Design and management of manufacturing systems for production quality

Abstract Manufacturing companies are continuously facing the challenge of operating their manufacturing processes and systems in order to deliver the required production rates of high quality products, while minimizing the use of resources. Production quality is proposed in this paper as a new paradigm aiming at going beyond traditional six-sigma approaches. This new paradigm is extremely relevant in technology intensive and emerging strategic manufacturing sectors, such as aeronautics, automotive, energy, medical technology, micro-manufacturing, electronics and mechatronics. Traditional six-sigma techniques show strong limitations in highly changeable production contexts, characterized by small batch productions, customized, or even one-of-a-kind products, and in-line product inspections. Innovative and integrated quality, production logistics and maintenance design, management and control methods as well as advanced technological enablers have a key role to achieve the overall production quality goal. This paper revises problems, methods and tools to support this paradigm and highlights the main challenges and opportunities for manufacturing industries in this context.

[1]  Neil A. Duffie,et al.  Design and Analysis of Closed-Loop Capacity Control for a Multi-Workstation Production System , 2005 .

[2]  Lei Liu,et al.  A Systematic Study of the Prediction Model for Operator-Induced Assembly Defects Based on Assembly Complexity Factors , 2009, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.

[3]  C. Richard Cassady,et al.  Minimizing Job Tardiness Using Integrated Preventive Maintenance Planning and Production Scheduling , 2003 .

[4]  Shiyu Zhou,et al.  Kinematic Analysis of Dimensional Variation Propagation for Multistage Machining Processes With General Fixture Layouts , 2007, IEEE Transactions on Automation Science and Engineering.

[5]  Joanna Daaboul,et al.  Design for mass customization: Product variety vs. process variety , 2011 .

[6]  Yoram Koren,et al.  Operation of Manufacturing Systems with Work-in-process Inventory and Production Control , 2004 .

[7]  Tzvi Raz A Survey of Models for Allocating Inspection Effort in Multistage Production Systems , 1986 .

[8]  Jian Liu,et al.  Quality-assured setup planning based on the stream-of-variation model for multi-stage machining processes , 2009 .

[9]  László Monostori,et al.  Complexity in engineering design and manufacturing , 2012 .

[10]  Jingshan Li,et al.  Throughput analysis in automotive paint shops: a case study , 2004, IEEE Transactions on Automation Science and Engineering.

[11]  Jeffrey S. Smith,et al.  An optimization model for selective inspection in serial manufacturing systems , 2004 .

[12]  Hongzhou Wang,et al.  A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..

[13]  Stanley B. Gershwin,et al.  Integrated quality and quantity modeling of a production line , 2005, OR Spectr..

[14]  Dennis E. Blumenfeld,et al.  Survey of recent advances on the interface between production system design and quality , 2013 .

[15]  Tullio Tolio,et al.  Step-NC Compliant Approach for Workpiece Setup Planning Problem on Transfer Line , 2010 .

[16]  Abraham Mehrez,et al.  An Overview of Representative Research of the Relationships Between Quality and Inventory , 1998 .

[17]  Dimitris Mourtzis,et al.  Decentralized manufacturing systems review: challenges and outlook , 2012, Logist. Res..

[18]  K. Wegener,et al.  Conditioning and monitoring of grinding wheels , 2011 .

[19]  Jeffrey W. Herrmann,et al.  Estimating manufacturing cycle time and throughput in flow shops with process drift and inspection , 2008 .

[20]  Benjamin Haefner,et al.  Quality Value Stream Mapping , 2014 .

[21]  Stanley B. Gershwin,et al.  Analysis of long flow lines with quality and operational failures , 2008 .

[22]  Hoda A. ElMaraghy,et al.  Quality prediction in manufacturing system design. , 2006 .

[23]  Soh-Khim Ong,et al.  A novel maintenance system for equipment serviceability improvement , 2013 .

[24]  Botond Kádár,et al.  Semantic Virtual Factory supporting interoperable modelling and evaluation of production systems , 2013 .

[25]  Ali Gharbi,et al.  Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems , 2011 .

[26]  Tino Langer,et al.  Determination of extended availability and productivity for assembly systems using existing data base , 2012 .

[27]  Panagiotis Tsarouhas,et al.  Performance Evaluation of an Automatic Transfer Line with WIP Scrapping During Long Failures , 2007, Manuf. Serv. Oper. Manag..

[28]  Mohamad Y. Jaber,et al.  Managing yield by lot splitting in a serial production line with learning, rework and scrap , 2010 .

[29]  Dennis E. Blumenfeld,et al.  Production system design for quality robustness , 2008 .

[30]  Ruey Huei Yeh State-age-dependent maintenance policies for deteriorating systems with Erlang sojourn time distributions , 1997 .

[31]  Dennis E. Blumenfeld,et al.  Effects of operating speed on production quality and throughput , 2008 .

[32]  Anil B. Jambekar A systems thinking perspective of maintenance, operations, and process quality , 2000 .

[33]  Lin Li,et al.  Option model for joint production and preventive maintenance system , 2009 .

[34]  Benoît Iung,et al.  Formalisation of a new prognosis model for supporting proactive maintenance implementation on industrial system , 2008, Reliab. Eng. Syst. Saf..

[35]  Heinrich Kuhn Analysis of Automated Flow Line Systems with Repair Crew Interference , 2003 .

[36]  G. Fogliazza,et al.  How Information Technology Enables the Potential flexibility and Re-Configurability of Highly Automated Manufacturing Plants , 2004 .

[37]  László Monostori,et al.  Agent-based systems for manufacturing , 2006 .

[38]  Giovanni Mummolo,et al.  The effect of dynamic worker behavior on flow line performance , 2009 .

[39]  H. Meier,et al.  Industrial Product-Service Systems—IPS2 , 2010 .

[40]  Christian Berggren,et al.  Manufacturing firms and integrated solutions: characteristics and implications , 2004 .

[41]  Fugee Tsung,et al.  Statistical monitoring of multi-stage processes based on engineering models , 2008 .

[42]  Jing Zhou,et al.  Integrated reconfiguration and age-based preventive maintenance decision making , 2007 .

[43]  Lani Haque,et al.  A survey of the machine interference problem , 2007, Eur. J. Oper. Res..

[44]  Robert Schmitt,et al.  Tolerancing subjective and uncertain customer requirements regarding perceived product quality , 2013 .

[45]  Sotiris Makris,et al.  Assembly support using AR technology based on automatic sequence generation , 2013 .

[46]  Armando Fox,et al.  Improving Machine Tool Interoperability Using Standardized Interface Protocols: MT Connect , 2008 .

[47]  Lin Li,et al.  Bottleneck Detection of Manufacturing Systems Using Data Driven Method , 2007, 2007 IEEE International Symposium on Assembly and Manufacturing.

[48]  Jingshan Li,et al.  Throughput analysis of production systems: recent advances and future topics , 2009 .

[49]  Raj Iyer,et al.  Condition-based Maintenance and the product improvement process , 2010, Comput. Ind..

[50]  D. Ceglarek,et al.  Time-Based Competition in Multistage Manufacturing: Stream-of-Variation Analysis (SOVA) Methodology—Review , 2004 .

[51]  Kimberly P. Ellis,et al.  Development and application of a worker assignment model to evaluate a lean manufacturing cell , 2009 .

[52]  Jianjun Shi,et al.  Stream of Variation Modeling and Analysis for Multistage Manufacturing Processes , 2006 .

[53]  József Váncza,et al.  Coordinating supply networks in customized mass production - a contract-based approach , 2006 .

[54]  Fugee Tsung,et al.  Statistical process control for multistage manufacturing and service operations: A review and some extensions , 2008 .

[55]  Jun Ni,et al.  Decision support systems for effective maintenance operations , 2012 .

[56]  James Llinas,et al.  An introduction to multi-sensor data fusion , 1998, ISCAS '98. Proceedings of the 1998 IEEE International Symposium on Circuits and Systems (Cat. No.98CH36187).

[57]  Dimitris Mourtzis,et al.  A multi-criteria evaluation of centralized and decentralized production networks in a highly customer-driven environment , 2012 .

[58]  P. Bar-Yoseph,et al.  Multiresolution 2D geometric meshing for multiscale finite element analysis of bone micro-structures , 2010 .

[59]  Jun Ni,et al.  Maintenance scheduling for a manufacturing system of machines with adjustable throughput , 2007 .

[60]  Ki Ling Cheung,et al.  Joint determination of preventive maintenance and safety stocks in an unreliable production environment , 1997 .

[61]  László Monostori,et al.  Generating alternative process plans for complex parts , 2013 .

[62]  Mustapha Nourelfath,et al.  Integrating production, inventory and maintenance planning for a parallel system with dependent components , 2012, Reliab. Eng. Syst. Saf..

[63]  Adisak Pongpullponsak,et al.  Minimizing the cost of integrated systems approach to process control and maintenance model by EWMA control chart using genetic algorithm , 2011, Expert Syst. Appl..

[64]  E. Del Castillo Relations between control chart design variables and production control , 1995 .

[65]  Mingyuan Chen,et al.  Grouping operations in cellular manufacturing considering alternative routings and the impact of run length on product quality , 2009 .

[66]  Robert Schmitt,et al.  Model for a Decision Theory Based Inspection Planning , 2014 .

[67]  Jingshan Li,et al.  Performance analysis of production systems with rework loops , 2004 .

[68]  Mitchell M. Tseng,et al.  Design for mass personalization , 2010 .

[69]  Gunther Reinhart,et al.  Automatic programming of robot-mounted 3D optical scanning devices to easily measure parts in high-variant assembly , 2009 .

[70]  Robert Schmitt,et al.  The Quality Backward Chain - The Adaptive Controller of Entrepreneurial Quality , 2009, DET.

[71]  Stephan Biller,et al.  Indicators for quality improvability and bottleneck sequence in flexible manufacturing systems with batch production , 2012 .

[72]  Lei Yang,et al.  Bayesian Belief Network-based approach for diagnostics and prognostics of semiconductor manufacturing systems , 2012 .

[73]  Tullio Tolio,et al.  Impact of Quality Control on Production System Performance , 2006 .

[74]  Sofia Panagiotidou,et al.  Optimal integrated process control and maintenance under general deterioration , 2012, Reliab. Eng. Syst. Saf..

[75]  S. Jack Hu,et al.  Modeling of Manufacturing Complexity in Mixed-Model Assembly Lines , 2008 .

[76]  R. Schmitt,et al.  Entrepreneurial quality management — A new definition of quality , 2008, 2008 IEEE International Engineering Management Conference.

[77]  Tullio Tolio,et al.  Analytical methods to support continuous improvements at Scania , 2010 .

[78]  Aditya Parida,et al.  Maintenance performance metrics a state of the art review , 2013 .

[79]  Robert Schmitt,et al.  Cognition-based self-optimisation of an automotive rear-axle-drive production process , 2010 .

[80]  Nelson P. Repenning,et al.  Capability Traps and Self-Confirming Attribution Errors in the Dynamics of Process Improvement , 2002 .

[81]  Nobutada Fujii,et al.  Proactive maintenance scheduling in a re-entrant flow shop using Lagrangian decomposition coordination method , 2010 .

[82]  Stanley B. Gershwin,et al.  Part Waiting Time Distribution in a Two-Machine Line , 2012 .

[83]  Panagiotis Tsarouhas,et al.  Systems Analysis Speeds Up Chipita's Food-Processing Line , 2002, Interfaces.

[84]  Barış Tan,et al.  Handbook of stochastic models and analysis of manufacturing system operations , 2013 .

[85]  Kathryn E. Stecke,et al.  REVIEW OF OPERATOR/MACHINE INTERFERENCE MODELS. , 1985 .

[86]  Tullio Tolio,et al.  A Decomposition Method to Support the Configuration / Reconfiguration of Production Systems , 2005 .

[87]  Hans-Peter Wiendahl,et al.  Logistic Analysis of Production Processes by Operating Curves , 1991 .

[88]  T. Tolio,et al.  Integrated Analysis of Production Logistics and Quality Performance in Transfer Lines with Rework , 2007 .

[89]  Feng Niu,et al.  Fault Region Localization: Product and Process Improvement Based on Field Performance and Manufacturing Measurements , 2006, IEEE Transactions on Automation Science and Engineering.

[90]  Jaime A. Camelio,et al.  Modeling Variation Propagation of Multi-Station Assembly Systems With Compliant Parts , 2003 .

[91]  Dennis E. Blumenfeld,et al.  Designing production systems for quality: Research opportunities from an automotive industry perspective , 2003 .

[92]  Karim A. Tahboub,et al.  Intelligent Control for Manipulators with Moving Bases , 1998, J. Intell. Manuf..

[93]  Massimo Pacella,et al.  An Approach Based on Process Signature Modeling for Roundness Evaluation of Manufactured Items , 2008, J. Comput. Inf. Sci. Eng..

[94]  Mario G. Beruvides,et al.  A Study on the Quality–Productivity Relationship and its Verification in Manufacturing Industries , 2007 .

[95]  Jeffrey L. Callen,et al.  Just-In-Time: A Cross-sectional Plant Analysis , 2000 .

[96]  Gunther Reinhart,et al.  Production of large-area lithium-ion cells – Preconditioning, cell stacking and quality assurance , 2012 .

[97]  Lihui Wang,et al.  Reconfigurable manufacturing systems: the state of the art , 2008 .

[98]  Reuven Katz,et al.  Integration of reconfigurable inspection with stream of variations methodology , 2005 .

[99]  Sotiris Makris,et al.  Supply chain modeling and control for producing highly customized products , 2008 .

[100]  Benoît Iung,et al.  Integration of maintenance strategies into prognosis process to decision-making aid on system operation , 2005 .

[101]  Darek Ceglarek,et al.  Multi-step Functional Process Adjustments to Reduce No-fault-found Product Failures in Service Caused by In-tolerance Faults , 2013 .

[102]  Eberhard Abele,et al.  Global production : a handbook for strategy and implementation , 2008 .

[103]  Kriangkrai Waiyagan,et al.  Intelligent feature based process planning for five-axis mill-turn parts , 2009, Comput. Ind..

[104]  Anath Fischer,et al.  Multi-sensor Multi-resolution Data Fusion Modeling , 2014 .

[105]  Michael Yu Wang,et al.  Locator and Sensor Placement for Automated Coordinate Checking Fixtures , 1998, Manufacturing Science and Engineering.

[106]  John N. Warfield,et al.  Perspectives on quality coordination and assurance in global supply chains , 2011 .

[107]  Matthias Prandtstetter,et al.  An integer linear programming approach and a hybrid variable neighborhood search for the car sequencing problem , 2008, Eur. J. Oper. Res..

[108]  Bernd Scholz-Reiter,et al.  Autonomous Processes in Assembly Systems , 2007 .

[109]  Hans Wortmann,et al.  Condition based maintenance in the context of opportunistic maintenance , 2012 .

[110]  Robert Trimble,et al.  Measuring the status and alignment of maintenance and manufacturing strategies – the development of a new model and diagnostic tool , 2013 .

[111]  Zhang Wu,et al.  The cost minimization and manpower deployment to SPC in a multistage manufacturing system , 2007 .

[112]  Jorge Arinez,et al.  Quality flow model in automotive paint shops , 2013 .

[113]  Akif Asil Bulgak,et al.  Impact of quality improvement on optimal buffer designs and productivity in automatic assembly systems , 1992 .

[114]  Ismail Sila,et al.  Quality in supply chains: an empirical analysis , 2006 .

[115]  Frank Härtig,et al.  Precision engineering for wind energy systems , 2012 .

[116]  Andrea Matta,et al.  Analysis of the production variability in multi-stage manufacturing systems , 2010 .

[117]  Jaime A. Camelio,et al.  Compliant Assembly Variation Analysis Using Component Geometric Covariance , 2004 .

[118]  Kai Han,et al.  A batch-based run-to-run process control scheme for semiconductor manufacturing , 2013 .

[119]  László Monostori,et al.  A coordination mechanism for rolling horizon planning in supply networks , 2008 .

[120]  Robert Schmitt,et al.  Cognitive failure cluster enhancing the efficiency and the precision of the self-optimizing process model for bevel gear contact patterns , 2012 .

[121]  Sotiris Makris,et al.  A toolbox approach for flexibility measurements in diverse environments , 2007 .

[122]  Jaideep Motwani,et al.  The effect of straight- and U-shaped lines on quality , 2000, IEEE Trans. Engineering Management.

[123]  Xiangqian Jiang,et al.  Multisensor data fusion in dimensional metrology , 2009 .

[124]  Velusamy Subramaniam,et al.  Increasing production rate in Kanban controlled assembly lines through preventive maintenance , 2012 .

[125]  Peihua Gu,et al.  Open-architecture products , 2013 .

[126]  Barış Tan,et al.  Modeling and Analysis of Output Variability in Discrete Material Flow Production Systems , 2013 .

[127]  Marcello Colledani,et al.  Design and Evaluation of In-line Product Repair Strategies for Defect Reduction in the Production of Electric Drives , 2014 .

[128]  Fugee Tsung,et al.  A Change Point Approach for Phase I Analysis in Multistage Processes , 2008, Technometrics.

[129]  Robert R. Inman,et al.  Product quality and plant build complexity , 2010 .

[130]  Stephan Biller,et al.  Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study , 2010, IEEE Transactions on Automation Science and Engineering.

[131]  Esko Juuso,et al.  Intelligent performance measures for condition‐based maintenance , 2013 .

[132]  Tullio Tolio,et al.  Integrated analysis of quality and production logistics performance in manufacturing lines , 2011 .

[133]  Stefan Helber,et al.  Performance Analysis of Flow Lines with Non-Linear Flow of Material , 1999 .

[134]  Wei Liang,et al.  Opportunistic predictive maintenance for complex multi-component systems based on DBN-HAZOP model , 2012 .

[135]  M. R. Rotab Khan,et al.  Development of analytical relation between maintenance, quality and productivity , 2010 .

[136]  László Monostori,et al.  Design and assessment of quality control loops for stable business processes , 2012 .

[137]  Jay Lee,et al.  Intelligent prognostics tools and e-maintenance , 2006, Comput. Ind..

[138]  Andrea Matta,et al.  Performance evaluation of linear and non-linear multi-product multi-stage lines with unreliable machines and finite homogeneous buffers , 2008 .

[139]  Kailash C. Kapur,et al.  Dynamic performance measures for tools with multi-state wear processes and their applications for tool design and selection , 2010 .

[140]  John D. Sterman,et al.  System Dynamics: Systems Thinking and Modeling for a Complex World , 2002 .

[141]  El Houssaine Aghezzaf,et al.  Integrated production planning and preventive maintenance in deteriorating production systems , 2008, Inf. Sci..

[142]  Jionghua Jin,et al.  Algebraic expression of system configurations and performance metrics for mixed-model assembly systems , 2014 .

[143]  Jay Lee Teleservice engineering in manufacturing: challenges and opportunities , 1998 .

[144]  George S. Easton,et al.  Tradeoffs in Manufacturing? A Meta‐Analysis and Critique of the Literature , 2010 .

[145]  Anath Fischer,et al.  A Uniform Approach for Utilizing Synergy between Inspection Technologies and Computational Methods , 2006 .

[146]  Sami Kara,et al.  Towards Energy and Resource Efficient Manufacturing: A Processes and Systems Approach , 2012 .

[147]  Alain Bernard,et al.  CAD model based virtual assembly simulation, planning and training , 2013 .

[148]  Andrew Starr,et al.  A Review of data fusion models and architectures: towards engineering guidelines , 2005, Neural Computing & Applications.

[149]  Aydin Nassehi,et al.  Machine tool capability profile for intelligent process planning , 2009 .

[150]  Stanley B. Gershwin,et al.  The Hedging Zone Policy for Real-Time Scheduling of Sequence-Dependent Setups , 2009 .

[151]  Jan C. Aurich,et al.  Quality oriented maintenance scheduling , 2011 .

[152]  Stanley B. Gershwin,et al.  A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines , 2013, Ann. Oper. Res..

[153]  George Chryssolouris,et al.  DESYMA: assessing flexibility for the lifecycle of manufacturing systems , 2007 .

[154]  Alain Bernard,et al.  Product Variety Management , 1998 .

[155]  William C. Jordan,et al.  Chained cross-training of assembly line workers , 2004 .

[156]  Massimo Pacella,et al.  Statistical Process Control for Geometric Specifications: On the Monitoring of Roundness Profiles , 2008 .

[157]  Marc Gravel,et al.  Solving real car sequencing problems with ant colony optimization , 2006, Eur. J. Oper. Res..

[158]  K. T. Meselhy,et al.  Quality and Maintainability Frameworks for Changeable and Reconfigurable Manufacturing , 2009 .

[159]  H. Lorenz,et al.  Jena Research Papers in Business and Economics Sequencing Mixed-Model Assembly Lines : Survey , Classification and Model Critique , 2007 .

[160]  Yu Ding,et al.  A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes , 2006 .

[161]  I. Alsyouf The role of maintenance in improving companies' productivity and profitability , 2002 .

[162]  Kamran Paynabar,et al.  Modeling and Analysis of Operator Effects on Process Quality and Throughput in Mixed Model Assembly Systems , 2011 .

[163]  Kaibo Liu,et al.  Multimode variation modeling and process monitoring for serial-parallel multistage manufacturing processes , 2013 .

[164]  Hendrik Van Landeghem,et al.  An Evolutionary Algorithm and discrete event simulation for optimizing inspection strategies for multi-stage processes , 2007, Eur. J. Oper. Res..

[165]  Eric Levrat,et al.  ‘Odds Algorithm’-based Opportunistic Maintenance Task Execution for Preserving Product Conditions , 2007 .

[166]  Dong-Yuh Yang,et al.  Optimal management of the machine repair problem with working vacation: Newton's method , 2009, J. Comput. Appl. Math..

[167]  Jian Liu Variation reduction for multistage manufacturing processes: a comparison survey of statistical-process-control vs stream-of-variation methodologies , 2010, Qual. Reliab. Eng. Int..

[168]  Chao-Bo Yan,et al.  Equilibria, Stability, and Transients in Re-Entrant Lines Under FBFS and LBFS Dispatch and Constant Release , 2012, IEEE Transactions on Semiconductor Manufacturing.

[169]  Douglas C. Montgomery,et al.  A Discussion on Statistically-Based Process Monitoring and Control , 1997 .

[170]  Hamilton Emmons,et al.  Inspection allocation for multistage deteriorating production systems , 2002 .

[171]  Stephan Biller,et al.  Quality bottleneck transitions in flexible manufacturing systems with batch productions , 2013 .

[172]  Bhaba R. Sarker,et al.  Optimal batch sizing in a multi-stage production system with rework consideration , 2008, Eur. J. Oper. Res..

[173]  Jay Lee,et al.  Maintenance: Changing role in life cycle management , 2004 .

[174]  Jean-Pierre Kruth,et al.  A CAPP System for Nonlinear Process Plans , 1992 .

[175]  Andrew Y. C. Nee,et al.  Augmented reality applications in design and manufacturing , 2012 .

[176]  Yao Hu,et al.  Transient analysis to design buffer capacity in dairy filling and packing production lines , 2010 .

[177]  Anath Fischer,et al.  Verification of 3D freeform parts by registration of multiscale shape descriptors , 2010 .

[178]  Shunji Osaki,et al.  Opportunity-based age replacement with different intensity rates , 2003 .

[179]  Yarlin Kuo,et al.  Optimal adaptive control policy for joint machine maintenance and product quality control , 2006, Eur. J. Oper. Res..

[180]  Jacob Fraden,et al.  Handbook of modern sensors , 1997 .

[181]  Anath Fischer,et al.  New Trends in Rapid Product Development , 2002 .

[182]  Mor Harchol-Balter,et al.  Closed form solutions for mapping general distributions to quasi-minimal PH distributions , 2006, Perform. Evaluation.

[183]  Benoît Iung,et al.  On the concept of e-maintenance: Review and current research , 2008, Reliab. Eng. Syst. Saf..

[184]  Gisela Lanza,et al.  Configuration of a Multi-use Battery Production , 2014 .

[185]  Steven Peters,et al.  Ad-hoc Rescheduling and Innovative Business Models for Shock- robust Production Systems☆ , 2013 .

[186]  Samuel Bassetto,et al.  Optimisation of the process control in a semiconductor company: model and case study of defectivity sampling , 2011 .

[187]  Dong-Jo Park,et al.  Optimal buffer allocation of serial production lines with quality inspection machines , 2002 .

[188]  George Chryssolouris,et al.  Assembly system design and operations for product variety , 2011 .

[189]  Steven Y. Liang,et al.  Machining Process Monitoring and Control: The State-of-the-Art , 2004 .

[190]  Tullio Tolio,et al.  Pallet operation sequencing based on network part program logic , 2013 .

[191]  László Monostori,et al.  Cooperative and responsive manufacturing enterprises , 2011 .

[192]  C. Richard Cassady,et al.  Combining preventive maintenance and statistical process control: a preliminary investigation , 2000 .

[193]  Vijayan N. Nair,et al.  Selective Assembly in Manufacturing: Statistical Issues and Optimal Binning Strategies , 2004, Technometrics.

[194]  Tullio Tolio,et al.  SPECIES—Co-evolution of products, processes and production systems , 2010 .

[195]  F. A. van der Duyn Schouten,et al.  Maintenance optimization of a production system with buffer capacity , 1995 .

[196]  Robert Schmitt,et al.  Benchmarking of Methods and Instruments for Self-Optimization in Future Production Systems , 2012 .

[197]  Jianjun Shi,et al.  Quality control and improvement for multistage systems: A survey , 2009 .

[198]  Semyon M. Meerkov,et al.  Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks , 2011, Ann. Oper. Res..

[199]  Jingshan Li,et al.  Quality analysis in flexible manufacturing systems with batch productions , 2010, 2008 IEEE International Conference on Automation Science and Engineering.

[200]  C. Herrmann,et al.  A Simulation-based Evaluation of Selective and Adaptive Production Systems (SAPS) Supported by Quality Strategy in Production , 2012 .

[201]  Gisela Lanza,et al.  Innovative Quality Strategies for Global Value-Added-Networks , 2013 .

[202]  Jay Lee,et al.  Watchdog Agent - an infotronics-based prognostics approach for product performance degradation assessment and prediction , 2003, Adv. Eng. Informatics.

[203]  Paul G. Maropoulos,et al.  Design verification and validation in product lifecycle , 2010 .

[204]  Peter Nyhuis,et al.  Changeable Manufacturing - Classification, Design and Operation , 2007 .

[205]  Bernd Scholz-Reiter,et al.  Dynamic flexible flow shop problems—Scheduling heuristics vs. autonomous control , 2010 .

[206]  Bernd Scholz-Reiter,et al.  Assessment of fidelity of control-theoretic models of WIP regulation in networks of autonomous work systems , 2011 .

[207]  Ali Gharbi,et al.  Maintenance scheduling and production control of multiple-machine manufacturing systems , 2005, Comput. Ind. Eng..

[208]  Yoram Koren,et al.  Impact of Manufacturing System Configuration on Performance , 1998 .

[209]  John Miltenburg,et al.  The stochastic U‐line balancing problem , 2003 .

[210]  Stephan Biller,et al.  Product Sequencing With Respect to Quality in Flexible Manufacturing Systems With Batch Operations , 2010, IEEE Transactions on Automation Science and Engineering.

[211]  Zhigang Tian,et al.  Opportunistic maintenance for wind farms considering multi-level imperfect maintenance thresholds , 2012 .

[212]  Xun Xu,et al.  Computer-aided process planning – A critical review of recent developments and future trends , 2011, Int. J. Comput. Integr. Manuf..

[213]  Aitor Arnaiz,et al.  Data Mining for Burr Detection (in the Drilling Process) , 2009, IWANN.

[214]  Benoît Iung From remote maintenance to MAS-based e-maintenance of an industrial process , 2003, J. Intell. Manuf..

[215]  El Houssaine Aghezzaf,et al.  An integrated production and preventive maintenance planning model , 2007, Eur. J. Oper. Res..

[216]  Christoph Herrmann,et al.  Methods for Implementing Compensation Strategies in Micro Production Systems Supported by a Simulation Approach , 2012, IPAS.

[217]  Xiaolan Xie,et al.  Optimal joint preventive maintenance and production policies , 2005 .

[218]  Rommert Dekker,et al.  Optimal maintenance of multi-component systems: a review , 2008 .

[219]  Jun Ni,et al.  Condition-Based Maintenance Decision-Making for Multiple Machine Systems , 2009 .

[220]  Anath Fischer,et al.  3D Reconstruction and Visualization of Microstructure Surfaces from 2D Images , 2007 .

[221]  Krzysztof Jemielniak,et al.  Advanced monitoring of machining operations , 2010 .

[222]  Jun Ni,et al.  Maintenance scheduling in manufacturing systems based on predicted machine degradation , 2008, J. Intell. Manuf..

[223]  Peter Butala,et al.  Autonomous Work Systems in Manufacturing Networks , 2006 .

[224]  Yu Ding,et al.  Fault Diagnosis of Multistage Manufacturing Processes by Using State Space Approach , 2002 .

[225]  Kevin W. Linderman,et al.  An integrated systems approach to process control and maintenance , 2005, Eur. J. Oper. Res..

[226]  R. Schmitt,et al.  Analyzing the deviation of product value judgment , 2013 .

[227]  E. G. Kyriakidis,et al.  A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times , 2008 .

[228]  Divya Pandey,et al.  A methodology for joint optimization for maintenance planning, process quality and production scheduling , 2011, Comput. Ind. Eng..

[229]  Dennis E. Blumenfeld,et al.  Quantitative analysis of a transfer production line with Andon , 2006 .

[230]  Timothy L. Urban Analysis of production systems when run length influences product quality , 1998 .

[231]  Steven Peters,et al.  Integrated capacity planning over highly volatile horizons , 2012 .

[232]  Ali Gharbi,et al.  Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell , 2012 .

[233]  Alexander Verl,et al.  Cooperation of human and machines in assembly lines , 2009 .

[234]  L. Eduardo Izquierdo,et al.  Functional process adjustments to reduce No-Fault-Found product failures in service caused by in-tolerance faults , 2009 .

[235]  Nidhal Rezg,et al.  Integrated model of preventive maintenance, quality control and buffer sizing for unreliable and imperfect production systems , 2009 .

[236]  Martin Jacobsson,et al.  A computerised model to enhance the cost-effectiveness of production and maintenance dynamic decisions : A case study at Fiat , 2013 .

[237]  Athena Zitrou,et al.  The signal model: A model for competing risks of opportunistic maintenance , 2011, Eur. J. Oper. Res..

[238]  E. G. Kyriakidis,et al.  Optimal preventive maintenance of a production system with an intermediate buffer , 2006, Eur. J. Oper. Res..

[239]  Dieter Spath,et al.  Quality Simulation for Fast Ramp Up , 2003 .

[240]  J. McCall Operating Characteristics of Opportunistic Replacement and Inspection Policies , 1963 .

[241]  Tullio Tolio,et al.  Performance evaluation of production systems monitored by statistical process control and off-line inspections , 2009 .

[242]  Stanley B. Gershwin,et al.  Scheduling manufacturing systems with work-in-process inventory control: single-part-type systems , 1995 .

[243]  Deniz Türsel Eliiyi,et al.  The state of the art on buffer allocation problem: a comprehensive survey , 2014, J. Intell. Manuf..

[244]  Tullio Tolio,et al.  Integrated quality, production logistics and maintenance analysis of multi-stage asynchronous manufacturing systems with degrading machines , 2012 .

[245]  C. Richard Cassady,et al.  Simultaneous optimization of [Xbar] control chart and age-based preventive maintenance policies under an economic objective , 2007 .

[246]  Qiang Huang,et al.  Variation transmission analysis and diagnosis of multi-operational machining processes , 2004 .

[247]  Peter J. Brown,et al.  On-line Documentation , 1987 .

[248]  Benoît Iung,et al.  Conceptual framework for e-Maintenance: Illustration by e-Maintenance technologies and platforms , 2009, Annu. Rev. Control..

[249]  J. George Shanthikumar,et al.  Using in-line equipment condition and yield information for maintenance scheduling and dispatching in semiconductor wafer fabs , 2002 .

[250]  Masahiko Mori,et al.  Development of remote monitoring and maintenance system for machine tools , 2008 .

[251]  Klaas Smit,et al.  Collaborative contracts for inter‐organisational quality systems , 2012 .

[252]  George Liberopoulos Production Release Control: Paced, WIP-Based or Demand-Driven? Revisiting the Push/Pull and Make-to-Order/Make-to-Stock Distinctions , 2013 .

[253]  Robert Pellerin,et al.  Joint assignment of buffer sizes and inspection points in unreliable transfer lines with scrapping of defective parts , 2013 .

[254]  Stephan Biller,et al.  A Quality Flow Model in Battery Manufacturing Systems for Electric Vehicles , 2014, IEEE Transactions on Automation Science and Engineering.

[255]  F. Jovane,et al.  Reconfigurable Manufacturing Systems , 1999 .

[256]  Hoda A. ElMaraghy,et al.  Assessing the structural complexity of manufacturing systems configurations , 2007 .

[257]  Kwai-Sang Chin,et al.  A hybrid rough-cut process planning for quality , 2003 .

[258]  Dragan Djurdjanovic,et al.  Operation-dependent maintenance scheduling in flexible manufacturing systems , 2012 .

[259]  Youichi Nonaka,et al.  Scheduling with alternative routings in CNC workshops , 2012 .

[260]  Burak Kazaz,et al.  The impact of process deterioration on production and maintenance policies , 2013, Eur. J. Oper. Res..

[261]  T. Tolio,et al.  An Analytical Method to Support the Design of Production Systems Monitored by Statistical Process Control , 2006 .

[262]  Semyon M. Meerkov,et al.  Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design , 2010 .

[263]  József Váncza,et al.  Channel coordination with the newsvendor model using asymmetric information , 2012 .

[264]  Gad Rabinowitz,et al.  Optimal robot operation and selection using quality and output trade-off , 1995 .

[265]  Hoda A. ElMaraghy,et al.  Transient Analysis of a Re-entrant Manufacturing System , 2014 .

[266]  T. Altiok,et al.  Planning repair effort in transfer lines , 1998 .

[267]  Dennis E. Blumenfeld,et al.  Assembly line team sizing with absenteeism , 2010 .

[268]  T. Tolio,et al.  Joint design of quality and production control in manufacturing systems , 2011 .

[269]  K. S. Chaudhuri,et al.  Production lot sizing with process deterioration and machine breakdown , 2008, Eur. J. Oper. Res..

[270]  Attila Lengyel,et al.  TSUNAMI Effect Prediction Methodology for Critical Resource Analysis , 2008 .

[271]  Yoram Koren,et al.  Co-Evolution of Product Families and Assembly Systems , 2007 .

[272]  Ruifeng Chen,et al.  Performance evaluation and enhancement of multistage manufacturing systems with rework loops , 2012, Comput. Ind. Eng..

[273]  Jie Zhu,et al.  Stream of Variation Based Error Compensation Strategy in Multi-Stage Manufacturing Processes , 2005 .

[274]  Yu Ding,et al.  A comparison of process variation estimators for in-process dimensional measurements and control , 2005 .

[275]  József Váncza,et al.  A distributed coordination mechanism for supply networks with asymmetric information , 2013, Eur. J. Oper. Res..

[276]  Paul Young,et al.  Quality risk prediction at a non-sampling station machine in a multi-product, multi-stage, parallel processing manufacturing system subjected to sequence disorder and multiple stream effects , 2013, Ann. Oper. Res..

[277]  J.-W. Li Comparative study of push and pull systems considering quality performance in a cell-based job shop environment , 2005 .

[278]  Bernd Scholz-Reiter,et al.  Autonomously controlled production systems—Influence of autonomous control level on logistic performance , 2009 .

[279]  John Miltenburg,et al.  U-shaped production lines: A review of theory and practice , 2001 .

[280]  Stefano Petrò,et al.  Network part program approach based on the STEP-NC data structure for the machining of multiple fixture pallets , 2014, Int. J. Comput. Integr. Manuf..

[281]  Feng Niu,et al.  Distributed Sensing for Quality and Productivity Improvements , 2006, IEEE Transactions on Automation Science and Engineering.

[282]  Gary Lee Miller,et al.  Flexible Manufacturing System , 2006 .

[283]  Salih O. Duffuaa,et al.  Optimal joint maintenance and operation policies to maximise overall systems effectiveness , 2013 .

[284]  Anath Fischer,et al.  Geometric Bone Modeling: From Macro to Micro Structures , 2010, Journal of Computer Science and Technology.

[285]  A. Verl,et al.  Proactive quality control system for defect reduction in the production of electric drives , 2013, 2013 3rd International Electric Drives Production Conference (EDPC).

[286]  Marcello Colledani,et al.  Integrated quality and production logistics analysis of closed loop manufacturing systems , 2010, 2010 IEEE 15th Conference on Emerging Technologies & Factory Automation (ETFA 2010).

[287]  Hans-Peter Wiendahl,et al.  Human Factors in Production Planning and Control - How to Change Potential Stumbling Blocks into Reliable Actors , 2003, APMS.

[288]  Venkat Venkatasubramanian,et al.  Prognostic and diagnostic monitoring of complex systems for product lifecycle management: Challenges and opportunities , 2005, Comput. Chem. Eng..

[289]  J. George Shanthikumar,et al.  COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT, SINGLE‐ MACHINE PRODUCTION SYSTEM , 2009 .

[290]  Ningjian Huang,et al.  Quality Evaluation in Flexible Manufacturing Systems: A Markovian Approach , 2007 .

[291]  Jianjun Shi,et al.  Causation-Based T2 Decomposition for Multivariate Process Monitoring and Diagnosis , 2008 .

[292]  Eric Levrat,et al.  Odds-based decision-making tool for opportunistic production-maintenance synchronization , 2008 .

[293]  Hau L. Lee,et al.  Lot Sizing with Random Yields: A Review , 1995, Oper. Res..

[294]  K. Srinivasa Rao,et al.  An inventory model for perishable items with alternating rate of production , 2011, Int. J. Adv. Oper. Manag..

[295]  George Chryssolouris,et al.  Decision making on the factory floor: An integrated approach to process planning and scheduling , 1984 .