Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system

Just-in-time (JIT) procurement is one of the important elements of lean production system. Successful implementation of JIT needs vendor-manufacturer cooperation on small lot size delivery and inbound logistics cost reduction. Unlike the most recent literature focusing on single-vendor and single-buyer integrated inventory systems, this paper studies a multi-vendor integrated procurement-production inventory system that incorporates delivery and shared transportation costs. A multi-vendor optimal model is developed here for deciding the batch size of vendor's production, and delivery frequencies of different vendors to the manufacturer. Solution procedures for two special cases—uncapacitated and capacitated models are developed; especially, a new approximate method for capacitated model is devised. Numerical examples demonstrate the solution mechanism for the model. The results highlight cooperation between vendors and manufacturers on JIT procurement practices.

[1]  大野 耐一,et al.  Toyota production system : beyond large-scale production , 1988 .

[2]  Chao-Kuei Huang An integrated vendor-buyer cooperative inventory model for items with imperfect quality , 2002 .

[3]  Roger G. Schroeder,et al.  The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .

[4]  P. Kelle,et al.  Coordinating ordering/shipment policy for buyer and supplier: Numerical and empirical analysis of influencing factors , 2007 .

[5]  A. Banerjee,et al.  An integrated JIT inventory model , 1995 .

[6]  S. G. Deshmukh,et al.  Integrated procurement-production systems: A review , 1992 .

[7]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[8]  Bhaba R. Sarker,et al.  Supply chain models for an assembly system with preprocessing of raw materials , 2007, Eur. J. Oper. Res..

[9]  Prafulla Joglekar Note-Comments on A Quantity Discount Pricing Model to Increase Vendor Profits , 1988 .

[10]  J. Pan,et al.  Integrated inventory models with fuzzy annual demand and fuzzy production rate in a supply chain , 2008 .

[11]  N. Bryson,et al.  Joint Vendor-buyer Policy in JIT Manufacturing , 1995 .

[12]  L. Ouyang,et al.  An integrated vendor–buyer inventory model with quality improvement and lead time reduction , 2007 .

[13]  Peter Kelle,et al.  Partnership and negotiation support by joint optimal ordering/setup policies for JIT , 2003 .

[14]  B. Sarker,et al.  Economic manufacturing quantity in a just-in-time delivery system , 1992 .

[15]  Bhaba R. Sarker,et al.  An optimal batch size for a production system operating under a just-in-time delivery system , 1993 .

[16]  James P. Monahan A Quantity Discount Pricing Model to Increase Vendor Profits , 1984 .

[17]  Michael Godfrey,et al.  Incorporating transportation costs into inventory replenishment decisions , 2002 .

[18]  Peter Kelle,et al.  Transition to just‐in‐time purchasing , 1998 .

[19]  S. G. Deshmukh,et al.  Integrated procurement- production system in a just-in-time environment-modelling and analysis , 1997 .

[20]  Jason Chao-Hsien Pan,et al.  A study of an integrated inventory with controllable lead time , 2002 .

[21]  Jason Chao-Hsien Pan,et al.  Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment , 2004 .

[22]  Daesung Ha,et al.  A JIT lot-splitting model for supply chain management: Enhancing buyer–supplier linkage , 2003 .

[23]  Shaojun Wang,et al.  Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy , 2006, Eur. J. Oper. Res..

[24]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .