A modeling approach to a JIT-based ordering system
暂无分享,去创建一个
[1] Loren Paul Rees,et al. A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanbans , 1990 .
[2] Ramesh Sharda,et al. LP modeling languages for personal computers: A comparison , 1993, Ann. Oper. Res..
[3] Jonathan F. Bard,et al. Determining the number of kanbans in a multiproduct, multistage production system , 1991 .
[4] Loren Paul Rees,et al. A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .
[5] Kazuyoshi Ishii,et al. Some ways to increase flexibility in manufacturing systems , 1985 .
[6] Harvey J. Greenberg,et al. A comparison of mathematical programming modeling systems , 1992, Ann. Oper. Res..
[7] Gary S. Wasserman,et al. Basic concepts of JIT modelling , 1992 .
[8] Osamu Kimura,et al. Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .
[9] Shusaku Hiraki,et al. A mathematical programming model for a pull type ordering system including lot production processes , 1995 .
[10] Gabriel R. Bitran,et al. A mathematical programming approach to a deterministic Kanban system , 1987 .
[11] Tadaaki Fukukawa,et al. The determination of the optimal number of kanbans in a Just-In-Time production system , 1993 .
[12] Richard J. Schonberger. Applications of Single-Card and Dual-Card Kanban , 1983 .
[13] John B. Kidd,et al. Toyota Production System , 1993 .