Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system
暂无分享,去创建一个
[1] 大野 耐一,et al. Toyota production system : beyond large-scale production , 1988 .
[2] Chao-Kuei Huang. An integrated vendor-buyer cooperative inventory model for items with imperfect quality , 2002 .
[3] Roger G. Schroeder,et al. The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .
[4] P. Kelle,et al. Coordinating ordering/shipment policy for buyer and supplier: Numerical and empirical analysis of influencing factors , 2007 .
[5] A. Banerjee,et al. An integrated JIT inventory model , 1995 .
[6] S. G. Deshmukh,et al. Integrated procurement-production systems: A review , 1992 .
[7] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[8] Bhaba R. Sarker,et al. Supply chain models for an assembly system with preprocessing of raw materials , 2007, Eur. J. Oper. Res..
[9] Prafulla Joglekar. Note-Comments on A Quantity Discount Pricing Model to Increase Vendor Profits , 1988 .
[10] J. Pan,et al. Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain , 2008 .
[11] N. Bryson,et al. Joint Vendor-buyer Policy in JIT Manufacturing , 1995 .
[12] L. Ouyang,et al. An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .
[13] Peter Kelle,et al. Partnership and negotiation support by joint optimal ordering/setup policies for JIT , 2003 .
[14] B. Sarker,et al. Economic manufacturing quantity in a just-in-time delivery system , 1992 .
[15] Bhaba R. Sarker,et al. An optimal batch size for a production system operating under a just-in-time delivery system , 1993 .
[16] James P. Monahan. A Quantity Discount Pricing Model to Increase Vendor Profits , 1984 .
[17] Michael Godfrey,et al. Incorporating transportation costs into inventory replenishment decisions , 2002 .
[18] Peter Kelle,et al. Transition to just‐in‐time purchasing , 1998 .
[19] S. G. Deshmukh,et al. Integrated procurement- production system in a just-in-time environment-modelling and analysis , 1997 .
[20] Jason Chao-Hsien Pan,et al. A study of an integrated inventory with controllable lead time , 2002 .
[21] Jason Chao-Hsien Pan,et al. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .
[22] Daesung Ha,et al. A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage , 2003 .
[23] Shaojun Wang,et al. Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy , 2006, Eur. J. Oper. Res..
[24] A. Banerjee. A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .