Disassembly scheduling problem: literature review and future research directions
暂无分享,去创建一个
[1] P. Xirouchakis,et al. Disassembly scheduling: Integer programming models , 2004 .
[2] Zhi-Hai Zhang,et al. Capacitated disassembly scheduling with parts commonality and start-up cost and its industrial application , 2016 .
[3] P. Xirouchakis,et al. Capacitated disassembly scheduling with random demand , 2010 .
[4] Surendra M. Gupta,et al. Lot sizing in reverse MRP for scheduling disassembly , 2008 .
[5] Dong-Ho Lee,et al. A heuristic for multi-period disassembly leveling and scheduling , 2011, 2011 IEEE/SICE International Symposium on System Integration (SII).
[6] L. V. Wassenhove,et al. Multilevel capacitated lotsizing complexity and LP-based heuristics , 1991 .
[7] Dong-Ho Lee,et al. A branch and bound algorithm for disassembly scheduling with assembly product structure , 2009, J. Oper. Res. Soc..
[8] Ian M. Langella. Heuristics for demand-driven disassembly planning , 2007, Comput. Oper. Res..
[9] Faicel Hnaien,et al. Robust single-item lot-sizing problems with discrete-scenario lead time , 2017 .
[10] Dong-Ho Lee,et al. An Exact Algorithm for Two-Level Disassembly Scheduling , 2008 .
[11] Hyoung-Ho Doh,et al. Disassembly leveling and lot sizing for multiple product types: a basic model and its extension , 2016 .
[12] Karl Inderfurth,et al. Heuristics for solving disassemble-to-order problems with stochastic yields , 2006, OR Spectr..
[13] Dong-Ho Lee,et al. A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints , 2006, J. Oper. Res. Soc..
[14] Manoj Kumar Tiwari,et al. Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem , 2012 .
[15] Zhi-Hai Zhang,et al. Capacitated disassembly scheduling under stochastic yield and demand , 2017, Eur. J. Oper. Res..
[16] Surendra M. Gupta,et al. Disassembly of multiple product structures , 1997 .
[17] L. Amodeo,et al. Efficient metaheuristic for multi-product disassembly lot sizing problem with lost sales , 2016, 2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM).
[18] Shona D. Morgan,et al. A systematic literature review of remanufacturing scheduling , 2013 .
[19] Shona D. Morgan,et al. Remanufacturing scheduling systems: an exploratory analysis comparing academic research and industry practice , 2014 .
[20] Surendra M. Gupta,et al. Disassembly of complex product structures with parts and materials commonality , 1997 .
[21] B. Adenso-Díaz,et al. Reverse MRP under uncertain and imprecise demand , 2009 .
[22] Dong-Ho Lee,et al. Disassembly planning and scheduling: Review and further research , 2001 .
[23] J. K. Lenstra,et al. Deterministic Production Planning: Algorithms and Complexity , 1980 .
[24] Christian Ullerich,et al. Flexible disassembly planning considering product conditions , 2013 .
[25] Paul Xirouchakis,et al. Disassembly Scheduling with Capacity Constraints , 2002 .
[26] Wun-Hwa Chen,et al. Analysis of relaxations for the multi-item capacitated lot-sizing problem , 1991 .
[27] Lionel Amodeo,et al. Heuristics for multi-product capacitated disassembly lot sizing with lost sales , 2016 .
[28] Surendra M. Gupta,et al. Disassembly to order system under uncertainty , 2006 .
[29] Nan Gao,et al. A genetic algorithm for disassembly scheduling with assembly product structure , 2008, 2008 IEEE International Conference on Service Operations and Logistics, and Informatics.
[30] Dong-Ho Lee,et al. A two-stage heuristic for disassembly scheduling with assembly product structure , 2004, J. Oper. Res. Soc..
[31] M. Florian,et al. DETERMINISTIC PRODUCTION PLANNING WITH CONCAVE COSTS AND CAPACITY CONSTRAINTS. , 1971 .
[32] Dong-Ho Lee,et al. Disassembly scheduling: literature review and future research directions , 2007 .
[33] Karl Inderfurth,et al. How Yield Process Misspecification Affects the Solution of Disassemble-to-order Problems , 2015 .
[34] Surendra M. Gupta,et al. A MULTI-CRITERIA DECISION MAKING APPROACH FOR DISASSEMBLY-TO-ORDER SYSTEMS , 2002 .
[35] P. Xirouchakis,et al. Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality , 2006 .
[36] P. Xirouchakis,et al. Disassembly Scheduling with Multiple Product Types , 2003 .
[37] Dong-Ho Lee,et al. Disassembly Scheduling with Parts Commonality Using Petri Nets with Timestamps , 2001, Fundam. Informaticae.
[38] Harvey M. Wagner,et al. Dynamic Version of the Economic Lot Size Model , 2004, Manag. Sci..