Exact algorithms for the job sequencing and tool switching problem
暂无分享,去创建一个
[1] N. Biggs. THE TRAVELING SALESMAN PROBLEM A Guided Tour of Combinatorial Optimization , 1986 .
[2] Alain Hertz,et al. An Improved Tabu Search Approach for Solving the Job Shop Scheduling Problem with Tooling Constraints , 1996, Discret. Appl. Math..
[3] Gilbert Laporte,et al. New Insertion and Postoptimization Procedures for the Traveling Salesman Problem , 1992, Oper. Res..
[4] Christopher S. Tang,et al. Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches , 1988, Oper. Res..
[5] Kathryn E. Stecke,et al. A synthesis of decision models for tool management in automated manufacturing , 1993 .
[6] J. Bard. A Heuristic for Minimizing the Number of Tool Switches on a Flexible Machine , 1988 .
[7] William S. Curran,et al. A/I: a synthesis , 1982, ACM-SE 20.
[8] Nagraj Balakrishnan,et al. Opportunistic retooling of a flexible machine subject to failure , 2001 .
[9] Abilio Lucena,et al. Branch and cut algorithms , 1996 .
[10] Laszlo A. Belady,et al. A Study of Replacement Algorithms for Virtual-Storage Computer , 1966, IBM Syst. J..
[11] Frits C. R. Spieksma,et al. Minimizing the number of tool switches on a flexible machine , 1994 .
[12] Yves Crama,et al. Combinatorial optimization models for production scheduling in automated manufacturing systems , 1997 .
[13] Ali S. Kiran,et al. Automating tooling in an FMS , 1988 .
[14] M. Selim Akturk,et al. Tool magazine arrangement and operations sequencing on CNC machines , 1996, Comput. Oper. Res..
[15] Gerd Finke,et al. k-server problems with bulk requests: an application to tool switching in manufacturing , 2000, Ann. Oper. Res..
[16] Gerd Finke,et al. Scheduling with resource management in manufacturing systems , 1994 .
[17] Manbir S. Sodhi,et al. Multiperiod tool and production assignment in flexible manufacturing systems , 1994 .
[18] A. G. Oerlemans. Production planning for flexible manufacturing systems , 1992 .
[19] Marc E. Posner. A Sequencing Problem with Release Dates and Clustered Jobs , 1986 .
[20] J. Kruskal. On the shortest spanning subtree of a graph and the traveling salesman problem , 1956 .
[21] G. Laporte,et al. Heuristics for minimizing tool switches when scheduling part types on a flexible machine , 1998 .