Multi-Item EPQ Model with Scrap, Rework and Multi-Delivery using Common Cycle Policy

This paper is concerned with determining the optimal common production cycle policy for a multi-item economicproduction quantity (EPQ) model with scrap, rework and multiple deliveries. The classic EPQ model considers theoptimal replenishment quantity of single product under a perfect production assumption and a continuous inventoryissuing policy. However, in real life production planning, manufacturing firms often plan to have multiple productsmade in turn on a single machine in order to maximize the machine utilization. Also, dealing with random defectiveitems during the production run seems to be an inevitable task, and the multi-delivery policy is commonly adopted fordistributing finished items to customers. In this study, we assume a portion of nonconforming items is scrap and theother portion of them can be reworked and repaired in the same production cycle with additional cost. The objective isto determine an optimal common production cycle time that minimizes the long-run average cost per unit time for sucha specific multi-item EPQ model with scrap, rework and multi-delivery policy. Mathematical modeling and analysis isused and a closed-form optimal common cycle time for multi-item production planning is obtained. A numericalexample is provided to demonstrate the practical usage of research result.

[1]  Manuel D. Rossetti,et al.  Evaluation of segmentation techniques for inventory management in large scale multi-item inventory systems , 2011 .

[2]  W. Shih Optimal inventory policies when stockouts result from defective products , 1980 .

[3]  G. Gaalman Optimal Aggregation of Multi-Item Production Smoothing Models , 1978 .

[4]  Hiroaki Ishii,et al.  MULTI-ITEM PRODUCTION PLANNING AND MANAGEMENT SYSTEM BASED ON UNFULFILLED ORDER RATE IN SUPPLY CHAIN , 2007 .

[5]  Hiroshi Katayama An integrated management procedure of multi-item mixed-line production system - Its hierarchical structure and performance evaluation , 1998 .

[6]  V. Aggarwal Grouping multi-item inventory using common cycle periods , 1984 .

[7]  B. Sarkar,et al.  An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand , 2013 .

[8]  Viliam Makis Optimal lot sizing and inspection policy for an EMQ model with imperfect inspections , 1998 .

[9]  Steven Nahmias,et al.  Production and operations analysis , 1992 .

[10]  Cuauhtémoc Sánchez-Ramírez,et al.  Dynamic Self-Assessment of Supply Chains Performance: an Emerging Market Approach , 2013 .

[11]  Ming-Hon Hwang,et al.  Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework , 2013 .

[12]  Singa Wang Chiu,et al.  Combining an alternative multi-delivery policy into economic production lot size problem with partial rework , 2012, Expert Syst. Appl..

[13]  J. C. Jáuregui-Correa,et al.  A Wavelet Approach to Estimate The Quality of Ground Parts , 2012 .

[14]  Martin W. P. Savelsbergh,et al.  A multi-item production planning model with setup times: algorithms, reformulations, and polyhedral characterizations for a special case , 2003, Math. Program..

[15]  Singa Wang Chiu,et al.  Intra-supply chain system with multiple sales locations and quality assurance , 2013, Expert Syst. Appl..

[16]  Singa Wang Chiu,et al.  Incorporating multi-delivery policy and quality assurance into economic production lot size problem , 2009 .

[17]  Yuan-Shyi Peter Chiu,et al.  Replenishment run time problem with machine breakdown and failure in rework , 2012, Expert Syst. Appl..

[18]  Nico Dellaert Multi-item production control for production to order , 1988 .

[19]  J. Acosta-Cano,et al.  Loose Coupling Based Reference Scheme for Shop Floor-Control System/Production-Equipment Integration , 2013 .

[20]  C. K. Ke Research on Optimized Problem-Solving Solutions Selection of the Production Process , 2013 .

[21]  Y-S. P. Chiu,et al.  Reexamination of “Combining an alternative multi-delivery policy into economic production lot size problem with partial rework” Using an Alternative Approach , 2013 .

[22]  Ahmad Makui,et al.  Multiproduct multiple-buyer single-vendor supply chain problem with stochastic demand, variable lead-time, and multi-chance constraint , 2012, Expert Syst. Appl..

[23]  Singa Wang Chiu,et al.  Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown , 2013 .

[24]  Hong-Dar Lin,et al.  Note on "replenishment run time problem with machine breakdown and failure in rework" , 2012, Expert Syst. Appl..

[25]  Cerry M. Klein,et al.  Constrained multi-item inventory systems: An implicit approach , 1993, Comput. Oper. Res..

[26]  Adam Janiak,et al.  Batching work and rework processes with limited deterioration of reworkables , 2006, Comput. Oper. Res..

[27]  Singa Wang Chiu,et al.  Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule , 2013 .

[28]  Y. Chiu,et al.  Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate , 2013 .

[29]  Hong-Dar Lin,et al.  A note on "intra-supply chain system with multiple sales locations and quality assurance" , 2013, Expert Syst. Appl..

[30]  Suresh Kumar Goyal,et al.  An optimal policy for a single-vendor single-buyer integrated production–inventory system with capacity constraint of the transport equipment , 2000 .

[31]  Candace Arai Yano,et al.  The economic lot and delivery scheduling problem: The single item case , 1992 .

[32]  D. A. Serel Multi-item quick response system with budget constraint , 2012 .

[33]  Singa Wang Chiu,et al.  Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework , 2013 .

[34]  S. Viswanathan,et al.  Optimal strategy for the integrated vendor-buyer inventory model , 1998, Eur. J. Oper. Res..

[35]  Singa Wang Chiu,et al.  Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments , 2012, Appl. Math. Lett..

[36]  Singa Wang Chiu,et al.  Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework , 2012, Expert Syst. Appl..

[37]  Singa Wang Chiu,et al.  Production–shipment policy for EPQ model with quality assurance and an improved delivery schedule , 2013 .