Risk mitigation strategies for project management, platform development and supply chain design
暂无分享,去创建一个
[1] A. Gawer,et al. Platform Leadership How Intel, Microsoft, and Cisco Drive Industry Innovation , 2002 .
[2] James E. Smith,et al. Valuing Oil Properties: Integrating Option Pricing and Decision Analysis Approaches , 1998, Oper. Res..
[3] L. Argote. Organizational Learning: Creating, Retaining and Transferring Knowledge , 1999 .
[4] Suresh P. Sethi,et al. Are Base-Stock Policies Optimal in Inventory Problems with Multiple Delivery Modes? , 2006, Oper. Res..
[5] C. Shapiro,et al. Network Externalities, Competition, and Compatibility , 1985 .
[6] John D. Sterman,et al. System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .
[7] Nicholas Economides,et al. Two-Sided Competition of Proprietary vs. Open Source Technology Platforms and the Implications for the Software Industry , 2005, Manag. Sci..
[8] J. Rochet,et al. Platform competition in two sided markets , 2003 .
[9] J. Rochet,et al. Two-sided markets: a progress report , 2006 .
[10] Andrew Ford,et al. System Dynamics and the Electric Power Industry , 1997 .
[11] Panos Y. Papalambros. Optimal Design of Mechanical Engineering Systems , 1995 .
[12] J. Sterman,et al. The energy transition and the economy : a system dynamics approach , 1982 .
[13] B. Kogut,et al. Operating flexibility, global manufacturing, and the option value of a multinational network , 1994 .
[14] Andrei Hagiu. Pricing and commitment by two‐sided platforms , 2006 .
[15] James E. Smith,et al. Alternative Approaches for Solving Real-Options Problems: (Comment on Brandão et al. 2005) , 2005, Decis. Anal..
[16] M. Armstrong. Competition in Two-Sided Markets ¤ , 2005 .
[17] W. C. Benton,et al. SOLE SOURCING VERSUS DUAL SOURCING UNDER STOCHASTIC DEMANDS AND LEAD TIMES , 1994 .
[18] James S. Dyer,et al. Decision Analysis and Real Options: A Discrete Time Approach to Real Option Valuation , 2005, Ann. Oper. Res..
[19] B. Caillaud,et al. Chicken & Egg: Competition Among Intermediation Service Providers , 2003 .
[20] K. H. Daniel,et al. Multistage inventory models and techniques , 1965 .
[21] Wim Turkenburg,et al. Global experience curves for wind farms , 2005 .
[22] Asoo J. Vakharia,et al. Single versus multiple supplier sourcing strategies , 2007, Eur. J. Oper. Res..
[23] Simon P. Anderson,et al. Market Provision of Broadcasting: A Welfare Analysis ∗ , 2003 .
[24] Feryal Erhun,et al. Dual-supply inventory problem with capacity limits on order sizes and unrestricted ordering costs , 2009 .
[25] James S. Dyer,et al. Valuing Multifactor Real Options Using an Implied Binomial Tree , 2010, Decis. Anal..
[26] Hemant K. Bhargava,et al. Economics of an Information Intermediary with Aggregation Benefits , 2004, Inf. Syst. Res..
[27] R. Akella,et al. Diversification under supply uncertainty , 1993 .
[28] S. Rosen,et al. Monopoly and product quality , 1978 .
[29] J. Hull. Options, Futures, and Other Derivatives , 1989 .
[30] Yigal Gerchak,et al. The Structure of Periodic Review Policies in the Presence of Random Yield , 1990, Oper. Res..
[31] Maqbool Dada,et al. A Newsvendor's Procurement Problem when Suppliers Are Unreliable , 2007, Manuf. Serv. Oper. Manag..
[32] R. McDonald,et al. The Value of Waiting to Invest , 1982 .
[33] George P. Richardson,et al. Modeling the estimation of petroleum resources in the United States , 1988 .
[34] Eduardo S. Schwartz,et al. Investment Under Uncertainty. , 1994 .
[35] David N. Ford,et al. Project management quality and the value of flexible strategies , 2006 .
[36] Stuart E. Madnick,et al. Software Project Dynamics: An Integrated Approach , 1991 .
[37] Lenos Trigeorgis,et al. A Log-Transformed Binomial Numerical Analysis Method for Valuing Complex Multi-Option Investments , 1991, Journal of Financial and Quantitative Analysis.
[38] Paul E. Green,et al. Conjoint Analysis in Marketing: New Developments with Implications for Research and Practice , 1990 .
[39] Stephen E. Margolis,et al. Network externality : an uncommon tragedy , 1994 .
[40] Andrei Hagiu,et al. Platform Rules: Multi-Sided Platforms as Regulators , 2008 .
[41] M. Armstrong,et al. Two-sided Markets, Competitive Bottlenecks and Exclusive Contracts , 2004 .
[42] Durward K. Sobek,et al. Adapting real options to new product development by modeling the second Toyota paradox , 2005, IEEE Transactions on Engineering Management.
[43] Gad Allon,et al. Global Dual Sourcing: Tailored Base-Surge Allocation to Near- and Offshore Production , 2010, Manag. Sci..
[44] G. Friedl. Copeland, Tom/Antikarov, Vladimir, Real Options. A Practitioner’s Guide, Texere LLC, New York 2001, $ 59,95 , 2002 .
[45] W. Arthur,et al. INCREASING RETURNS AND LOCK-IN BY HISTORICAL EVENTS , 1989 .
[46] E. W. Barankin,et al. A DELIVERY-LAG INVENTORY MODEL WITH AN EMERGENCY PROVISION , 1961 .
[47] R. Pindyck. Irreversibility, Uncertainty, and Investment , 1990 .
[48] M. Armstrong. The theory of access pricing and interconnection , 2001 .
[49] Michael A. Cusumano,et al. Platform leadership , 2002 .
[50] Hong Chen,et al. Joint replenishment and pricing decisions in inventory systems with stochastically dependent supply capacity , 2008, Eur. J. Oper. Res..
[51] K. McCardle,et al. Arbitrage, rationality, and equilibrium , 1991 .
[52] Yoichiro Fukuda. Optimal Policies for the Inventory Problem with Negotiable Leadtime , 1964 .
[53] Robert T. Clemen,et al. Making Hard Decisions: An Introduction to Decision Analysis , 1997 .
[54] Nan Yang,et al. Optimal Supply Diversification Under General Supply Risks , 2009, Oper. Res..
[55] M. Parlar,et al. Diversification under yield randomness in inventory models , 1993 .
[56] Andrei Hagiu,et al. Exclusivity and Control , 2010 .
[57] Brian Tomlin,et al. On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks , 2006, Manag. Sci..
[58] Jian Yang,et al. A Production-Inventory System with Markovian Capacity and Outsourcing Option , 2005, Oper. Res..
[59] Karl T. Ulrich,et al. 50th Anniversary Article: Technological Innovation, Product Development, and Entrepreneurship in Management Science , 2004, Manag. Sci..
[60] Roger F. Naill,et al. A System Dynamics Model for National Energy Policy Planning , 1992 .
[61] James S. Dyer,et al. Using Binomial Decision Trees to Solve Real-Option Valuation Problems , 2005, Decis. Anal..
[62] F. Black,et al. The Pricing of Options and Corporate Liabilities , 1973, Journal of Political Economy.
[63] Alan Scheller-Wolf,et al. Inventory Models with Expedited Ordering: Single Index Policies , 2002 .
[64] A. Whittemore,et al. Optimal Inventory Under Stochastic Demand with Two Supply Options , 1977 .
[65] Adam Borison,et al. Real Options Analysis: Where Are the Emperor's Clothes? , 2005 .
[66] Klaus-Ole Vogstad,et al. A system dynamics analysis of the Nordic electricity market : the transition from fossil fuelled toward a renewable supply within a liberalised electricity market , 2005 .
[67] Sridhar Seshadri,et al. New Policies for the Stochastic Inventory Control Problem with Two Supply Sources , 2010, Oper. Res..
[68] Awi Federgruen,et al. An Inventory Model with Limited Production Capacity and Uncertain Demands II. The Discounted-Cost Criterion , 1986, Math. Oper. Res..
[69] Evan L. Porteus,et al. Multistage Inventory Management with Expediting , 2000, Oper. Res..
[70] Yimin Wang,et al. Mitigating Supply Risk: Dual Sourcing or Process Improvement? , 2010, Manuf. Serv. Oper. Manag..
[71] Thomas R. Eisenmann,et al. Strategies for Two Sided Markets , 2006 .
[72] James S. Dyer,et al. Discrete time modeling of mean-reverting stochastic processes for real option valuation , 2008, Eur. J. Oper. Res..
[73] Andrew Ford,et al. Simulating the Impact of a Carbon Market on the Electricity System in the Western U.S.A. , 2006 .
[74] Dennis R. Capozza,et al. The Intensity and Timing of Investment: The Case of Land , 1994 .
[75] George P. Richardson,et al. A petroleum life cycle model for the United States with endogenous technology, exploration, recovery, and demand , 1990 .
[76] Nan Yang,et al. Selecting a Portfolio of Suppliers Under Demand and Supply Risks , 2008, Oper. Res..
[77] George P. Richardson,et al. An experiment to evaluate methods for estimating fossil fuel resources , 1985 .
[78] Edward B. Roberts,et al. A simple model of R & D project dynamics , 1974 .
[79] D. Siegel,et al. Option Valuation of Claims on Real Assets: The Case of Offshore Petroleum Leases , 1988 .
[80] Geoffrey G. Parker,et al. Information Complements, Substitutes, and Strategic Product Design , 2000, ICIS.
[81] David N. Ford,et al. System Dynamics Applied to Project Management: A Survey, Assessment, and Directions for Future Research , 2007, System Dynamics.
[82] Geoffrey G. Parker,et al. Two-Sided Network Effects: A Theory of Information Product Design , 2010, Manag. Sci..
[83] Yunzeng Wang,et al. Periodic review production models with variable capacity, random yield, and uncertain demand , 1996 .
[84] Hau L. Lee,et al. Lot Sizing with Random Yields: A Review , 1995, Oper. Res..
[85] T. Morton,et al. A periodic review, production planning model with uncertain capacity and uncertain demand—optimality of extended myopic policies , 1994 .
[86] Judith Gurney. BP Statistical Review of World Energy , 1985 .
[87] Karl T. Ulrich,et al. Special Issue on Design and Development: Product Development Decisions: A Review of the Literature , 2001, Manag. Sci..
[88] James E. Smith,et al. Valuing Risky Projects: Option Pricing Theory and Decision Analysis , 1995 .
[89] Ulrich Kaiser,et al. Price structure in two-sided markets: Evidence from the magazine industry , 2006 .