Based on Virtual Prototyping , 2004 .

[10]  Luca Sani,et al.  Innovative Solutions for Overhead Catenary-Pantograph System: Wire Actuated Control and Observed Contact Force , 2000 .

[11]  Jorge Ambrósio,et al.  Optimization of high-speed railway pantographs for improving pantograph-catenary contact , 2013 .

[12]  Jangbom Chai,et al.  Dynamic analysis of a pantograph–catenary system using absolute nodal coordinates , 2006 .

[13]  Tomomi Yagi,et al.  SIMULATION AND VISUALISATION OF THE DYNAMIC BEHAVIOUR OF AN OVERHEAD POWER SYSTEM WITH CONTACT BREAKING. , 1996 .

[14]  R-A Stela,et al.  Chaos theory based control of contact force in electric railway transportation system , 2012, 2012 11th International Conference on Environment and Electrical Engineering.

[15]  W. Kortüm,et al.  Pantograph/Catenary Dynamics and Control , 1997 .

[16]  Michael J. Brennan,et al.  DYNAMIC STIFFNESS OF A RAILWAY OVERHEAD WIRE SYSTEM AND ITS EFFECT ON PANTOGRAPH–CATENARY SYSTEM DYNAMICS , 1999 .

[17]  Weihua Zhang,et al.  Evaluation of the coupled dynamical response of a pantograph—catenary system: contact force and stresses , 2006 .