A linear programming model for cash flow management in the Brazilian construction industry

A linear programming model has been developed for optimal cash flow management addressing specific cash flow issues related to the construction industry. These include typical financial transactions, possible delays on payments, use of available credit lines, effect of changing interest rates, and budget constraints that often occur in the construction industry. A small size project from the Brazilian construction industry is provided as a case study, aiming at evaluating the potential benefits from using the model. Different changes to the basic structure of the model allow and establish the consistency of the results. Alternative formulations are suggested to deal with uncertainties, longer planning horizons, and multiple subcontractors and suppliers. In addition to the tangible financial earnings derived from the optimization process, the simple structure of the model, as a network flow and corresponding equations, provides much visual insight concerning the relationships between the external inputs and the variables of the problem. Optimal results have yet to be achieved in a real life situation, but a better view of whole cash flow management is provided when using the model.

[1]  S. N. Tucker,et al.  A single alternative formula for Department of Health and Social Security S-curves , 1988 .

[2]  R. Navon,et al.  Company-Level Cash-Flow Management , 1996 .

[3]  Ammar Peter Kaka,et al.  Towards more flexible and accurate cash flow forecasting , 1996 .

[4]  Christopher R. Malburg The cash management handbook , 1992 .

[5]  M. Cusack The use of integer linear programming for modelling project control information , 1985 .

[6]  John Bennett,et al.  Simulation applied to construction projects , 1984 .

[7]  P. Gill Systems Management Techniques for Builders and Contractors , 1968 .

[8]  Brian W. Kernighan,et al.  AMPL: A Modeling Language for Mathematical Programming , 1993 .

[9]  Hojjat Adeli,et al.  Scheduling/Cost Optimization and Neural Dynamics Model for Construction , 1997 .

[10]  Ronie Navon Resource-based model for automatic cash-flow forecasting , 1995 .

[11]  Saeed Karshenas,et al.  Economic optimization of construction project scheduling , 1990 .

[12]  Janine Nahapiet,et al.  A comparison of contractual arrangements for building projects , 1985 .

[13]  Andrew D.F. Price,et al.  Modelling standard cost commitment curves for contractors' cash flow forecasting , 1993 .

[14]  J. Harford Corporate Cash Management, Excess Cash, and Acquisitions , 1999 .

[15]  Peter E.D. Love,et al.  Using improved genetic algorithms to facilitate time-cost optimization , 1997 .

[16]  E. Werna,et al.  The concomitant evolution and stagnation of the Brazilian building industry , 1993 .

[17]  Paul Teicholz,et al.  Pre-Estimate Cash Flow Analysis , 1977 .

[18]  H. N. Ahuja Construction performance control by networks , 1976 .

[19]  Courtland A. Collier,et al.  Construction funding; where the money comes from , 1974 .

[20]  Glenn A. Sears CPM/Cost: An Integrated Approach , 1981 .

[21]  Bruce L. Golden,et al.  Models and solution techniques for cash flow management , 1979, Comput. Oper. Res..

[22]  D. A. Langford,et al.  Prediction of solvency in construction companies , 1993 .