Harmonogramowanie przedsięwzięć budowlanych z zastosowaniem hybrydowego algorytmu ewolucyjnego
暂无分享,去创建一个
[1] Y Cengiz Toklu. Application of genetic algorithms to construction scheduling with or without resource constraints , 2002 .
[2] Wojciech Bozejko,et al. A hybrid evolutionary algorithm for some discrete optimization problems , 2005, 5th International Conference on Intelligent Systems Design and Applications (ISDA'05).
[3] Sou-Sen Leu,et al. RESOURCE LEVELING IN CONSTRUCTION BY GENETIC ALGORITHM-BASED OPTIMIZATION AND ITS DECISION SUPPORT SYSTEM APPLICATION , 2000 .
[4] Khaled Nassar,et al. Evolutionary Optimization of Resource Allocation in Repetitive Construction Schedules , 2005, J. Inf. Technol. Constr..
[5] T. Yamada,et al. Solving the C/sub sum/ permutation flowshop scheduling problem by genetic local search , 1998, 1998 IEEE International Conference on Evolutionary Computation Proceedings. IEEE World Congress on Computational Intelligence (Cat. No.98TH8360).
[6] Pierre Borne,et al. EVOLUTIONARY ALGORITHMS FOR JOB-SHOP SCHEDULING , 2004 .