Learning effects and the phenomenon of moving bottlenecks in a two-stage production system

Abstract This paper studies the effects of learning and forgetting on a two-stage production system and the position of a potential bottleneck in the system. We start with developing a model for a two-stage serial production system where semi-finished items are fed by the first stage to the second stage, which, in turn, processes the items to their final state. The finished items are transferred either to a subsequent stage or to customers. The paper assumes that both stages of the production system considered are subject to learning and forgetting effects. Learning quickens the production rate as more experience is gained (i.e., when the number of repetitions increases), while forgetting has the opposite effect when production is intermittent (i.e., experience is lost over production breaks). The paper studies how different values of the learning and forgetting parameters influence the ratio of the production rates of both stages and the flow of material in the system. The results of the paper indicate that learning may cause a bottleneck to shift its position in a production system. This happens when an initially slower stage overtakes a previously faster stage over time due to a higher learning rate. The paper thus contributes to the literature on moving bottlenecks and provides practitioners with a model that helps predicting where bottlenecks may arise in the production system, and which enables the system to flexibly react to moving bottlenecks.

[1]  S. K. Goyal,et al.  Determination of Optimum Production Quantity for a Two-Stage Production System , 1977 .

[2]  Christoph H. Glock,et al.  Single sourcing versus dual sourcing under conditions of learning , 2012, Comput. Ind. Eng..

[3]  A. Z. Szendrovits Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .

[4]  Toly Chen Estimating and incorporating the effects of a future QE project into a semiconductor yield learning model with a fuzzy set approach , 2009 .

[5]  L. J. Thomas,et al.  Heuristics for multilevel lot-sizing with a bottleneck , 1986 .

[6]  Mohamad Y. Jaber,et al.  Managing yield by lot splitting in a serial production line with learning, rework and scrap , 2010 .

[7]  Prafulla Joglekar Note-Comments on A Quantity Discount Pricing Model to Increase Vendor Profits , 1988 .

[8]  Maurice Bonney,et al.  The effects of learning and forgetting on the optimal lot size quantity of intermittent production runs , 1998 .

[9]  Chin-Chia Wu,et al.  Minimizing total completion time in a two-machine flowshop with a learning effect , 2004 .

[10]  Shamsuddin Ahmed,et al.  Application of Taguchi method to analyse the impacts of common process and batch size in multistage production system under uncertain conditions , 2011 .

[11]  Christoph H. Glock,et al.  A multi-stage production-inventory model with learning and forgetting effects, rework and scrap , 2013, Comput. Ind. Eng..

[12]  Allan Carrie,et al.  Simulation of manufacturing systems , 1988 .

[13]  Samuel H. Huang,et al.  Overall throughput effectiveness (OTE) metric for factory-level performance monitoring and bottleneck detection , 2007 .

[14]  Stephan Biller,et al.  Real time production improvement through bottleneck control , 2009 .

[15]  Maurice Bonney,et al.  A comparative study of learning curves with forgetting , 1997 .

[16]  Yu-Cheng Hsiao,et al.  Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain , 2010 .

[17]  Satya S. Chakravorty,et al.  A STUDY OF THE UTILIZATION OF CAPACITY CONSTRAINED RESOURCES IN DRUM‐BUFFER‐ROPE SYSTEMS* , 2009 .

[18]  Lin Li,et al.  Data driven bottleneck detection of manufacturing systems , 2009 .

[19]  Jeffrey T. Macher,et al.  “Managing” Learning by Doing: An Empirical Study in Semiconductor Manufacturing , 2003 .

[20]  T. P. Wright,et al.  Factors affecting the cost of airplanes , 1936 .

[21]  Wendell G. Gilland A simulation study comparing performance of CONWIP and bottleneck-based release rules , 2002 .

[22]  Maurice Bonney,et al.  Lot sizing with learning and forgetting in set-ups and in product quality , 2003 .

[23]  Christoph H. Glock,et al.  Batch sizing with controllable production rates in a multi-stage production system , 2011 .

[24]  Dirk Biskup,et al.  A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..

[25]  J. Wilson,et al.  A heuristic for multi-level lot-sizing problems with a bottleneck , 1992 .

[26]  Pei-Chann Chang,et al.  A note on due-date assignment and single machine scheduling with a learning/aging effect , 2009 .

[27]  Christoph H. Glock Batch sizing with controllable production rates , 2010 .

[28]  Chikong Huang,et al.  Bottleneck Monitoring and Resource Allocation of Aerospace Sheet Metal Shop , 2011 .

[29]  Christoph H. Glock Learning Effects in Inventory Models with Alternative Shipment Strategies , 2011 .

[30]  Mohamad Y. Jaber,et al.  Countering forgetting through training and deployment , 2003 .

[31]  Maurice Bonney,et al.  Production breaks and the learning curve: The forgetting phenomenon , 1996 .

[32]  Leon F. McGinnis,et al.  A Structured Approach to Simulation Modeling of Manufacturing Systems , 2002 .

[33]  Lin Li,et al.  Bottleneck detection of complex manufacturing systems using a data-driven method , 2009 .

[34]  Huan Neng Chiu,et al.  DETERMINISTIC TIME‐VARYING DEMAND LOT‐SIZING MODELS WITH LEARNING AND FORGETTING IN SETUPS AND PRODUCTION , 2003 .

[35]  S. Goyal,et al.  Economic production quantity model for items with imperfect quality subject to learning effects , 2008 .

[36]  J.-T. Lim,et al.  Homogeneous, asymptotically reliable serial production lines: theory and a case study , 1990 .

[37]  Dirk Biskup,et al.  Single-machine scheduling with learning considerations , 1999, Eur. J. Oper. Res..

[38]  Yuval Cohen,et al.  Absenteeism as a major cause of bottlenecks in assembly lines , 2012 .

[39]  Satya S. Chakravorty,et al.  Learning the Theory of Constraints with a Simulation Game , 1996 .

[40]  Salah E. Elmaghraby,et al.  Economic manufacturing quantities under conditions of learning and forgetting (EMQ/LaF) , 1990 .

[41]  Satya S. Chakravorty,et al.  Bottleneck management: theory and practice , 2006 .