Based on the mining practice in an extremely close coal seam, theoretical analysis was conducted on the vertical stress distribution of the floor strata under a large coal pillar. The vertical stress distribution regulation of a No. 5 coal seam was revealed. To obtain the optimum position of the roadway that bears the supporting pressure of a large coal pillar, numerical modeling was applied to analyze the relation among the stress distribution of the roadway surrounding the rock that bears the supporting pressure of a large coal pillar, the plastic zone distribution of the roadway surrounding the rock, the surrounding rock deformation, and the roadway layout position. The theoretical calculation results of the stress value, stress variation rate, and influencing range of the stress influencing angle showed that the reasonable malposition of the No. 5 coal seam roadway was an inner malposition of 4 m. The mining practice showed the following: the layout of No. 25301 panel belt roadway at the position of the inner malposition of 4 m was reasonable, the roadway support performance was favourable without deformation, and ground pressure was not obvious. The research achievement of this study is the provision of a reference for roadway layouts under similar conditions.
[1]
H. Yavuz,et al.
An estimation method for cover pressure re-establishment distance and pressure distribution in the goaf of longwall coal mines
,
2004
.
[2]
John P. Carter,et al.
Vertical stress changes in multi-seam mining under supercritical longwall panels
,
2013
.
[3]
Heping Xie,et al.
Three-dimensional numerical analysis of deformation and failure during top coal caving
,
1999
.
[4]
严红,et al.
Layout and support design of a coal roadway in ultra-close multiple-seams
,
2015
.
[6]
Wei Shi,et al.
Research on Mine Pressure Behave Law in Mining of Face under the Coal Pillar
,
2011
.
[7]
A. Wilson,et al.
The stability of underground workings in the soft rocks of the Coal Measures
,
1983
.
[8]
Lu Zhiqiang,et al.
INSTABILITY MECHANISM AND PREVENTION OF ROADWAY UNDER CLOSE-DISTANCE SEAM GROUP MINING
,
2009
.
[9]
Baiquan Lin,et al.
Stress evolution with time and space during mining of a coal seam
,
2011
.
[10]
S. S. Peng,et al.
Design guidelines for multiple-seam mining, Part II
,