Developing an appropriate mathematical model for the environmental risk assessment of jack-up drilling rigs (case study: South Pars field, Iran)

AbstractI dentifying the environmental hazards of jack-up drilling rig, which is used as an exploratory drilling and offshore service platform, yet has been under intense discussion. Risk assessment along with determining the likelihood of an event occurrence and the severity of its consequences can be a useful tool for identifying the priorities and making satisfactory managerial decisions. In this study, the environmental risks attributed to jack-ups in the offshore area of Iran around the South Pars gas field were studied, and finally a new mathematical model for the environmental risk assessment in this area was presented. Due to qualitative nature of some indefinite factors, fuzzy logic was applied in this model. Moreover, the model design was tailored to the ecological and environmental conditions of South Pars gas field, and several sources of risk were aggregated for the final environmental risk assessment of jack-up drilling rig. The results indicated that the total risk calculated for jack-up in transportation was tolerable and limited management measures were required. However, for the jack-up operation risks, the site was found to be faced with “unacceptable risk” or requiring extensive management measures.

[1]  Marina Bosch,et al.  Fuzzy Multiple Attribute Decision Making Methods And Applications , 2016 .

[2]  C. C. Karman,et al.  Dynamic assessment of the ecological risk of the discharge of produced water from oil and gas producing platforms , 1998 .

[3]  J. M. Marquenie,et al.  Impact assessment on exploration drilling in the Wadden Sea, the Netherlands , 1998 .

[4]  . A.Azadeh,et al.  A Total Ergonomic Design Approach to Enhance the Productivity in a Complicated Control System , 2007 .

[5]  Hongyan Li,et al.  A FTA-based method for risk decision-making in emergency response , 2011, 2011 Fourth International Joint Conference on Computational Sciences and Optimization.

[6]  Wenbi Jiang,et al.  Quantitative Identification and Analysis on Hazard Sources of Roof Fall Accident in Coal Mine , 2012 .

[7]  Rupert J. Hunt,et al.  Opportunities to improve the operational and technical management of jack-up deployments , 2004 .

[8]  Jian Kang,et al.  A new risk evaluation method for oil storage tank zones based on the theory of two types of hazards , 2014 .

[9]  Mohammad Ataei,et al.  Fault tree analysis of failure cause of crushing plant and mixing bed hall at Khoy cement factory in Iran☆ , 2014, Case studies in engineering failure analysis.

[10]  Ching-Lai Hwang,et al.  Fuzzy Multiple Attribute Decision Making - Methods and Applications , 1992, Lecture Notes in Economics and Mathematical Systems.

[11]  Seyed Ali Jozi,et al.  Environmental Risk Assessment of a Gas Power Plant Exploitation Unit Using Integrated TOP-EFMEA Method , 2012 .

[12]  Farhad Hosseinzadeh Lotfi,et al.  Developing an expert system and fuzzy-based model for the oil spill environmental risk assessment , 2010 .

[13]  Charles P. Ellinas,et al.  Collision damage of jack-ups , 1989 .