A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration
暂无分享,去创建一个
Lamjed Ben Said | Chin-Chia Wu | Shuenn-Ren Cheng | Danyu Bai | Win-Chin Lin | Dwueng-Chwuan Jhwueng | Ameni Azzouz | I.-Hong Chung | Shuenn-Ren Cheng | Chin-Chia Wu | L. B. Said | Dwueng-Chwuan Jhwueng | Win-Chin Lin | Ameni Azzouz | D. Bai | I-Hong Chung
[1] Chung-Yee Lee,et al. Minimizing the makespan in the 3-machine assembly-type flowshop scheduling problem , 1993 .
[2] Ji-Bo Wang,et al. Research on m-machine flow shop scheduling with truncated learning effects , 2019, Int. Trans. Oper. Res..
[3] Mostafa Zandieh,et al. Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop , 2010, Adv. Eng. Softw..
[4] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[5] Ji-Bo Wang,et al. Common due date assignment scheduling for a no-wait flowshop with convex resource allocation and learning effect , 2018, Engineering Optimization.
[6] Louis E. Yelle. THE LEARNING CURVE: HISTORICAL REVIEW AND COMPREHENSIVE SURVEY , 1979 .
[7] Jose M. Framiñan,et al. The 2-stage assembly flowshop scheduling problem with total completion time: Efficient constructive heuristic and metaheuristic , 2017, Comput. Oper. Res..
[8] James C. Bean,et al. Genetic Algorithms and Random Keys for Sequencing and Optimization , 1994, INFORMS J. Comput..
[9] Dehua Xu,et al. Some scheduling problems with general position-dependent and time-dependent learning effects , 2009, Inf. Sci..
[10] MengChu Zhou,et al. Single-Machine Scheduling With Job-Position-Dependent Learning and Time-Dependent Deterioration , 2012, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.
[11] E. Ignall,et al. Application of the Branch and Bound Technique to Some Flow-Shop Scheduling Problems , 1965 .
[12] Christos Koulamas,et al. The three-stage assembly flowshop scheduling problem , 2001, Comput. Oper. Res..
[13] Thomas Stützle,et al. An Iterated Greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives , 2008, Eur. J. Oper. Res..
[14] Dirk Biskup,et al. Single-machine scheduling with learning considerations , 1999, Eur. J. Oper. Res..
[15] Ji-Bo Wang,et al. Group scheduling with deteriorating jobs and allotted resource under limited resource availability constraint , 2019 .
[16] Christos Koulamas,et al. A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines , 2007, Eur. J. Oper. Res..
[17] Chris N. Potts,et al. The Two-Stage Assembly Scheduling Problem: Complexity and Approximation , 1995, Oper. Res..
[18] Chin-Chia Wu,et al. A branch-and-bound algorithm for a single machine sequencing to minimize the total tardiness with arbitrary release dates and position-dependent learning effects , 2014, Inf. Sci..
[19] G. M. Komaki,et al. Minimising makespan in the two-stage assembly hybrid flow shop scheduling problem using artificial immune systems , 2016 .
[20] Chin-Chia Wu,et al. Single-machine common/slack due window assignment problems with linear decreasing processing times , 2017 .
[21] Mohammad Yavari,et al. Integrated decision making for parts ordering and scheduling of jobs on two-stage assembly problem in three level supply chain , 2018 .
[22] Dirk Biskup,et al. A state-of-the-art review on scheduling with learning effects , 2008, Eur. J. Oper. Res..
[23] Victor Fernandez-Viagas,et al. Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures , 2019, Eur. J. Oper. Res..
[24] Dervis Karaboga,et al. AN IDEA BASED ON HONEY BEE SWARM FOR NUMERICAL OPTIMIZATION , 2005 .
[25] Dehua Xu,et al. Single-machine scheduling with a general sum-of-actual-processing-times-based and job-position-based learning effect , 2010 .
[26] Colin R. Reeves,et al. Heuristics for scheduling a single machine subject to unequal job release times , 1995 .
[27] Guanghui Zhang,et al. Memetic social spider optimization algorithm for scheduling two-stage assembly flowshop in a distributed environment , 2018, Comput. Ind. Eng..
[28] Guoqing Wang,et al. Single Machine Scheduling with Learning Effect Considerations , 2000, Ann. Oper. Res..
[29] Alok Singh,et al. Hybrid metaheuristic approaches for the single machine total stepwise tardiness problem with release dates , 2017, Oper. Res..
[30] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[31] Fawaz S. Al-Anzi,et al. A Hybrid Tabu Search Heuristic for the Two-Stage Assembly Scheduling Problem , 2006 .
[32] Ji-Bo Wang,et al. A note on resource allocation scheduling with group technology and learning effects on a single machine , 2017 .
[33] Fawaz S. Al-Anzi,et al. The two-stage assembly scheduling problem to minimize total completion time with setup times , 2009, Comput. Oper. Res..
[34] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[35] Imma Ribas,et al. An iterated greedy algorithm for the flowshop scheduling problem with blocking , 2011 .
[36] Meriem Ennigrou,et al. Scheduling problems under learning effects: classification and cartography , 2018, Int. J. Prod. Res..
[37] C. D. Gelatt,et al. Optimization by Simulated Annealing , 1983, Science.
[38] Ali Tozkapan,et al. A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem , 2003, Comput. Oper. Res..
[39] Chin-Chia Wu,et al. A two-stage three-machine assembly flow shop scheduling with learning consideration to minimize the flowtime by six hybrids of particle swarm optimization , 2018, Swarm Evol. Comput..
[40] F. D. Croce,et al. The two-machine total completion time flow shop problem , 1996 .
[41] Chin-Chia Wu,et al. A two-stage three-machine assembly scheduling problem with a position-based learning effect , 2018, Int. J. Prod. Res..
[42] Paul Higgins,et al. Manufacturing Planning and Control: Beyond MRP II , 1996 .
[43] Yunqiang Yin,et al. The single-machine total weighted tardiness scheduling problem with position-based learning effects , 2012, Comput. Oper. Res..
[44] Chin-Chia Wu,et al. Dominance rule and opposition-based particle swarm optimization for two-stage assembly scheduling with time cumulated learning effect , 2019, Soft Comput..
[45] G. Nadler,et al. MANUFACTURING PROGRESS FUNCTIONS FOR TYPES OF PROCESSES , 1963 .
[46] Keyi Xing,et al. Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times , 2019 .
[47] Chin-Chia Wu,et al. A two-stage three-machine assembly scheduling problem with deterioration effect , 2019, Int. J. Prod. Res..
[48] Dehua Xu,et al. A generalisation model of learning and deteriorating effects on a single-machine scheduling with past-sequence-dependent setup times , 2012, Int. J. Comput. Integr. Manuf..