Using fuzzy analytical hierarchy process to evaluate main dimensions of business process reengineering
暂无分享,去创建一个
Ali Asghar | Meysam Shaverdi | Behnam Amiri | Anvary Rostamy | Farideh Bakhshi Takanlou | A. Asghar | M. Shaverdi | A. Rostamy | Behnam Amiri
[1] Gwo-Hshiung Tzeng,et al. Fuzzy MCDM approach for planning and design tenders selection in public office buildings , 2004 .
[2] J. Buckley,et al. Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).
[3] Chee-Sing Yap,et al. Business Process Reengineering in the Public Sector: The Case of the Housing Development Board in Singapore , 2000, J. Manag. Inf. Syst..
[4] Mario Enea,et al. Project Selection by Constrained Fuzzy AHP , 2004, Fuzzy Optim. Decis. Mak..
[5] Malcolm James Beynon,et al. Application and Development of a Fuzzy Analytic Hierarchy Process within a Capital Investment Study , 2005 .
[6] 權光鉉. 정보기술을 활용한 Business Reengineering의 전략적 효과 , 1995 .
[7] Minghe Sun,et al. Artificial neural network representations for hierarchical preference structures , 1996, Comput. Oper. Res..
[8] Sanjay Goel,et al. Integrating the global enterprise using Six Sigma: Business process reengineering at General Electric Wind Energy , 2008 .
[9] Mao-Jiun J. Wang,et al. Personnel selection using fuzzy MCDM algorithm , 1994 .
[10] H. Basligil. THE FUZZY ANALYTIC HIERARCHY PROCESS FOR SOFTWARE SELECTION PROBLEMS , 2005 .
[11] L. C. Leung,et al. On consistency and ranking of alternatives in fuzzy AHP , 2000, Eur. J. Oper. Res..
[12] Jun Wu,et al. Selection of optimum maintenance strategies based on a fuzzy analytic hierarchy process , 2007 .
[13] R. Yager. On a general class of fuzzy connectives , 1980 .
[14] Sheng-Hshiung Tsaur,et al. The evaluation of airline service quality by fuzzy MCDM. , 2002 .
[15] Cengiz Kahraman,et al. Project risk evaluation using a fuzzy analytic hierarchy process: An application to information technology projects , 2006, Int. J. Intell. Syst..
[16] Da Ruan,et al. Fuzzy group decision making for selection among computer integrated manufacturing systems , 2003, Comput. Ind..
[17] J. Adamo. Fuzzy decision trees , 1980 .
[18] M. R. Abdi,et al. Fuzzy multi-criteria decision model for evaluating reconfigurable machines , 2009 .
[19] Qunxiong Zhu,et al. Fuzzy multi-attribute decision-making method based on eigenvector of fuzzy attribute evaluation space , 2006, Decis. Support Syst..
[20] Yu-Hern Chang,et al. PERFORMANCE EVALUATION OF INTERNATIONAL AIRPORTS IN THE REGION OF EAST ASIA , 2003 .
[21] C. Kahraman,et al. Multi‐criteria supplier selection using fuzzy AHP , 2003 .
[22] W. Pedrycz,et al. A fuzzy extension of Saaty's priority theory , 1983 .
[23] Hepu Deng. Multicriteria analysis with fuzzy pairwise comparison , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).
[24] Ching-Hsue Cheng. Evaluating naval tactical missile systems by fuzzy AHP based on the grade value of membership function , 1997 .
[25] Ludmil Mikhailov,et al. Evaluation of services using a fuzzy analytic hierarchy process , 2004, Appl. Soft Comput..
[26] Wen-Chin Chen,et al. A fuzzy AHP and BSC approach for evaluating performance of IT department in the manufacturing industry in Taiwan , 2008, Expert Syst. Appl..
[27] George J. Klir,et al. Fuzzy sets and fuzzy logic - theory and applications , 1995 .
[28] Thomas H. Davenport,et al. The New Industrial Engineering: Information Technology and Business Process Redesign , 2011 .
[29] D. Chang. Applications of the extent analysis method on fuzzy AHP , 1996 .
[30] Michael Hammer,et al. Reengineering Work: Don’t Automate, Obliterate , 1990 .
[31] Yu-Cheng Tang,et al. An approach to budget allocation for an aerospace company - Fuzzy analytic hierarchy process and artificial neural network , 2009, Neurocomputing.
[32] T. Saaty,et al. The Analytic Hierarchy Process , 1985 .
[33] Don-lin Mon,et al. Evaluating weapon system by Analytical Hierarchy Process based on fuzzy scales , 1994 .
[34] Ching-Hsue Cheng,et al. Evaluating weapon systems using ranking fuzzy numbers , 1999, Fuzzy Sets Syst..
[35] C. Beugré. Implementing Business Process Reengineering , 1998 .
[36] E. Lee,et al. Comparison of fuzzy numbers based on the probability measure of fuzzy events , 1988 .
[37] Victor B. Kreng,et al. The application of Fuzzy Delphi Method and Fuzzy AHP in lubricant regenerative technology selection , 2010, Expert Syst. Appl..
[38] Wolfgang Hauke,et al. Fuzzy Multiple Objective Decision Making (Fuzzy-MODM) , 1998 .
[39] R. Talwar. Business re-engineering—a strategy-driven approach , 1993 .
[40] Cengiz Kahraman,et al. Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey , 2004 .
[41] G. Liang,et al. Application of a fuzzy multi-criteria decision-making model for shipping company performance evaluation , 2001 .
[42] Reza Zanjirani Farahani,et al. Fuzzy AHP to determine the relative weights of evaluation criteria and Fuzzy TOPSIS to rank the alternatives , 2010, Appl. Soft Comput..
[43] Guohua Shi,et al. Developing a fuzzy analytic hierarchical process model for building energy conservation assessment , 2010 .
[44] Yu Jing,et al. A discussion on Extent Analysis Method and applications of fuzzy AHP , 1999, Eur. J. Oper. Res..
[45] Da Ruan,et al. Fuzzy group decision-making for facility location selection , 2003, Inf. Sci..
[46] Irfan Ertugrul,et al. Performance evaluation of Turkish cement firms with fuzzy analytic hierarchy process and TOPSIS methods , 2009, Expert Syst. Appl..
[47] Amy Hsin-I Lee,et al. Analysis of priority mix planning for semiconductor fabrication under uncertainty , 2006 .
[48] Chian-Son Yu,et al. A GP-AHP method for solving group decision-making fuzzy AHP problems , 2002, Comput. Oper. Res..