A dynamic part-feeding system for an automotive assembly line
暂无分享,去创建一个
[1] Bernard W. Taylor,et al. A COMPARATIVE ANALYSIS OF SEQUENCING PROCEDURES FOR MIXED-MODEL ASSEMBLY LINES IN A JUST-IN-TIME PRODUCTION SYSTEM , 1992 .
[2] Candace Arai Yano,et al. Sequencing to minimize work overload in assembly lines with product options , 1991 .
[3] Dennis E. Blumenfeld,et al. In-plant material buffer sizes for pull system and level-material-shipping environments in the automotive industry , 1997 .
[4] R. R. Inman,et al. Sequencing JIT mixed-model assembly lines , 1991 .
[5] John B. Kidd,et al. Toyota Production System , 1993 .
[6] Edward R. Clayton,et al. Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication , 1996 .
[7] Robert A. Russell,et al. Hybrid Heuristics for the Vehicle Routing Problem with Time Windows , 1995, Transp. Sci..
[8] Kenjiro Okamura,et al. A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor , 1979 .
[9] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[10] Robert T. Sumichrast,et al. Evaluating mixed-model assembly line sequencing heuristics for just-in-time production systems , 1990 .
[11] Jean-Yves Potvin,et al. A parallel route building algorithm for the vehicle routing and scheduling problem with time windows , 1993 .
[12] Thomas L. Magnanti,et al. Combinatorial optimization and vehicle fleet planning: Perspectives and prospects , 1981, Networks.
[13] Jacques Desrosiers,et al. Survey Paper - Time Window Constrained Routing and Scheduling Problems , 1988, Transp. Sci..