ANN-based prediction intervals to forecast labour productivity

This study aims to propose the adoption of artificial neural network (ANN)-based prediction intervals (PIs) to give more reliable prediction of labour productivity using historical data.,Using the proposed PI method, various sources of uncertainty affecting predictions can be accounted for, and a PI is proposed instead of a less reliable single-point estimate. The proposed PI consists of a lower and upper bound in which the realization of the predicted variable, namely, labour productivity, is anticipated to fall with a defined probability and represented in terms of a confidence level (CL).,The proposed PI method is implemented on a case study project to predict labour productivity. The quality of the generated PIs for the labour productivity is investigated at three confidence levels. The results show that the proposed method can predict the value of labour productivity efficiently.,This study is the first attempt in construction management to undertake a shift from deterministic point predictions to interval forecasts to improve the reliability of predictions. The proposed PI method will help project managers obtain accurate and credible predictions of labour productivity using historical data. With a better understanding of future outcomes, project managers can adopt appropriate improvement strategies to enhance labour productivity before commencing a project.,Point predictions provided by traditional deterministic ANN-based forecasting methodologies may be unreliable due to the different sources of uncertainty affecting predictions. The current study proposes ANN-based PIs as an alternative and robust tool to give a more reliable prediction of labour productivity using historical data. Using the proposed method, various sources of uncertainty affecting the predictions are accounted for, and a PI is proposed instead of a less reliable single point estimate.

[1]  Shouping Guan,et al.  Modeling Uncertain Dynamic Plants With Interval Neural Networks by Bounded-Error Data , 2020, IEEE Access.

[2]  H. Randolph Thomas,et al.  SCHEDULED OVERTIME AND LABOR PRODUCTIVITY: QUANTITATIVE ANALYSIS , 1997 .

[3]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[4]  Shamil Naoum,et al.  Factors influencing labor productivity on construction sites , 2016 .

[5]  Kit Po Wong,et al.  Optimal Prediction Intervals of Wind Power Generation , 2014, IEEE Transactions on Power Systems.

[6]  Awad S. Hanna,et al.  Quantifying the Impact of Schedule Compression on Labor Productivity for Mechanical and Sheet Metal Contractor , 2007 .

[7]  Farnad Nasirzadeh,et al.  Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach , 2018 .

[8]  Lingguang Song,et al.  Measuring and Modeling Labor Productivity Using Historical Data , 2008 .

[9]  Amir F. Atiya,et al.  Comprehensive Review of Neural Network-Based Prediction Intervals and New Advances , 2011, IEEE Transactions on Neural Networks.

[10]  Nang-Fei Pan,et al.  Assessment of productivity and duration of highway construction activities subject to impact of rain , 2005, Expert Syst. Appl..

[11]  Mohammed A. Salem Hiyassat,et al.  Factors affecting construction labour productivity: a case study of Jordan , 2016 .

[12]  Abbas Afshar,et al.  Similarity-based error prediction approach for real-time inflow forecasting , 2014 .

[13]  Kwok-Wing Chau,et al.  ANN-based interval forecasting of streamflow discharges using the LUBE method and MOFIPS , 2015, Eng. Appl. Artif. Intell..

[14]  H. Randolph Thomas,et al.  Factor Model of Construction Productivity , 1987 .

[15]  William Ibbs,et al.  Quantified Impacts of Project Change , 2007 .

[16]  Albert P.C. Chan,et al.  Critical Review of Labor Productivity Research in Construction Journals , 2014 .

[17]  Peter E.D. Love,et al.  Re-Examining the Association between Quality and Safety Performance in Construction: From Heterogeneous to Homogeneous Datasets , 2017 .

[18]  Awad S. Hanna,et al.  Impact of Shift Work on Labor Productivity for Labor Intensive Contractor , 2008 .

[19]  Serdar Ulubeyli,et al.  Effect of basic motivational factors on construction workforce productivity in turkey , 2008 .

[20]  Mark Sumner,et al.  Prediction interval methodology based on fuzzy numbers and its extension to fuzzy systems and neural networks , 2019, Expert Syst. Appl..

[21]  Amlan Mukherjee,et al.  Using Agent-Based Modeling to Study Construction Labor Productivity as an Emergent Property of Individual and Crew Interactions , 2009 .

[22]  Jonathan H. Westover,et al.  Enhancing long‐term worker productivity and performance , 2010 .

[23]  Saeid Nahavandi,et al.  Neural Network-Based Uncertainty Quantification: A Survey of Methodologies and Applications , 2018, IEEE Access.

[24]  Farnad Nasirzadeh,et al.  A hybrid simulation approach to model and improve construction labor productivity , 2017 .

[25]  Dong Zhai,et al.  Relationship between Automation and Integration of Construction Information Systems and Labor Productivity , 2009 .

[26]  Saeid Nahavandi,et al.  Quantifying uncertainties of neural network-based electricity price forecasts , 2013 .

[27]  Farnad Nasirzadeh,et al.  Dynamic modeling of labor productivity in construction projects , 2013 .

[28]  David Arditi,et al.  The JIT materials management system in developing countries , 2005 .

[29]  R. Malcolm W. Horner,et al.  Modeling Construction Labor Productivity , 1990 .

[30]  Giovanni C. Migliaccio,et al.  An exploratory study of the relationship between construction workforce physical strain and task level productivity , 2014 .

[31]  Amir F. Atiya,et al.  Lower Upper Bound Estimation Method for Construction of Neural Network-Based Prediction Intervals , 2011, IEEE Transactions on Neural Networks.

[32]  Khaled Mahmoud El-Gohary,et al.  Factors Influencing Construction Labor Productivity in Egypt , 2014 .

[33]  Abdulaziz M. Jarkas Buildability Factors Influencing Concreting Labor Productivity , 2012 .

[34]  Serdar Ulubeyli,et al.  Subcontractor selection practices in international construction projects , 2010 .

[35]  Dong Zhai,et al.  Relationship between Changes in Material Technology and Construction Productivity , 2009 .

[36]  Abbas Khosravi,et al.  Particle swarm optimization for construction of neural network-based prediction intervals , 2014, Neurocomputing.

[37]  Farnad Nasirzadeh,et al.  A hybrid simulation framework for modelling construction projects using agent-based modelling and system dynamics: an application to model construction workers' safety behavior , 2018 .

[38]  Awad S. Hanna,et al.  Impact of extended overtime on construction labor productivity , 2005 .

[39]  Tarek Zayed,et al.  Simulation-based construction productivity forecast using Neural-Network-Driven Fuzzy Reasoning , 2016 .

[40]  Khaled El-Rayes,et al.  Change Orders Impact on Labor Productivity , 2005 .