Some issues in the design of EWMA Charts

The traditional design procedure for selecting the parameters of EWMA charts is based on the average run length (ARL). It is shown that for some types of EWMA charts, such a procedure may lead to high probability of a false out-of-control signal. An alternative procedure based on both the ARL and the standard deviation of run length (SRL) is recommended. It is shown that, with the new procedure, the EWMA chart using its exact variance can detect moderate and large shifts of the process mean faster.