Constructing time-scaled maps
暂无分享,去创建一个
The paper discusses the construction of a time-scal ed maps series for Switzerland documenting the shrinking of the country since 1950. It describ es underlying network models and themathematical approach employed for the necessary re scaling.In conclusion, it presents the maps and discusses them.
[1] David Alan Aschauer,et al. IS PUBLIC EXPENDITURE PRODUCTIVE , 1989 .
[2] Jean-Claude Muller. THE MAPPING OF TRAVEL TIME IN EDMONTON, ALBERTA , 1978 .
[3] Douglas Holtz-Eakin,et al. Public-Sector Capital and the Productivity Puzzle , 1992 .
[4] K. Axhausen,et al. Accessibility and Spatial Development in Switzerland During the Last 50 Years , 2005 .
[5] Milenko Vrtic. Simultaneous route and mode choice model , 2005 .