Factors Affecting Contractors' Bidding Decisions for Construction Projects in Nigeria
暂无分享,去创建一个
Adedeji Afolabi | Opeyemi Oyeyipo | Rapheal A. Ojelabi | Koleola Tunwase Odusami | O. Oyeyipo | K. Odusami | R. Ojelabi | A. Afolabi
[1] Zedan Hatush,et al. Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .
[2] A. Shash. Factors considered in tendering decisions by top UK contractors , 1993 .
[3] Mohammed Wanous,et al. A neural network bid/no bid model: the case for contractors in Syria , 2003 .
[4] M. El-Mashaleh,et al. Understanding Key Bidding Factors Considered by Top Jordanian Contractors , 2014 .
[5] Aminah Robinson Fayek,et al. A survey of the bidding practices of Canadian civil engineering construction contractors , 1999 .
[6] Gary David Holt,et al. Lowest price or value? Investigation of UK construction clients' tender selection process , 2000 .
[7] Abdulrezak N. Mohamed,et al. A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions , 2007 .
[8] Simaan M. AbouRizk,et al. UTILITY-THEORY MODEL FOR BID MARKUP DECISIONS , 1996 .
[9] Mohammed Fadhil Dulaimi,et al. The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore , 2002 .
[10] M.T. Banki,et al. The assessment of bidding strategy of Iranian construction firm , 2007, 2007 IEEE International Conference on Industrial Engineering and Engineering Management.
[11] David Lowe,et al. A logistic regression approach to modelling the contractor's decision to bid , 2004 .
[12] Aminah Robinson Fayek,et al. A Survey of Tendering Practices in the Australian Construction Industry , 1998 .
[13] M. W. Lifson,et al. Decision and risk analysis for construction management , 1982 .
[14] Mohammed Wanous,et al. To bid or not to bid: a parametric solution , 2000 .
[15] R. Fellows,et al. An examination of the importance of resource considerations when contractors make project selection decisions , 1992 .
[16] Derek S. Drew,et al. A comparison of contractors’ decision to bid behaviour according to different market environments , 2008 .