Incorporating socio-economic effects and uncertain rainfall in flood mitigation decision using MCDA
暂无分享,去创建一个
Edmond Y.M. Lo | Youngho Chang | Youngho Chang | E. Lo | H. Su | Velautham Daksiya | Hsin Ting Su | Velautham Daksiya | Y. Chang | V. Daksiya
[1] Guoqing Wang,et al. Changes in precipitation and temperature in Xiangjiang River Basin, China , 2016, Theoretical and Applied Climatology.
[2] Yeou-Koung Tung,et al. Multi-criteria decision making under uncertainty for flood mitigation , 2014, Stochastic Environmental Research and Risk Assessment.
[3] Tao Tao,et al. Multi-Objective Optimal Design of Detention Tanks in the Urban Stormwater Drainage System: Framework Development and Case Study , 2015, Water Resources Management.
[4] R. Leconte,et al. Uncertainty of downscaling method in quantifying the impact of climate change on hydrology , 2011 .
[5] K. M. de Bruijn,et al. Resilience and flood risk management: a systems approach applied to lowland rivers , 2005 .
[6] Nicolas G. Wright,et al. Reducing the complexity of the flood vulnerability index , 2010 .
[7] N. Wright,et al. Flood vulnerability indices at varying spatial scales. , 2009, Water science and technology : a journal of the International Association on Water Pollution Research.
[8] J. Aerts,et al. Global exposure to river and coastal flooding - long term trends and changes , 2012 .
[9] Joern Birkmann,et al. Measuring Vulnerability to Natural Hazards: towards disaster resilient societies , 2007 .
[10] Aart Overeem,et al. Rainfall depth-duration-frequency curves and their uncertainties , 2008 .
[11] Tao Tao,et al. Multi-objective Optimal Design of Detention Tanks in the Urban Stormwater Drainage System: Uncertainty and Sensitivity Analysis , 2016, Water Resources Management.
[12] I. Faisal,et al. Non-structural flood mitigation measures for Dhaka City , 1999 .
[14] D. Diakoulaki,et al. Design and implementation of a group DSS for sustaining renewable energies exploitation , 1998, Eur. J. Oper. Res..
[15] O. Edenhofer,et al. Mitigation from a cross-sectoral perspective , 2007 .
[16] B. Merz,et al. Quantification of uncertainties in flood risk assessments , 2008 .
[17] M. B. Abbott,et al. Flood Risk and Social Justice: From Quantitative to Qualitative Flood Risk Assessment and Mitigation , 2012 .
[18] Hitoshi Furuta,et al. Life-cycle cost analysis and design of civil infrastructure systems , 2001 .
[19] V. Guinot,et al. Treatment of precipitation uncertainty in rainfall-runoff modelling: a fuzzy set approach , 2004 .
[20] K. Shine,et al. Intergovernmental panel on Climate change (IPCC),in encyclopedia of Enviroment and society,Vol.3 , 2007 .
[21] Christel Prudhomme,et al. Uncertainty and climate change impact on the flood regime of small UK catchments , 2003 .
[22] Analysing Uncertain Rainfall in Flood Mitigation using MCDA , 2015 .
[23] Dodo J. Thampapillai,et al. Flood Damage Mitigation: A Review of Structural and Nonstructural Measures and Alternative Decision Frameworks , 1985 .
[24] Joern Birkmann,et al. Risk and vulnerability indicators at different scales: Applicability, usefulness and policy implications , 2007 .