On-line loading and dispatching in flexible manufacturing systems
暂无分享,去创建一个
[1] Moshe M. Barash,et al. Operational control of item flow in versatile manufacturing systems , 1979 .
[2] Zoe Doulgeri,et al. The Scheduling of Flexible Manufacturing Systems , 1987 .
[3] Kenneth R. Baker,et al. Improved decision rules in a combined system for minimizing job tardiness , 1984 .
[4] Hiroshi Awane,et al. Input scheduling and load balance control for a job shop , 1984 .
[5] Peter O'Grady,et al. Loading a flexible manufacturing system , 1987 .
[6] Spencer B. Smith,et al. A Multifactor Priority Rule for Jobshop Scheduling Using Computer Search , 1985 .
[7] M. Garetti,et al. Development of Production Planning Systems for Flexible Manufacturing and Assembly Systems , 1987 .
[8] Thomas R. Hoffmann,et al. Composite cost-based rules for priority scheduling in a randomly routed job shop , 1985 .
[9] Stanley B. Gershwin,et al. An algorithm for the computer control of a flexible manufacturing system , 1983 .
[10] Claude Dennis Pegden. Introduction to SIMAN , 1988, WSC '88.
[11] Kripa Shanker,et al. A loading and dispatching problem in a random flexible manufacturing system , 1985 .
[12] Kathryn E. Stecke,et al. Loading and control policies for a flexible manufacturing system , 1981 .
[13] David R. Denzler,et al. Experimental investigation of flexible manufacturing system scheduling decision rules , 1987 .
[14] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .