A Honey Bee Swarm Optimization Algorithm for Minimizing the Total Costs of Resources in MRCPSP

In this paper, we introduce a multimode resource-constrained project scheduling problem with finish-to-start precedence relations among project activities, considering renewable and nonrenewable resource costs. We assume that renewable resources are rented and are not available in all periods of time of the project. In other words, there is a mandated ready date as well as a due date for each renewable resource type so that no resource is used before its ready date. However, the resources are permitted to be used after their due dates by paying penalty costs. The objective is to minimize the total costs of both renewable and nonrenewable resource usage. This problem is called multi-mode resource-constrained project scheduling problem with minimization the net present value of total weighted resource tardiness penalty cost (MRCPSP-DCTWRTPC) where for each activity, both renewable and nonrenewable resource requirements depend on activity mode. For this problem, we present a meta-heuristic algorithm based on a Honey Bee Swarm Optimization (HBSO) approach together with a prioritization rule for activities and several improvement and local search methods. Experimental results reveal the effectiveness and efficiency of the proposed algorithm for the problem in question.

[1]  Rolf H. Möhring,et al.  Resource-constrained project scheduling: Notation, classification, models, and methods , 1999, Eur. J. Oper. Res..

[2]  Erik Demeulemeester,et al.  Project scheduling : a research handbook , 2002 .

[3]  Arno Sprecher,et al.  An exact algorithm for project scheduling with multiple modes , 1997 .

[4]  Rainer Kolisch,et al.  PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .

[5]  Mario Vanhoucke,et al.  A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..

[6]  Mohammad Khalilzadeh,et al.  A Modified PSO Algorithm for Minimizing the Total Costs of Resources in MRCPSP , 2012 .

[7]  Jan Karel Lenstra,et al.  Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..

[8]  Mohammad Khalilzadeh,et al.  An optimal procedure for minimizing total weighted resource tardiness penalty costs in the resource-constrained project scheduling problem , 2012, Comput. Ind. Eng..

[9]  Federico Barber,et al.  Multi-mode resource constrained project scheduling: scheduling schemes, priority rules and mode selection rules , 2006, Inteligencia Artif..

[10]  Rainer Kolisch,et al.  PSPLIB - a project scheduling problem library , 1996 .

[11]  Ruey-Maw Chen,et al.  Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in PSPLIB , 2010, Expert Syst. Appl..

[12]  Sönke Hartmann,et al.  A survey of variants and extensions of the resource-constrained project scheduling problem , 2010, Eur. J. Oper. Res..

[13]  Rainer Kolisch,et al.  Characterization and generation of a general class of resource-constrained project scheduling problems , 1995 .