Fatigue Evaluation of Transverse U-Bar Joint Details for Accelerated Bridge Construction
暂无分享,去创建一个
[1] Ian M. May,et al. Development of in situ joints for pre-cast bridge deck units , 2006 .
[2] J. Leroy Hulsey,et al. Field Test and 3D FE Modeling of Decked Bulb-Tee Bridges , 2007 .
[3] Cheryl Elizabeth Chapman. Behavior of Precast Bridge Deck Joints with Small Bend Diameter U-Bars , 2010 .
[4] Zhongguo John Ma,et al. Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Fatigue Evaluation , 2010 .
[5] Peng Zhu,et al. Selection of Durable Closure Pour Materials for Accelerated Bridge Construction , 2010 .
[6] James L Noland,et al. Computer-Aided Structural Engineering (CASE) Project: Decision Logic Table Formulation of ACI (American Concrete Institute) 318-77 Building Code Requirements for Reinforced Concrete for Automated Constraint Processing. Volume 1. , 1986 .
[7] Samuel Lewis. Experimental Investigation of Precast Bridge Deck Joints with U-bar and Headed Bar Joint Details , 2009 .
[8] Zhongguo John Ma,et al. Improved Longitudinal Joint Details in Decked Bulb Tees for Accelerated Bridge Construction: Concept Development , 2010 .