Concept Stage Site Assessments, Deepwater Development Risks, and Long-Term Value Preservation: Why Getting it Right the First Time is More Important Than Ever

[1]  W. Haneberg Deterministic and probabilistic approaches to geologic hazard assessment , 2000 .

[2]  William C. Haneberg Stochastic Incorporation of Uncertainty and Subjectivity in Deepwater Pipeline Route Optimization , 2015 .

[3]  K. J. Campbell,et al.  AUV technology for seabed characterization and geohazards assessment , 2015 .

[4]  D. V. Griffiths,et al.  Risk Assessment in Geotechnical Engineering , 2008 .

[5]  William C. Haneberg,et al.  A GIS-based decision-support approach to deepwater drilling-hazard maps , 2015 .

[6]  William C. Haneberg,et al.  Using Qualitative Slope Hazard Maps and Quantitative Probabilistic Slope Stability Models to Constrain Least-Cost Pipeline Route Optimization , 2013 .

[7]  G. Baecher Reliability and Statistics in Geotechnical Engineering , 2003 .

[8]  F. J. Baynes Sources of geotechnical risk , 2010 .

[9]  M. Savazzi,et al.  Ground Model: A High Value Support to Deepwater Giant Developments , 2015 .

[10]  R. N. Edwards,et al.  The Assessment of Marine Gas Hydrates Through Electrical Remote Sounding: Hydrate Without a BSR? , 2000 .

[11]  William C. Haneberg,et al.  Computational geosciences with Mathematica , 2004 .

[12]  S. Constable Ten years of marine CSEM for hydrocarbon exploration , 2010 .

[13]  Incorporating Correlated Variables into GIS-Based Probabilistic Submarine Slope Stability Assessments , 2016 .

[14]  C. Anderson,et al.  An integrated approach to marine electromagnetic surveying using a towed streamer and source , 2010 .

[15]  Kok-Kwang Phoon,et al.  Reliability-Based Design of Foundations-A Modern View , 2012 .

[16]  Kerry J. Campbell,et al.  Modern Deepwater Site Investigation: Getting It Right the First Time , 2008 .