Solutions for deploying PV systems in New York City's secondary network system
暂无分享,去创建一个
New York City has set a goal to increase its installed photovoltaic (PV) capacity from 1.1 MW in 2005 to 8.1 MW by 2015. A key barrier to reaching this goal, however, is the complexity of the interconnection process on secondary network distribution systems (network).