Stochastic rail life cycle cost maintenance modelling using Monte Carlo simulation

The need for decision support systems to guide maintenance and renewal decisions for infrastructure is growing due to tighter budget requirements and the concurrent need to satisfy reliability, availability and safety requirements. The rail of the railway track is one of the most important components of the entire track structure and can significantly influence maintenance costs throughout the life cycle of the track. Estimation of life cycle cost is a popular decision support system. A calculated life cycle cost has inherent uncertainty associated with the reliability of the input data used in such a model. A stochastic life cycle cost model was developed for the rail of the railway track incorporating imperfect inspections. The model was implemented using Monte Carlo simulation in order to allow quantification of the associated uncertainty within the life cycle cost calculated. For a given set of conditions, an optimal renewal tonnage exists at which the rail should be renewed in order to minimise the mean life cycle cost. The optimal renewal tonnage and minimum attainable mean life cycle cost are dependent on the length of inspection interval, weld type used for maintenance as well as the cost of maintenance and inspection activities. It was found that the distribution of life cycle cost for a fixed renewal tonnage followed a log-normal probability distribution. The standard deviation of this distribution can be used as a metric to quantify uncertainty. Uncertainty increases with an increase in the length of inspection interval for a fixed rail renewal tonnage. With all other conditions fixed, it was found that the uncertainty in life cycle cost increases with an increase in the rail renewal tonnage. The relative contribution of uncertainty of the planned and unplanned maintenance costs towards the uncertainty in total life cycle cost was found to be dependent on the length of inspection interval.

[1]  J.-K. Chan,et al.  Modeling repairable systems with failure rates that depend on age and maintenance , 1993 .

[2]  Rolf Dollevoet,et al.  Dutch research results on wheel/rail interface management: 2001–2013 and beyond , 2014 .

[3]  Hisashi Kobayashi,et al.  Probability, Random Processes, and Statistical Analysis: Moment-generating function and characteristic function , 2011 .

[4]  Saurabh Kumar,et al.  A study of the rail degradation process to predict rail breaks , 2006 .

[5]  Enrico Zio,et al.  A risk based approach to determine type of ultrasonic inspection and frequencies in railway applications , 2003 .

[6]  D. Vats Simulation and the Monte Carlo Method, 3rd ed. , 2019, Journal of the American Statistical Association.

[7]  S. L. Grassie,et al.  Rail defects: an overview , 2003 .

[8]  Jianmin Zhao,et al.  Assessing the Economic Life of Rail Using a Stochastic Analysis of Failures , 2006 .

[9]  Michael Patriksson,et al.  An optimal age–usage maintenance strategy containing a failure penalty for application to railway tracks , 2016 .

[10]  Hoon Kim,et al.  Monte Carlo Statistical Methods , 2000, Technometrics.

[11]  Arjen Zoeteman,et al.  Life cycle cost analysis for managing rail infrastructure Concept of a decision support system for railway design and maintenance , 2001 .

[12]  D. Cox,et al.  An Analysis of Transformations , 1964 .

[13]  Hoang Pham,et al.  A quasi renewal process and its applications in imperfect maintenance , 1996, Int. J. Syst. Sci..

[14]  Rommert Dekker,et al.  Applications of maintenance optimization models : a review and analysis , 1996 .

[15]  Jianmin Zhao,et al.  Probabilistic Model for Predicting Rail Breaks and Controlling Risk of Derailment , 2007 .

[16]  Cun Hua Qian,et al.  Optimal preventive maintenance policies for a shock model with given damage level , 2005 .

[17]  D. F. Cannon,et al.  Rail rolling contact fatigue Research by the European Rail Research Institute , 1996 .

[18]  Toshio Nakagawa,et al.  A cumulative damage shock model with imperfect preventive maintenance , 1991 .

[19]  Bryan W. Schlake,et al.  Train Delay and Economic Impact of In-Service Failures of Railroad Rolling Stock , 2011 .

[20]  Toshio Nakagawa,et al.  Optimum Policies for a System with Imperfect Maintenance , 1987, IEEE Transactions on Reliability.

[21]  António Ramos Andrade,et al.  Renewal decisions from a Life-cycle Cost (LCC) Perspective in Railway Infrastructure: An integrative approach using separate LCC models for rail and ballast components , 2008 .

[22]  J. J. Marais,et al.  Rail integrity management by means of ultrasonic testing , 2003 .

[23]  Uday Kumar,et al.  Holistic procedure for rail maintenance in Sweden , 2008 .

[24]  Henry W. Block,et al.  Age-dependent minimal repair , 1985, Journal of Applied Probability.

[25]  Joe Kalousek,et al.  The blending of theory and practice in modern rail grinding , 2003 .

[26]  H. Pham,et al.  Invited reviewImperfect maintenance , 1996 .

[27]  A M Zarembski FORECASTING OF TRACK COMPONENT LIVES AND ITS USE IN TRACK MAINTENANCE PLANNING , 1991 .

[28]  R. D. Fröhling,et al.  Wheel/rail interface management in heavy haul railway operations—applying science and technology , 2007 .

[29]  Uday Kumar,et al.  Uncertainty estimation in railway track life-cycle cost: a case study from Swedish National Rail Administration , 2009 .

[30]  David Y. Jeong,et al.  RISK/BENEFIT ASSESSMENT OF DELAYED ACTION CONCEPT FOR RAIL INSPECTION , 1999 .

[31]  S L Grassie,et al.  Squats and squat-type defects in rails: the understanding to date , 2012 .

[32]  Jianmin Zhao,et al.  Optimizing Policies of Railway Ballast Tamping and Renewal , 2006 .

[33]  Anthony M. Smith,et al.  Reliability-Centered Maintenance , 1992 .

[34]  D. A. Jablonski,et al.  Simulation of railroad crack growth life using laboratory specimens , 1990 .

[35]  U. Kumar,et al.  Uncertainty in Life Cycle Cost of railway track , 2008, 2008 Annual Reliability and Maintainability Symposium.

[36]  David Y. Jeong,et al.  Damage tolerance analysis of detail fractures in rail , 1997 .

[37]  G. Chattopadhyay,et al.  Development of integrated model for assessment of operational risks in rail track , 2007, 2007 IEEE International Conference on Industrial Engineering and Engineering Management.