A simulation analysis of the effectiveness of drum-buffer-rope scheduling in furniture manufacturing
暂无分享,去创建一个
Abstract Simulation has proven to be an important computer tool in analyziing new manufacturing approaches. In this paper we use simulation models to compare a new approach to manufacturing with current practices. The new approach is referred to as the Drum-Buffer-Rope (DBR) method of synchronous manufacturing. We discuss the DBR approach and demonstrate the application of DBR in a furniture manufacturing case example. Simulation models are used to compare the DBR approach with the typical system of production control referred to as a cutting approach. The simulation analysis indicates considerable savings in makespan are possible when DBR is used in place of the cutting approach.
[1] Randall P. Sadowski,et al. Introduction to Simulation Using Siman , 1990 .
[2] William L. Berry,et al. Manufacturing Planning and Control Systems , 1984 .
[3] F. Robert Jacobs,et al. REPETITIVE LOTS: FLOW-TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZING , 1988 .
[4] John S. Morris,et al. A simulation analysis of factors influencing the attractiveness of group technology cellular layouts , 1990 .