Risk Evaluation Based on the Hierarchical Time Delay Model in FMEA
暂无分享,去创建一个
[1] Seung J. Rhee,et al. Using cost based FMEA to enhance reliability and serviceability , 2003, Adv. Eng. Informatics.
[2] Mesut Kumru,et al. Fuzzy FMEA application to improve purchasing process in a public hospital , 2013, Appl. Soft Comput..
[3] Agung Sutrisno,et al. Corrective Action Strategy based on SWOT Analysis in Service FMEA , 2012 .
[4] Agung Sutrisno,et al. Risk Evaluation Based on the Time Dependent Expected Loss Model in FMEA , 2011 .
[5] K. Onodera,et al. Effective techniques of FMEA at each life-cycle stage , 1997, Annual Reliability and Maintainability Symposium.
[6] 김수욱,et al. 서비스 실패 관리를 위한 FMEA 이용 방안 , 2014 .
[7] Nan Liu,et al. Risk evaluation approaches in failure mode and effects analysis: A literature review , 2013, Expert Syst. Appl..
[8] Jiwen Liu,et al. A comparison of FMEA, AFMEA and FTA , 2011, The Proceedings of 2011 9th International Conference on Reliability, Maintainability and Safety.
[9] Hyuck Moo Kwon,et al. An Expected Loss Model for FMEA under Periodic Monitoring of Failure Causes , 2013 .
[10] Hyeon Ae. A Modified Metric of FMEA for Risk Evaluation Based on ASIL of Safety System , 2014 .