Quantifying operational time variability: the missing parameter for cycle time reduction
暂无分享,去创建一个
[1] Lennart Ljung. Modelling of Industrial Systems , 1993, ISMIS.
[2] L. Sattler. Using queueing curve approximations in a fab to determine productivity improvements , 1996, IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings.
[3] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[4] R. G. Petrakian,et al. Trade-offs in cycle time management: hot lots , 1992 .