Pantograph–catenary interaction: recent achievements and future research challenges
暂无分享,去创建一个
Stefano Bruni | Giuseppe Bucca | Andrea Collina | Alan Facchinetti | Marco Carnevale | S. Bruni | A. Collina | A. Facchinetti | G. Bucca | M. Carnevale
[1] G Galeotti,et al. Servo Actuated Railway Pantograph for High-Speed Running with Constant Contact Force , 1993 .
[2] Weihua Zhang,et al. Evaluation of the coupled dynamical response of a pantograph—catenary system: contact force and stresses , 2006 .
[3] Jorge Ambrósio,et al. A Memory Based Communication in the Co-simulation of Multibody and Finite Element Codes for Pantograph-Catenary Interaction Simulation , 2009 .
[4] Zhiyun Shen,et al. Progress in high-speed train technology around the world , 2011 .
[5] Mitsuru Ikeda,et al. Flow Control on Pantograph with Air Intake and Outlet , 2007 .
[6] A. Collina,et al. A procedure for the wear prediction of collector strip and contact wire in pantograph–catenary system , 2009 .
[7] Ferruccio Resta,et al. Impact of overhead line irregularity on current collection and diagnostics based on the measurement of pantograph dynamics , 2007 .
[8] Jorge Ambrósio,et al. PantoCat statement of method , 2015 .
[9] Mitsuru Ikeda,et al. Numerical Estimation of Aerodynamic Interference between Panhead and Articulated Frame , 2009 .
[10] Lars Finner,et al. Program for catenary–pantograph analysis, PrOSA statement of methods and validation according EN 50318 , 2015 .
[11] Stefano Bruni,et al. Real-time catenary models for the hardware-in-the-loop simulation of the pantograph–catenary interaction , 2013 .
[12] P Delfosse,et al. MEASUREMENT OF CONTACT PRESSURE BETWEEN PANTOGRAPH AND CATENARY , 1983 .
[13] Jongsoo Lee,et al. Prediction of low-speed aerodynamic load and aeroacoustic noise around simplified panhead section model , 2008 .
[14] Stefano Bruni,et al. Special issue on the pantograph–catenary interaction benchmark , 2015 .
[15] Alan Facchinetti,et al. Procedure to assess the role of railway pantograph components in generating the aerodynamic uplift , 2017 .
[16] Carmine Maria Pappalardo,et al. Contact force control in multibody pantograph/catenary systems , 2016 .
[17] Ferruccio Resta,et al. SOME CONSIDERATIONS ON THE AERODYNAMICS OF HIGH SPEED PANTOGRAPH : CFD AND WIND TUNNEL TESTS , 2008 .
[18] R. Manory,et al. Wear of railway contact wires against current collector materials , 1998 .
[19] Giuseppe Bucca,et al. Assessment of current collection quality of ETR1000-V300 Zefiro pantograph: an innovative measurement set-up and test results , 2016 .
[20] Hongrui Wang,et al. Active control of contact force for high-speed railway pantograph-catenary based on multi-body pantograph model , 2017 .
[21] Warren P. Seering,et al. Active Control of a High-Speed Pantograph , 1997 .
[22] Johannes Gerstmayr,et al. Analysis of Thin Beams and Cables Using the Absolute Nodal Co-ordinate Formulation , 2006 .
[23] Alan Facchinetti,et al. Computational fluid dynamics as a means of assessing the influence of aerodynamic forces on the mean contact force acting on a pantograph , 2016 .
[24] Rainer Puschmann,et al. Contact Lines for Electric Railways: Planning, Design, Implementation, Maintenance , 2001 .
[25] Mitsuru Ikeda,et al. DEVELOPMENT OF LOW NOISE PANTOGRAPH WITH PASSIVE LIFT SUPPRESSION MECHANISM OF PANHEAD , 2000 .
[26] Etienne Balmes,et al. Fatigue analysis of catenary contact wires for high speed trains , 2011 .
[27] Guo Jingbo,et al. Research of the active control for high-speed train pantograph , 2008, 2008 IEEE Conference on Cybernetics and Intelligent Systems.
[28] Petter Nåvik,et al. Identification of system damping in railway catenary wire systems from full-scale measurements , 2016 .
[29] Martin Arnold,et al. Pantograph and catenary dynamics: a benchmark problem and its numerical solution , 2000 .
[30] Stefan Jakubek,et al. Catenary emulation for hardware-in-the-loop pantograph testing with a model predictive energy-conserving control algorithm , 2017 .
[31] Jorge Ambrósio,et al. Influence of the aerodynamic forces on the pantograph–catenary system for high-speed trains , 2009 .
[32] A. Facchinetti,et al. An Application of Active Control to the Collector of an High-Speed Pantograph: Simulation and Laboratory Tests , 2005, Proceedings of the 44th IEEE Conference on Decision and Control.
[33] T. X. Wu,et al. Active vibration control of a railway pantograph , 1997 .
[34] Rung-Fang Chang,et al. Optimal PID controller for high-speed rail pantograph system with notch filter , 2009, TENCON 2009 - 2009 IEEE Region 10 Conference.
[35] Ferruccio Resta,et al. On the use of a hardware in the loop set-up for pantograph dynamics evaluation , 2008 .
[36] Luca Sani,et al. Innovative Solutions for Overhead Catenary-Pantograph System: Wire Actuated Control and Observed Contact Force , 2000 .
[37] Alessandro Pisano,et al. Contact force estimation and regulation in active pantographs: An algebraic observability approach , 2007, 2007 46th IEEE Conference on Decision and Control.
[38] Yang Song,et al. Nonlinear analysis of wind-induced vibration of high-speed railway catenary and its influence on pantograph–catenary interaction , 2016 .
[39] Minho Kwak,et al. Aerodynamic Characteristics of High Speed Train Pantograph with the Optimized Panhead Shape , 2009 .
[40] Francisco Chinesta,et al. Fast simulation of the pantographcatenary dynamic interaction , 2017 .
[41] Riccardo Licciardello,et al. TrioTRAIN: bringing research and standardisation closer together , 2014 .
[42] Ning Zhou,et al. Statement of methods , 2015 .
[43] Alan Facchinetti,et al. Unsteady aerodynamic forces on a railway pantograph and their influence on pantograph-catenary dynamic interaction , 2018 .
[44] Chan-Kyoung Park,et al. A Study on the Measuring System of Contact Force of Pantograph for the High-Speed Train , 2012 .
[45] Parag A. Pathak,et al. Massachusetts Institute of Technology , 1964, Nature.
[46] Michael J. Brennan,et al. DYNAMIC STIFFNESS OF A RAILWAY OVERHEAD WIRE SYSTEM AND ITS EFFECT ON PANTOGRAPH–CATENARY SYSTEM DYNAMICS , 1999 .
[47] Yong Hyeon Cho,et al. SPOPS statement of methods , 2015 .
[48] Simon D. Walters. Simulation of Fuzzy Control Applied to a Railway Pantograph-Catenary System , 2010, KES.
[49] Giuseppe Bucca,et al. Adoption of different pantographs’ preloads to improve multiple collection and speed up existing lines , 2012 .
[50] Thomas Bosselmann,et al. An approach to continuous on-site monitoring of contact forces in current collectors by a fiber optic sensing system , 2013 .
[51] Luis Baeza,et al. PACDIN statement of methods , 2015 .
[52] Ning Zhou,et al. TPL-PCRUN Statement of methods , 2015 .
[53] Benedetto Allotta,et al. Experimental campaign on a servo-actuated pantograph , 2001, 2001 IEEE/ASME International Conference on Advanced Intelligent Mechatronics. Proceedings (Cat. No.01TH8556).
[54] Mitsuru Ikeda,et al. The results of the pantograph–catenary interaction benchmark , 2015 .
[55] Mehmet Karaköse,et al. Anomaly detection using a modified kernel-based tracking in the pantograph-catenary system , 2015, Expert Syst. Appl..
[56] Stefano Bruni,et al. Hardware-in-the-loop hybrid simulation of pantograph–catenary interaction , 2012 .
[57] Alan Facchinetti,et al. Assessing Aerodynamic Effects on a Railway Pantograph by means of Computational Fluid Dynamics , 2016 .
[58] Mitsuru Ikeda,et al. Experimental method for wind tunnel tests to simulate turbulent flow on the roof of high-speed trains , 2012 .
[59] Stefano Bruni,et al. PCaDA statement of methods , 2015 .
[60] A. Carnicero,et al. Active control strategy on a catenary–pantograph validated model , 2013 .
[61] Stefano Bruni,et al. Numerical Simulation of Pantograph-Overhead Equipment Interaction , 2002 .
[62] Luca Sani,et al. Wavelet multiresolution analysis for monitoring the occurrence of arcing on overhead electrified railways , 2003 .
[63] Alberto Carnicero López,et al. Influence of stiffness and contact modelling on catenary pantograph system dynamics , 2007 .
[64] Ferruccio Resta,et al. Pantograph aerodynamic effects on the pantograph–catenary interaction , 2006 .
[65] J. P. Laine,et al. Pantograph–catenary dynamics simulation , 2006 .
[66] M. Bocciolone,et al. Application of SMA Composites in the Collectors of the Railway Pantograph for the Italian High-Speed Train , 2009, Journal of Materials Engineering and Performance.
[67] Marco Mauri,et al. Hardware-in-the-Loop Overhead Line Emulator for Active Pantograph Testing , 2009, IEEE Transactions on Industrial Electronics.
[68] Luca Sani,et al. Phototube sensor for monitoring the quality of current collection on overhead electrified railways , 2001 .
[69] Yu Chen,et al. Numerical research on aerodynamic characteristic optimization of pantograph fixing place on high speed train , 2009, 2009 2nd International Conference on Power Electronics and Intelligent Transportation System (PEITS).
[70] Alessandro Pisano,et al. Contact force regulation in wire-actuated pantographs via variable structure control and frequency-domain techniques , 2008, Int. J. Control.
[71] Jorge Ambrósio,et al. A COMPUTATIONAL PROCEDURE FOR THE DYNAMIC ANALYSIS OF THE CATENARY-PANTOGRAPH INTERACTION IN HIGH-SPEED TRAINS , 2012 .
[72] Jangbom Chai,et al. Dynamic analysis of a pantograph–catenary system using absolute nodal coordinates , 2006 .
[73] Hiroyuki Sugiyama,et al. Three-Dimensional Large Deformation Analysis of the Multibody Pantograph/Catenary Systems , 2005 .
[74] P. Pintado,et al. Dynamic interaction between pantograph and rigid overhead lines using a coupled FEM — multibody procedure , 2016 .
[75] W. Kortüm,et al. Pantograph/Catenary Dynamics and Control , 1997 .
[76] Hyeok-bin Kwon,et al. Analysis and Comparison of Experimental Results Both of Wind Tunnel Test and Running Test for HEMU-400X Pantograph , 2012 .
[77] Chikara Yamashita,et al. Sliding wear behavior of copper alloy impregnated C/C composites under an electrical current , 2013 .
[78] Giuseppe Bucca,et al. ELECTROMECHANICAL INTERACTION BETWEEN CARBON BASED PANTOGRAPH STRIP AND COPPER CONTACT WIRE: A HEURISTIC WEAR MODEL , 2015 .
[79] D P Stoten,et al. Dynamically Substructured System Testing for Railway Vehicle Pantographs , 2016 .
[80] A. Bobillot,et al. Pantograph-Catenary: a High-Speed European couple , 2008 .
[81] Mitsuru Ikeda,et al. Evaluation Method of Low-Frequency Aeroacoustic Noise Source Structure Generated by Shinkansen Pantograph , 2008 .
[82] Giuseppe Bucca,et al. Optical sensors for the analysis of pantograph-catenary interaction , 2016 .
[83] Tomás Rojo,et al. A Mathematical Model of the Pantograph-Catenary Dynamic Interaction with Several Contact Wires , 2007 .
[84] W H Zhang,et al. A Study on Dynamic Behaviour of Pantographs by Using Hybrid Simulation Method , 2005 .
[85] Luis Baeza,et al. A 3D absolute nodal coordinate finite element model to compute the initial configuration of a railway catenary , 2014 .
[86] Mitsuru Ikeda. ‘Gasen-do FE’ statement of methods , 2015 .
[87] Etienne Balmes,et al. OSCAR statement of methods , 2015 .
[88] Wei Liu,et al. Influence of a high-speed train passing through a tunnel on pantograph aerodynamics and pantograph–catenary interaction , 2017 .
[89] A. Collina,et al. Effect of collector deformable modes in pantograph—catenary dynamic interaction , 2009 .
[90] Kiwon Lee,et al. Bending fatigue life evaluation of Cu-Mg alloy contact wire , 2014 .
[91] Guowei Yang,et al. The influence of pantograph aerodynamic characteristics caused by its shroud , 2012 .
[92] J. Averseng,et al. Control system for catenary — Pantograph dynamic interaction force , 2010, 2010 International Joint Conference on Computational Cybernetics and Technical Informatics.
[93] T. Vinayagalingam. Computer Evaluation of Controlled Pantographs for Current Collection From Simple Catenary Overhead Equipment at High Speed , 1983 .
[94] Petter Nåvik,et al. Variation in predicting pantograph–catenary interaction contact forces, numerical simulations and field measurements , 2017 .
[95] Stefano Bruni,et al. Numerical and Hardware-In-the-Loop Tools for the Design of Very High Speed Pantograph-Catenary Systems , 2012 .
[96] Lars Drugge,et al. Study of Critical Sections in Catenary Systems During Multiple Pantograph Operation , 2005 .
[97] Jorge Ambrósio,et al. Optimization of high-speed railway pantographs for improving pantograph-catenary contact , 2013 .
[98] Hongrui Wang,et al. Sliding Mode Control with PD Sliding Surface for High-Speed Railway Pantograph-Catenary Contact Force under Strong Stochastic Wind Field , 2017 .
[99] Jiye Zhang,et al. Influence of pantograph fixing position on aerodynamic characteristics of high-speed trains , 2017 .
[100] Giuseppe Bucca,et al. Experimental Analysis of the Influence of the Electrical Arc on the Wear Rate of Contact Strip and Contact Wire in a.c. System , 2017 .
[101] Takayuki Usuda,et al. Contact force control of an active pantograph for high speed trains , 2016 .
[102] Petter Nåvik,et al. A wireless railway catenary structural monitoring system: Full-scale case study , 2016 .
[103] Stefano Bruni,et al. PANTOGRAPH-CATENARY DYNAMIC INTERACTION IN THE MEDIUM-HIGH FREQUENCY RANGE , 2004 .
[104] F. Tanarro,et al. OHMS-real-time analysis of the pantograph-catenary interaction to reduce maintenance costs , 2011 .
[105] Michael Kolbe,et al. - 1-Development of an actively controlled , acoustically optimised single arm pantograph , 2001 .
[106] Weihua Zhang,et al. Hybrid Simulation of Dynamics for the Pantograph-Catenary System , 2002 .
[107] Yong Hyeon Cho,et al. Numerical simulation of the dynamic responses of railway overhead contact lines to a moving pantograph, considering a nonlinear dropper , 2008 .
[108] Luca Sani,et al. Hough transform and thermo-vision for monitoring pantograph-catenary system , 2006 .
[109] Leonard G. C. Hamey,et al. Pancam: In-Service Inspection of Locomotive Pantographs , 2007, 9th Biennial Conference of the Australian Pattern Recognition Society on Digital Image Computing Techniques and Applications (DICTA 2007).
[110] Marco Francesco Bocciolone,et al. A novel design of a compact S-shaped balance with FBG sensors for the pantograph-catenary contact force measurement , 2012, Other Conferences.
[111] Wang Xiaocui,et al. Experimental study on arc ablation occurring in a contact strip rubbing against a contact wire with electrical current , 2013 .
[112] Koji Kato,et al. Wear mechanism of copper alloy wire sliding against iron-base strip under electric current , 1998 .
[113] L. Pugi,et al. Design and Experimental Results of an Active Suspension System for a High-Speed Pantograph , 2008, IEEE/ASME Transactions on Mechatronics.
[114] Giuseppe Bucca,et al. Pantograph-catenary monitoring by means of fibre Bragg grating sensors: Results from tests in an underground line , 2013 .
[115] Andrea Collina,et al. Processing of collector acceleration data for condition-based monitoring of overhead lines , 2016 .
[116] A. Facchinetti,et al. A feasibility study of an aerodynamic control for a high speed pantograph , 2007, 2007 IEEE/ASME international conference on advanced intelligent mechatronics.
[117] Ahmed A. Shabana,et al. Pantograph/Catenary Contact Formulations , 2017 .
[118] Shunichi Kubo,et al. Effect of arc discharge on the wear rate and wear mode transition of a copper-impregnated metallized carbon contact strip sliding against a copper disk , 1999 .
[119] Wang Xiaocui,et al. Friction and wear behavior of pure carbon strip sliding against copper contact wire under AC passage at high speeds , 2011 .
[120] Ferruccio Resta,et al. High Speed Railway: Collecting Pantographs Active Control and Overhead Lines Diagnostic Solutions , 1998 .
[121] F. A. Benson,et al. Wear in simulated railway overhead current collection systems , 1988 .
[122] Ali Daadbin,et al. Development, Testing and Implementation of the Pantograph Damage Assessment System (PANDAS) , 2010 .