Lean Design Versus Traditional Design Approach

The purpose of this paper is to determine if lean design can enhance value for the customer in the construction industry based on an examination of the design phase. Resent research from Statistics Norway shows a reduction of 9 % in the Norwegian construction industry’s productivity from 1992 to 2012. The paper also discusses if lean design can have an overall positive effect on the productivity. A case study has been carried out, comparing two projects using a qualitative approach. The projects use different methods in the design phase; lean design vs. traditional design approach. Implementing lean design can increase value for the client. Lean design might enable a productivity growth in the Norwegian construction industry similar to the growth observed until the 1990s. Similarities are found between classic project execution and projects where lean design is implemented, particularly the focus on planning and control. The originality lies in comparison of the recently implemented lean design and the classic project execution model. This permits an in-depth analysis of the novelty and effects of certain lean design features. Lean design seems to have reduced waste in the process, but the total value concept was rarely considered.

[1]  Ander Errasti,et al.  A process for developing partnerships with subcontractors in the construction industry: An empirical study , 2007 .

[2]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[3]  P. Hines,et al.  Learning to evolve: A review of contemporary lean thinking , 2004 .

[4]  Lauri Koskela,et al.  An exploration towards a production theory and its application to construction , 2000 .

[5]  Terry Cooke-Davies,et al.  The “real” success factors on projects , 2002 .

[6]  Jardar Lohne,et al.  The need for a project governance body , 2014 .

[7]  Glenn Ballard,et al.  Learning to see work flow: an application of lean concepts to precast concrete fabrication , 2003 .

[8]  Gregory A. Howell,et al.  An Update on Last Planner , 2003 .

[9]  Rafael Sacks,et al.  Modern Construction: Lean Project Delivery and Integrated Practices , 2013 .

[10]  Sten Bonke,et al.  Facilitating Client Value Creation in the Conceptual Design Phase of Construction Projects: A Workshop Approach , 2010 .

[11]  R. Yin Case Study Research: Design and Methods , 1984 .

[12]  John Kelly,et al.  Value Management of Construction Projects: Kelly/Value , 2008 .

[13]  Véronique Ambrosini,et al.  Firm value creation and levels of strategy , 2007 .

[14]  Glenn Ballard,et al.  The Lean Project Delivery System: An Update , 2008 .

[15]  Robert K. Wysocki,et al.  Effective Project Management: Traditional, Adaptive, Extreme , 2000 .

[16]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[17]  Kenneth H. Rose Pmp Reviewer Effective project management: Traditional, agile, extreme, fifth edition , 2010 .

[18]  Stephen Emmitt,et al.  Implementing Value Through Lean Design Management , 2004 .

[19]  Christine Pasquire,et al.  Value theory in lean construction , 2011 .

[20]  C. Henjewele,et al.  Construction Project Management , 2005 .

[21]  Glenn Ballard CAN PULL TECHNIQUES BE USED IN DESIGN MANAGEMENT , 1999 .

[22]  Stephen Emmitt,et al.  The Value Universe: Defining a Value Based Approach to Lean Construction , 2005 .

[23]  Adedeji Badiru,et al.  Handbook Of Industrial And Systems Engineering , 2005 .

[24]  Stephen Emmitt,et al.  Collaborative Design Management , 2013 .

[25]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[26]  Christine Pasquire,et al.  Exploring Value Concept Through the IGLC Community: Nineteen Years of Experience , 2012 .