An integrated vendor–buyer cooperative model under stochastic supply lead-time

This paper presents a single-vendor, single-buyer integrated inventory model. We relax the assumption of deterministic lead-time in the hitherto existing joint economic lot sizing (JELS) models and analyze the problem where the buyer lead-time is a stochastic variable. Moreover, we consider the situation in which shortage is allowed. The vendor produces the product in batches and periodically delivers final goods at a fixed lot size to the customer, who has a constant demand rate. The proposed model, based on the integrated expected total relevant costs of both buyer and vendor finds out optimal values of reorder point, order quantity, and number of shipments, using a solution procedure. Numerical examples are also used to analyze the savings in joint total cost over individually derived policies.

[1]  S. Goyal “A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* , 1988 .

[2]  Suresh Kumar Goyal,et al.  An integrated inventory model for a single supplier-single customer problem , 1977 .

[3]  Arthur F. Veinott,et al.  Analysis of Inventory Systems , 1963 .

[4]  Yong-Wu Zhou,et al.  Optimal production and shipment models for a single-vendor-single-buyer integrated system , 2007, Eur. J. Oper. Res..

[5]  M. Darwish,et al.  Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost , 2007, Eur. J. Oper. Res..

[6]  M. Darwish,et al.  The joint economic lot sizing problem: Review and extensions , 2008, Eur. J. Oper. Res..

[7]  Raafat N Ibrahim,et al.  A single-vendor multiple-buyer inventory model with a multiple-shipment policy , 2006 .

[8]  Suresh Kumar Goyal,et al.  A one-vendor multi-buyer integrated inventory model: A comment , 1995 .

[9]  M. Javad Paknejad,et al.  Quality improvement and setup reduction in the joint economic lot size model , 2002, Eur. J. Oper. Res..

[10]  Taebok Kim,et al.  Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system , 2006 .

[11]  Liang-Yuh Ouyang,et al.  Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction , 2006, Eur. J. Oper. Res..

[12]  J. M. Hsiao,et al.  A buyer-vendor EOQ model with changeable lead-time in supply chain , 2005 .

[13]  R. Hill The single-vendor single-buyer integrated production-inventory model with a generalised policy , 1997 .

[14]  Roger M. Hill,et al.  The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .

[15]  A. Banerjee A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR , 1986 .

[16]  Suresh Kumar Goyal,et al.  A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer , 2006 .