MANUFACTURING PROGRESS FUNCTIONS II. SELECTION OF TRAINEES AND CONTROL OF THEIR PROGRESS
暂无分享,去创建一个
[1] Werner Z. Hirsch,et al. Manufacturing Progress Functions , 1952 .
[2] J. H. Glover,et al. MANUFACTURING PROGRESS FUNCTIONS I. AN ALTERNATIVE MODEL AND ITS COMPARISON WITH EXISTING FUNCTIONS , 1965 .
[3] E. R. Crossman. A THEORY OF THE ACQUISITION OF SPEED-SKILL∗ , 1959 .
[4] E. Asmussen,et al. Determination of maximum working capacity at different ages in work with the legs or with the arms. , 1958, Scandinavian journal of clinical and laboratory investigation.
[5] D. W. Taylor. Learning telegraphic code. , 1943 .
[6] B. Bink,et al. THE PHYSICAL WORKING CAPACITY IN RELATION TO WORKING TIME AND AGE , 1962 .
[7] H. Scholz,et al. Changing Physical Demands of Foundry Workers in the Production of Medium Weight Castings. , 1957 .
[8] E. Hohwü Christensen,et al. SPEED OF WORK , 1962 .
[9] William McGehee,et al. Cutting Training Waste , 1948 .
[10] Thomas A. Ryan,et al. Principles of Industrial Psychology. , 1955 .
[11] A. B. Blankenship,et al. Prediction of vocational proficiency in three machine operations. , 1938 .
[12] E. A. Müller,et al. OCCUPATIONAL WORK CAPACITY , 1962 .
[13] H. J. Furness. The Cost of Labour Turnover , 1952 .