A modeling approach to a JIT-based ordering system

In this paper, we consider a multi-stage multi-product production, inventory and transpor-tation system and develop a mathematical model for a pull type ordering system based on the concept of a Just-In-Time (JIT) production system. Our model considers a manufacturing system in which the setup action is improved and can deal with the number of setups required. We also propose two approximate solution procedures to rapidly obtain a suboptimal solution of the formulated integer programming problem using a mathematical programming modeling language. The approximate procedures are realized utilizing post-optimal analysis which can be performed by the modeling language. Finally, we show a numerical example of the model applied to an actual manufacturing system of an automo-bile parts manufacturer in order to verify the effectiveness of the approximate procedures and to clarify the applicability of our modeling approach.

[1]  Loren Paul Rees,et al.  A mathematical programming approach for determining workcentre lotsizes in a just-in-time system with signal Kanbans , 1990 .

[2]  Ramesh Sharda,et al.  LP modeling languages for personal computers: A comparison , 1993, Ann. Oper. Res..

[3]  Jonathan F. Bard,et al.  Determining the number of kanbans in a multiproduct, multistage production system , 1991 .

[4]  Loren Paul Rees,et al.  A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEM , 1983 .

[5]  Kazuyoshi Ishii,et al.  Some ways to increase flexibility in manufacturing systems , 1985 .

[6]  Harvey J. Greenberg,et al.  A comparison of mathematical programming modeling systems , 1992, Ann. Oper. Res..

[7]  Gary S. Wasserman,et al.  Basic concepts of JIT modelling , 1992 .

[8]  Osamu Kimura,et al.  Desiǵn and analysis of Pull System, a method of multi-staǵe production control , 1981 .

[9]  Shusaku Hiraki,et al.  A mathematical programming model for a pull type ordering system including lot production processes , 1995 .

[10]  Gabriel R. Bitran,et al.  A mathematical programming approach to a deterministic Kanban system , 1987 .

[11]  Tadaaki Fukukawa,et al.  The determination of the optimal number of kanbans in a Just-In-Time production system , 1993 .

[12]  Richard J. Schonberger Applications of Single-Card and Dual-Card Kanban , 1983 .

[13]  John B. Kidd,et al.  Toyota Production System , 1993 .