Case study: Adaptative overcurrent protection scheme applied to an industrial plant with cogeneration units
暂无分享,去创建一个
Although digital protection has been widely employed in power system industry, many protection practices are still the same employed to electromechanical relays. Consequently, the potentialities and benefits of digital relays are not fully explored. In this context, this work presents the advantages of digital protection to coordinate overcurrent relays in an industrial plant with three cogeneration units, resulting in three operating scenarios. It is shown that conventional practices did not result in an efficient solution and an adaptative protection scheme was proposed, which guaranteed overcurrent coordination for all the considered operating scenarios.
[1] T.P. Smith. Power system studies for cement plants , 2006, IEEE Cement Industry Technical Conference, 2006. Conference Record..
[2] T.P. Smith. Performing detailed power system studies for designing and analyzing electrical distribution systems - Power system studies for cement plants , 2007, IEEE Industry Applications Magazine.
[3] A. T. Johns,et al. Digital Protection for Power Systems , 1995 .
[4] A. Y. Abdelaziz,et al. An adaptive protection scheme for optimal coordination of overcurrent relays , 2002 .