River diversion scheme Chamera Hydroelectric Project stage-II (3 × 100 MW)

The diversion works in Chamera Hydroelectric Project Stage-II have been provided to divert the non-monsoon river flow whereas, during monsoon months, river was allowed to pass over partially constructed spillway blocks.