The Encountered Problems and Solutions in the Development of Coal Mine Rescue Robot
暂无分享,去创建一个
[1] Weidong Wang,et al. Development of Search‐and‐rescue Robots for Underground Coal Mine Applications , 2014, J. Field Robotics.
[2] Kevin Skadron,et al. Real-world design and evaluation of compiler-managed GPU redundant multithreading , 2014, 2014 ACM/IEEE 41st International Symposium on Computer Architecture (ISCA).
[3] Jeremy Green. Mine rescue robots requirements Outcomes from an industry workshop , 2013, 2013 6th Robotics and Mechatronics Conference (RobMech).
[4] Lance Molyneaux. Development of an Underground Mine Scout Robot , 2016 .
[5] Hua Zhu,et al. Explosion-Proof Design for Coal Mine Rescue Robots , 2011 .
[6] R. Remsburg. Advanced Thermal Design of Electronic Equipment , 1998 .
[7] Zhu Hua. Current Status and Technical Problems in the Research of Coal Mine Rescue Robot , 2007 .
[8] Hua Zhu,et al. A portable embedded explosion gas detection and identification device based on intelligent electronic nose system , 2016 .
[9] Xiao Lei Wang,et al. New Structural Design of Coal Mine Rescue Robot , 2013 .
[10] Fan Zhang,et al. A Novel Mine Mobile Communication System without Blind Zones , 2011 .
[11] Yang Yao-hai. Safety Requirements of Electrical Explosion Protected Equipments Used in Coal Industry. , 2008 .
[12] Satoshi Tadokoro,et al. Priority issues of disaster robotics in Japan , 2013, 2013 IEEE Region 10 Humanitarian Technology Conference.
[13] Kazimierz Lebecki,et al. A new simple methodology for evaluation of explosion risk in underground coal mines , 2013 .
[14] Yibin Li,et al. Mechanism and Explosion-proof Design for a Coal Mine Detection Robot , 2011 .
[15] Satoshi Tadokoro,et al. Rescue robotics challenge , 2010, 2010 IEEE Workshop on Advanced Robotics and its Social Impacts.
[16] Wang Lian-dong. Application of Scaled Model Technique in Design of RF Simulation Anechoic Chamber , 2008 .
[17] Somajyoti Majumder,et al. Design and Analysis Towards Successful Development of a Tele-Operated Mobile Robot for Underground Coal Mines , 2016 .
[18] Gu Ru-qing. Discussion on Application of 10 kV Flame Proof and Positive Pressure Type Equipment to Underground Mine , 2012 .
[19] Liu Chang-qing. Research Status of the Disaster Rescue Robot and Its Applications to the Mine Rescue , 2006 .
[20] YU Cun-jua. Experimental research on secondary blasting of coal dust and gas induced by gas explosion , 2014 .
[21] Ch. S. N. Murthy,et al. Mine Rescue Robot System - A Review , 2015 .
[22] Miao Li-dong. Development of hardware-in-the-loop simulation driver , 2010 .
[23] Wojciech Moczulski,et al. Exploration Mobile Robot for Coal Mines , 2015, MESAS.
[24] D. I. Jones,et al. Hardware-in-the-Loop Simulation , 2013 .
[25] G. Reina,et al. A new approach for terrain analysis in mobile robot applications , 2013, 2013 IEEE International Conference on Mechatronics (ICM).
[26] Xu Chunying. Recent Advance of Spray Polyurea Technology , 2010 .
[27] Weidong Shi,et al. Structural Analysis of Explosion Proof Mine Pump Base on the Material of QT600-3 , 2013 .
[28] He Kai,et al. Research on avoidance obstacle strategy of coal underground inspection robot based on binocular vision , 2017, 2017 29th Chinese Control And Decision Conference (CCDC).
[29] Yu Beng Leau,et al. Software Development Life Cycle AGILE vs Traditional Approaches , 2012 .
[30] Nayan B. Ruparelia,et al. Software development lifecycle models , 2010, SOEN.
[31] Robert Meyers,et al. Real-time photorealistic virtualized reality interface for remote mobile robot control , 2010, ISRR.
[32] Mohan M. Trivedi,et al. Audiovisual Information Fusion in Human–Computer Interfaces and Intelligent Environments: A Survey , 2010, Proceedings of the IEEE.