Joint optimization of a flow-shop group scheduling with sequence dependent set-up times and skilled workforce assignment
暂无分享,去创建一个
Antonio Costa | Sergio Fichera | Fulvio Antonio Cappadonna | Antonio Costa | S. Fichera | F. Cappadonna
[1] G. Celano,et al. A new efficient encoding/decoding procedure for the design of a supply chain network with genetic algorithms , 2010, Comput. Ind. Eng..
[2] Rasaratnam Logendran,et al. Total flow time minimization in a flowshop sequence-dependent group scheduling problem , 2010, Comput. Oper. Res..
[3] Jatinder N. D. Gupta,et al. A REVIEW OF FLOWSHOP SCHEDULING RESEARCH WITH SETUP TIMES , 2000 .
[4] Xiaochun Jiang,et al. Taxonomy for integrating scheduling theory and human factors: Review and research opportunities , 2009 .
[5] Nasser Salmasi,et al. Permutation flowshops in group scheduling with sequence-dependent setup times , 2012 .
[6] Ronald G. Askin,et al. Forming effective worker teams with multi-functional skill requirements , 2005, Comput. Ind. Eng..
[7] R. Logendran,et al. Makespan minimization of a flowshop sequence-dependent group scheduling problem , 2011 .
[8] Wen-Chyuan Chiang,et al. Applications of computational intelligence for design and operations decisions in manufacturing , 2012 .
[9] Gürsel A. Süer,et al. Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells , 2008 .
[10] Jatinder N. D. Gupta,et al. Scheduling a flowline manufacturing cell with sequence dependent family setup times , 2000, Eur. J. Oper. Res..
[11] Rasaratnam Logendran,et al. Group-scheduling problems in electronics manufacturing , 2010, J. Sched..
[12] Pablo Moscato,et al. Evolutionary algorithms for scheduling a flowshop manufacturing cell with sequence dependent family setups , 2005, Comput. Ind. Eng..
[13] Bopaya Bidanda,et al. Worker assignment in cellular manufacturing considering technical and human skills , 2002 .
[14] Antonio Costa,et al. Scheduling of unrelated parallel manufacturing cells with limited human resources , 2008 .
[15] J. Hunter. Cognitive ability, cognitive aptitudes, job knowledge, and job performance , 1986 .
[16] Nasser Salmasi,et al. A heuristic approach for multi-stage sequence-dependent group scheduling problems , 2007 .
[17] Mozafar Saadat,et al. Challenges and trends in the allocation of the workforce in manufacturing shop floors , 2013 .
[18] Antonio Costa,et al. Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times , 2010 .
[19] Rasaratnam Logendran,et al. Minimizing the mean flow time in a two-machine group-scheduling problem with carryover sequence dependency , 2003 .
[20] Nasser Salmasi,et al. A fast hybrid particle swarm optimization algorithm for flow shop sequence dependent group scheduling problem , 2011 .
[21] Ching-Jong Liao,et al. A case study in a two-stage hybrid flow shop with setup time and dedicated machines , 2003 .
[22] Kimberly P. Ellis,et al. Development and application of a worker assignment model to evaluate a lean manufacturing cell , 2009 .
[23] Julia Rieck,et al. Integrated production and staff planning for heterogeneous, parallel assembly lines: an application in the automotive industry , 2014 .
[24] Thomas R. Rohleder,et al. Incorporating human resources in group technology/cellular manufacturing , 1998 .
[25] Ronald G. Askin,et al. Forming effective worker teams for cellular manufacturing , 2001 .
[26] Jatinder N. D. Gupta,et al. A review of scheduling research involving setup considerations , 1999 .
[27] Margaret J. Robertson,et al. Design and Analysis of Experiments , 2006, Handbook of statistics.
[28] M. Sacramento Quintanilla,et al. Skilled workforce scheduling in Service Centres , 2009, Eur. J. Oper. Res..
[29] Wilbert E. Wilhelm,et al. Scheduling and lot sizing with sequence-dependent setup: A literature review , 2006 .
[30] Albert Corominas,et al. A model for the assignment of a set of tasks when work performance depends on experience of all tasks involved , 2010 .
[31] Ronald G. Askin. Contributions to the design and analysis of cellular manufacturing systems , 2013 .
[32] Laurent Perron. Planning and scheduling teams of skilled workers , 2010, J. Intell. Manuf..