Team 5: Risk Assessment for Readiness and Life Cycle Cost for Major Weapon Systems, Scythe, Proceedings of International Data Farming Workshop 23

Kang, K., Lawton, C., Lalle, S., Nissinen, N., and Morad, F. (2011), Team 5: Risk Assessment for Readiness and Life Cycle Cost for Major Weapon Systems, Scythe, Proceedings of International Data Farming Workshop 23, pp. 17-20.

[1]  Susan M. Sanchez,et al.  Work smarter, not harder: guidelines for designing simulation experiments , 2005, Proceedings of the Winter Simulation Conference, 2005..

[2]  Thomas W. Lucas,et al.  Efficient Nearly Orthogonal and Space-Filling Latin Hypercubes , 2007, Technometrics.

[3]  E. L. Harder,et al.  The Institute of Electrical and Electronics Engineers, Inc. , 2019, 2019 IEEE International Conference on Software Architecture Companion (ICSA-C).