Multi-Item EPQ Model with Scrap, Rework and Multi-Delivery using Common Cycle Policy
暂无分享,去创建一个
M-F. Wu | S. W. Chiu | C-T. Tseng | P-C. Sung
[1] Manuel D. Rossetti,et al. Evaluation of segmentation techniques for inventory management in large scale multi-item inventory systems , 2011 .
[2] W. Shih. Optimal inventory policies when stockouts result from defective products , 1980 .
[3] G. Gaalman. Optimal Aggregation of Multi-Item Production Smoothing Models , 1978 .
[4] Hiroaki Ishii,et al. MULTI-ITEM PRODUCTION PLANNING AND MANAGEMENT SYSTEM BASED ON UNFULFILLED ORDER RATE IN SUPPLY CHAIN , 2007 .
[5] Hiroshi Katayama. An integrated management procedure of multi-item mixed-line production system - Its hierarchical structure and performance evaluation , 1998 .
[6] V. Aggarwal. Grouping multi-item inventory using common cycle periods , 1984 .
[7] B. Sarkar,et al. An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand , 2013 .
[8] Viliam Makis. Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .
[9] Steven Nahmias,et al. Production and operations analysis , 1992 .
[10] Cuauhtémoc Sánchez-Ramírez,et al. Dynamic Self-Assessment of Supply Chains Performance: an Emerging Market Approach , 2013 .
[11] Ming-Hon Hwang,et al. Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework , 2013 .
[12] Singa Wang Chiu,et al. Combining an alternative multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..
[13] J. C. Jáuregui-Correa,et al. A Wavelet Approach to Estimate The Quality of Ground Parts , 2012 .
[14] Martin W. P. Savelsbergh,et al. A multi-item production planning model with setup times: algorithms, reformulations, and polyhedral characterizations for a special case , 2003, Math. Program..
[15] Singa Wang Chiu,et al. Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..
[16] Singa Wang Chiu,et al. Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .
[17] Yuan-Shyi Peter Chiu,et al. Replenishment run time problem with machine breakdown and failure in rework , 2012, Expert Syst. Appl..
[18] Nico Dellaert. Multi-item production control for production to order , 1988 .
[19] J. Acosta-Cano,et al. Loose Coupling Based Reference Scheme for Shop Floor-Control System/Production-Equipment Integration , 2013 .
[20] C. K. Ke. Research on Optimized Problem-Solving Solutions Selection of the Production Process , 2013 .
[21] Y-S. P. Chiu,et al. Reexamination of “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework” Using an Alternative Approach , 2013 .
[22] Ahmad Makui,et al. Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint , 2012, Expert Syst. Appl..
[23] Singa Wang Chiu,et al. Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown , 2013 .
[24] Hong-Dar Lin,et al. Note on "replenishment run time problem with machine breakdown and failure in rework" , 2012, Expert Syst. Appl..
[25] Cerry M. Klein,et al. Constrained multi-item inventory systems: An implicit approach , 1993, Comput. Oper. Res..
[26] Adam Janiak,et al. Batching work and rework processes with limited deterioration of reworkables , 2006, Comput. Oper. Res..
[27] Singa Wang Chiu,et al. Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule , 2013 .
[28] Y. Chiu,et al. Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate , 2013 .
[29] Hong-Dar Lin,et al. A note on "intra-supply chain system with multiple sales locations and quality assurance" , 2013, Expert Syst. Appl..
[30] Suresh Kumar Goyal,et al. An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment , 2000 .
[31] Candace Arai Yano,et al. The economic lot and delivery scheduling problem: The single item case , 1992 .
[32] D. A. Serel. Multi-item quick response system with budget constraint , 2012 .
[33] Singa Wang Chiu,et al. Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework , 2013 .
[34] S. Viswanathan,et al. Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..
[35] Singa Wang Chiu,et al. Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments , 2012, Appl. Math. Lett..
[36] Singa Wang Chiu,et al. Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework , 2012, Expert Syst. Appl..
[37] Singa Wang Chiu,et al. Production–shipment policy for EPQ model with quality assurance and an improved delivery schedule , 2013 .