Comparative Study of University Courses on Critical-Path Method Scheduling

There is a growing need for project controls on today’s construction projects. Delivering a project on time does not mean just signing a contract and hoping that the required contract completion date will be met. More often than not, the majority of today’s constructed projects encounter events and/or changes that affect the original plan of executing a project. A key to monitoring a project’s progress is a critical-path method (CPM) schedule. However, the methods and techniques of CPM scheduling vary widely on any construction site. In light of this difference, a growing need has emerged for standards for CPM scheduling, a common foundation from which terms, definitions, and applications can be universally understood. In determining what recommendations might be reasonable in establishing scheduling standards, one area to be examined is how CPM scheduling is being taught in the universities. In this examination, the writer conducted a survey of university CPM curriculums in the United States, Europe, and...

[1]  Immanuel Goldsmith,et al.  Canadian building contracts , 1969 .

[2]  J J O'Brien CPM IN CONSTRUCTION MANAGEMENT. FOURTH EDITION , 1993 .

[3]  Thomas A. Love Scheduling Residential Construction for Builders and Remodelers , 1995 .

[4]  Jack R. Meredith Project Management in Practice , 2001 .

[5]  Jon M. Wickwire,et al.  Construction Scheduling: Preparation, Liability, and Claims , 1991 .

[6]  Miklós Hajdu Network Scheduling Techniques for Construction Project Management , 1996 .

[7]  Karl A. Smith Project management and teamwork , 2000 .

[8]  Henry F. W. Naylor Construction Project Management: Planning and Scheduling , 1995 .

[9]  Garold D. Oberlender Project Management for Engineering and Construction , 1993 .

[10]  J. D. Wiest,et al.  Management Guide to PERT/CPM , 1969 .

[11]  Jonathan F. Hutchings,et al.  CPM construction scheduler's manual , 1996 .

[12]  Clifford J. Schexnayder,et al.  Construction Management Fundamentals , 2003 .

[13]  James Lewis Fundamentals of project management: developing core competencies to help outperform the competition , 2001 .

[14]  Boyd C. Paulson,et al.  Professional Construction Management , 1978 .

[15]  James D. Stevens Techniques for Construction Network Scheduling , 1989 .

[16]  M. Spinner Project Management: Principles and Practices , 1996 .

[17]  H. N. Ahuja,et al.  Project management : techniques in planning and controlling construction projects / Hira N. Ahuja, S.P. Dozzi, S.M. Aourizk , 1994 .

[18]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[19]  Adedeji Badiru,et al.  Comprehensive Project Management: Integrating Optimization Models, Management Principles, and Computers , 1994 .

[20]  Stephen A. Devaux,et al.  Total Project Control: A Manager's Guide to Integrated Project Planning, Measuring, and Tracking , 1999 .

[21]  Quentin W. Fleming,et al.  Earned Value Project Management , 1996 .

[22]  Sidney M. Levy Project Management in Construction , 1987 .

[23]  David W. Johnston LINEAR SCHEDULING METHOD FOR HIGHWAY CONSTRUCTION , 1981 .

[24]  Joseph J. Moder,et al.  Project Management With Cpm, Pert and Precedence Diagramming , 1983 .

[25]  Michael T. Callahan,et al.  Construction Project Scheduling , 1991 .

[26]  James M. Antill,et al.  Critical path methods in construction practice , 1970 .

[27]  Jimmie Hinze,et al.  Construction Planning and Scheduling , 1997 .

[28]  Ken Lynch,et al.  Project Management Institute (PMI) , 2004 .

[29]  Calin Popescu,et al.  Project Planning, Scheduling, and Control in Construction: An Encyclopedia of Terms and Applications , 1995 .