설계변경에 따른 설계추가용역비 산정에 관한 연구

During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additiona cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.