Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in Oman

Change orders are usually issued to cover variations in scope of work, material quantities, design errors, and unit rate changes. This paper discusses variations in public construction projects in Oman by investigating causes of variations, studying their effects on the project, identifying the beneficial parties, and suggesting remedies to alleviate related problems. Tasks included an analysis of four actual case studies and conducting a field survey via a questionnaire. It was determined that the client's additional works and modifications to design were the most important factors causing change orders, followed by the nonavailability of construction manuals and procedures. The most important effects of change orders on the project were found to be the schedule delays, disputes, and cost overruns. The contractor was found to be the party most benefiting from the change orders followed by the consultant and then the client. A set of remedial actions were suggested and respondents viewed that the revision of registration of consulting offices would be the most important action followed by establishing standard documents for design procedures and building a national database about soil conditions and services.

[1]  C. William Ibbs Quantitative Impacts of Project Change: Size Issues , 1997 .

[2]  B. N. Rao,et al.  Knowledge based Decision Support Tool for Duration and Cost Overrun Analysis of Highway Construction Projects , 2007 .

[3]  Jin-Kyung Lee,et al.  Cost Overrun and Cause in Korean Social Overhead Capital Projects: Roads, Rails, Airports, and Ports , 2008 .

[4]  Edem O. P. Akpan,et al.  METHODOLOGY FOR DETERMINING PRICE VARIATION IN PROJECT EXECUTION , 2001 .

[5]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[6]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[7]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[8]  Awad S. Hanna,et al.  Quantitative Definition of Projects Impacted by Change Orders , 2002 .

[9]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[10]  Ting-ya Hsieh,et al.  Statistical analysis of causes for design change in highway construction on Taiwan , 2005 .

[11]  R.A. Perkins Sources of Changes in Design-Build Contracts for a Governmental Owner , 2007, PICMET '07 - 2007 Portland International Conference on Management of Engineering & Technology.

[12]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[13]  Amr A Oloufa,et al.  Reconciliation of Owner and Contractor Views in Heavy Construction Projects , 2008 .

[14]  Jieh-Haur Chen,et al.  Hybrid ANN-CBR model for disputed change orders in construction projects , 2007 .

[15]  Young Dai Lee,et al.  Conflicting factors in construction projects: Korean perspective , 2006 .