Hierarchical real-time scheduling of a semiconductor fabrication facility
暂无分享,去创建一个
[1] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[2] Stanley B. Gershwin,et al. Performance of hierarchical production scheduling policy , 1984 .
[3] Stanley B. Gershwin,et al. Short term production scheduling of an automated manufacturing facility , 1984, The 23rd IEEE Conference on Decision and Control.
[4] Stanley B. Gershwin,et al. Simulation experience with a hierarchical scheduling policy for a simple manufacturing system , 1988, Proceedings of the 27th IEEE Conference on Decision and Control.
[5] Michael L. Heytens,et al. GESTALT: an expressive database programming system , 1989, SGMD.
[6] Stanley B. Gershwin,et al. A Manufacturing Scheduler's Perspective on Semiconductor Fabrication , 1989 .
[7] Stanley B. Gershwin,et al. Hierarchical flow control: a framework for scheduling and planning discrete events in manufacturing systems , 1989, Proc. IEEE.
[8] Duane S. Boning,et al. CAFE-the MIT computer aided fabrication environment , 1990 .
[9] Stanley B. Gershwin,et al. Scheduling manufacturing systems with work-in-process inventory , 1990, 29th IEEE Conference on Decision and Control.
[10] Stanley B. Gershwin,et al. Selection of setup times in a hierarchically controlled manufacturing system , 1990, 29th IEEE Conference on Decision and Control.