Application of coefficient of variation and osculating value method in bidding evaluation of power construction project

In this paper, the calculation principle of Osculating Value Method was used, calculate the weights with the coefficient of variation method and Point out the relative importance of organization design in bidding evaluation of power construction projects, to establish the integrated evaluation model based on coefficient of variation and osculating value method and provide a quantitative analysis method of simple and reasonable for the evaluation for the project. Examples show that this method is simple, scientific and rational.