Impact of the beam pipe design on the operation parameters of the superconducting magnets for the SIS 100 synchrotron of the FAIR project
暂无分享,去创建一个
S. Y. Shim | C. Heil | P. Schnizer | B. Schnizer | A. Mierau | E. Fischer
[1] Egbert Fischer,et al. Design and study of new cables for superconducting accelerator magnets: Synchrotron SIS 100 at GSI and NICA collider at JINR* , 2010 .
[2] A. Kovalenko,et al. Fast Ramped Superferric Prototypes and Conclusions for the Final Design of the SIS 100 Main Magnets , 2009, IEEE Transactions on Applied Superconductivity.
[3] Egbert Fischer,et al. Full size model manufacturing and advanced design status of the SIS100 main magnets , 2009 .
[4] A. Stafiniak,et al. Commissioning of the Prototype Test Facility for Rapidly-Cycling Superconducting Magnets for FAIR , 2008, IEEE Transactions on Applied Superconductivity.
[5] A. Kovalenko,et al. Full Size Model Magnets for the FAIR SIS100 Synchrotron , 2008, IEEE Transactions on Applied Superconductivity.
[6] P. Shcherbakov,et al. Analysis of the Eddy Current Relaxation Time Effects in the FAIR SIS 100 Main Magnets , 2007, IEEE Transactions on Applied Superconductivity.