Contractors perception of factors contributing to project delay: case studies of commercial projects in Klang Valley, Malaysia

Delay in construction projects is a situation where the project cannot be completed under the planned time. It is a common issue faced in the construction industry all over the world especially in developing countries. In the Malaysian construction industry, 17.3% of construction projects experience more than 3 months delay and some of them are abandoned. Hence, the study of factors contributing to delay is very important in order to reduce the number of projects that experience delay in project delivery. Three objectives of the research have been formulated, namely (1) to identify factors that contribute to delay in construction projects; (2) to analyse and rank the causes of delay rated by contractors; and (3) to study the effects of delay in construction projects. One hundred questionnaires were distributed during data collection stage and only 36 responses received. The respondents only consist of contractors and sub-contractors because the scope of the research focuses on contractors’ perception. The data collected was analysed using SPSS software. Seven factors that contribute to delay were identified through literature review, namely contractors’ financial difficulties, construction mistakes and defective work, labour shortage, coordination problems, shortage of tools and equipment, material shortage and poor site management. Of those factors, the three most important factors were found to be labour shortage, contractors’ financial difficulties and construction mistakes and defective works. Besides project delay, the research shows that cost overrun and extension of time (EOT) are the most common effects of delay in construction projects.

[1]  Jyh-Bin YangJ.-B. Yang,et al.  Using structural equation modeling to analyze relationships among key causes of delay in construction , 2008 .

[2]  G. O. Jagboro,et al.  The effects of construction delays on project delivery in Nigerian construction industry , 2002 .

[3]  D. Arditi,et al.  Reasons for delays in public projects in Turkey , 1985 .

[4]  Jeffrey W. Herrmann,et al.  Rescheduling Manufacturing Systems: A Framework of Strategies, Policies, and Methods , 2003, J. Sched..

[5]  Ram Singh,et al.  Delays and Cost Overruns in Infrastructure Projects -- An Enquiry into Extents, Causes and Remedies , 2009 .

[6]  Biljana Đorđević,et al.  The impact of downsizing on the corporate reputation , 2008 .

[7]  Ayman Abu Hammad,et al.  Delays in construction projects: The case of Jordan , 2008 .

[8]  Mohammed Al-Aghbari,et al.  Factors Affecting Construction Speed of Industrialized Building System in Malaysia , 2005 .

[9]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[10]  N. Mansfield,et al.  Causes of delay and cost overruns in Nigerian construction projects , 1994 .

[11]  Farzad Mahmoodi,et al.  A supplier allocation model considering delivery failure, maintenance and supplier cycle costs , 2006 .

[12]  Augustine Uche Elinwa,et al.  Time-Overrun Factors in Nigerian Construction Industry , 2001 .

[13]  J. Zagorsky,et al.  Do you have to be smart to be rich? The impact of IQ on wealth, income and financial distress , 2007 .

[14]  Ajibade A. Aibinu,et al.  Construction delays and their causative factors in Nigeria , 2006 .

[15]  Zongsheng Liu Strategic Financial Management in Small and Medium-Sized Enterprises , 2010 .

[16]  Lynn Crawford,et al.  Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study , 2003 .

[17]  Ismail Rahmat,et al.  Involvement of key design participants in refurbishment design process , 2008 .

[18]  Tommy Y. Lo,et al.  Construction Delays in Hong Kong Civil Engineering Projects , 2006 .

[19]  Michael T. Callahan,et al.  Construction Delay Claims , 1992 .

[20]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[21]  Maqbool Dada,et al.  A Newsvendor's Procurement Problem when Suppliers Are Unreliable , 2007, Manuf. Serv. Oper. Manag..

[22]  K. Murray,et al.  Reputation – Managing the single greatest risk facing business today , 2004 .

[23]  Mohammed Al-Khalil,et al.  Important causes of delay in public utility projects in Saudi Arabia , 1999 .

[24]  Awad S. Hanna,et al.  Impact of extended overtime on construction labor productivity , 2005 .

[25]  Sameh M. El-Sayegh,et al.  Significant factors causing delay in the UAE construction industry , 2006 .

[26]  Hanifi Binici March 12 and June 6, 2005 Bingol–Karliova earthquakes and the damages caused by the material quality and low workmanship in the recent earthquakes , 2007 .

[27]  Ahmad Anuar Othman,et al.  Factors influencing the construction time of civil engineering projects in Malaysia , 2006 .

[28]  Xianhai Meng,et al.  Taxonomy for change causes and effects in construction projects , 2009 .

[29]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[30]  Stephen O. Ogunlana,et al.  Problems causing delays in major construction projects in Thailand , 2008 .

[31]  Abang Abdullah Abang Ali,et al.  Factors affecting construction labour productivity for Malaysian residential projects , 2005 .

[32]  Terry Williams,et al.  Assessing Extension of Time delays on major projects , 2003 .

[33]  Stephen O. Ogunlana,et al.  Assessment of risks in high rise building construction in Jakarta , 2003 .