Adaptive parallel job scheduling with resource admissible allocation on two-level hierarchical grids
暂无分享,去创建一个
Uwe Schwiegelshohn | Andrei Tchernykh | Juan Manuel Ramírez-Alcaraz | Ramin Yahyapour | Vanessa Miranda-López | Adan Hirales-Carbajal | José Luis González-García | Ariel Quezada-Pina | U. Schwiegelshohn | R. Yahyapour | Andrei Tchernykh | V. Miranda-López | Ariel Quezada-Pina | Adán Hirales-Carbajal
[1] Uwe Schwiegelshohn,et al. A system-centric metric for the evaluation of online job schedules , 2011, J. Sched..
[2] Andrei Tchernykh,et al. Two Level Job-Scheduling Strategies for a Computational Grid , 2005, PPAM.
[3] Klaus Jansen,et al. A Fast 5/2-Approximation Algorithm for Hierarchical Scheduling , 2010, Euro-Par.
[4] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[5] Ladislau Bölöni,et al. A Comparison of Eleven Static Heuristics for Mapping a Class of Independent Tasks onto Heterogeneous Distributed Computing Systems , 2001, J. Parallel Distributed Comput..
[6] Hui Li,et al. A novel multi-objective optimization scheme for grid resource allocation , 2008, MGC '08.
[7] Dan Tsafrir,et al. Backfilling Using System-Generated Predictions Rather than User Runtime Estimates , 2007, IEEE Transactions on Parallel and Distributed Systems.
[8] Ronald L. Graham,et al. Bounds for Multiprocessor Scheduling with Resource Constraints , 1975, SIAM J. Comput..
[9] Uwe Schwiegelshohn,et al. Online scheduling in grids , 2008, 2008 IEEE International Symposium on Parallel and Distributed Processing.
[10] Dennis Gannon,et al. Workflows for e-Science, Scientific Workflows for Grids , 2014 .
[11] Rajkumar Buyya,et al. A taxonomy and survey on autonomic management of applications in grid computing environments , 2011 .
[12] Ian T. Foster. Globus Toolkit Version 4: Software for Service-Oriented Systems , 2005, NPC.
[13] Francisco Vilar Brasileiro,et al. Trading Cycles for Information: Using Replication to Schedule Bag-of-Tasks Applications on Computational Grids , 2003, Euro-Par.
[14] Helen D. Karatza,et al. Resource Allocation Strategies in a 2-Level Hierarchical Grid System , 2008, 41st Annual Simulation Symposium (anss-41 2008).
[15] David Abramson,et al. Economic models for resource management and scheduling in Grid computing , 2002, Concurr. Comput. Pract. Exp..
[16] Francine Berman,et al. A Decoupled Scheduling Approach for the GrADS Program Development Environment , 2002, ACM/IEEE SC 2002 Conference (SC'02).
[17] Jarek Nabrzyski,et al. Dynamic grid scheduling with job migration and rescheduling in the GridLab resource management system , 2004, Sci. Program..
[18] Ramin Yahyapour,et al. Design and evaluation of job scheduling strategies for grid computing , 2000, GRID.
[19] Ruay-Shiung Chang,et al. Improving job scheduling algorithms in a grid environment , 2011, Future Gener. Comput. Syst..
[20] Uwe Schwiegelshohn,et al. Job Allocation Strategies with User Run Time Estimates for Online Scheduling in Hierarchical Grids , 2011, Journal of Grid Computing.
[21] Liana L. Fong,et al. Grid broker selection strategies using aggregated resource information , 2010, Future Gener. Comput. Syst..
[22] Liang-Teh Lee,et al. An Adaptive Task Scheduling System for Grid Computing , 2006, The Sixth IEEE International Conference on Computer and Information Technology (CIT'06).
[23] Rajkumar Buyya,et al. A Taxonomy of Workflow Management Systems for Grid Computing , 2005, Proceedings of the 38th Annual Hawaii International Conference on System Sciences.
[24] Rajkumar Buyya,et al. Model-based simulation and performance evaluation of grid scheduling strategies , 2009, Future Gener. Comput. Syst..
[25] Krzysztof Rzadca,et al. Cooperation in Multi-organization Scheduling , 2009, Euro-Par.
[26] Arutyun Avetisyan,et al. Comparison of scheduling heuristics for grid resource broker , 2004, Proceedings of the Fifth Mexican International Conference in Computer Science, 2004. ENC 2004..
[27] Akshai K. Aggarwal,et al. An adaptive generalized scheduler for grid applications , 2005, 19th International Symposium on High Performance Computing Systems and Applications (HPCS'05).
[28] Hong Peng,et al. Static strategy and dynamic adjustment: An effective method for Grid task scheduling , 2009, Future Gener. Comput. Syst..
[29] Uwe Schwiegelshohn,et al. Online Hierarchical Job Scheduling on Grids , 2008 .
[30] Uwe Schwiegelshohn,et al. On an on-line scheduling problem for parallel jobs , 2002, Inf. Process. Lett..
[31] Ilias Kotsireas,et al. Proceedings, 19th International Symposium on High Performance Computing Systems and Applications, HPCS 2005 : 15-18 May 2005, Guelph, Ontario, Canada , 2005 .
[32] U. Schwiegelshohn. MISTA 2009 An Owner-centric Metric for the Evaluation of Online Job Schedules , 2009 .
[33] David A. Lifka,et al. The ANL/IBM SP Scheduling System , 1995, JSSPP.
[34] Morteza Analoui,et al. A Novel Process Mapping Strategy in Clustered Environments , 2012, Grid 2012.
[35] Joseph Naor,et al. On-Line Load Balancing in a Hierarchical Server Topology , 2002, SIAM J. Comput..
[36] Uwe Schwiegelshohn,et al. On-line hierarchical job scheduling on grids with admissible allocation , 2010, J. Sched..