The purpose of this paper is to report on a study which involves a simulation of a hypothetical job shop with several machines. The investigation employs GASP-II as a computer language. This simulation study is concerned with: (1) testing a new method of assign ing job due-dates and (2) comparing and evaluating the effect of different processing-time distributions on the performance of a number of scheduling rules. The most significant results of this study are: (1) The shortest-imminent-operation rule is superior to others in reducing job lateness and shop flow time (2) The procedure in which the due-date allowance is proportional to the number of operations and work content of the jobs has proved to be beneficial in the case of the non-due-date rules (3) The operation of a job shop using the shortest-imminent-operation and slack-per-remaining-number-of-operations rules is degraded when the processing-time distribution having Erlang parameter K equal to 4 or 8. However, per formance is better when K = 8 than when K = 4 (4) The GASP-II package works efficiently for large-size shop problems.
[1]
J. William Gavett,et al.
Three Heuristic Rules for Sequencing Jobs to a Single Production Facility
,
1965
.
[2]
William L. Maxwell,et al.
Network Dispatching by the Shortest-Operation Discipline
,
1962
.
[3]
Colin L. Moodie,et al.
EXPERIMENTS WITH PRIORITY DISPATCHING RULES IN A PARALLEL PROCESSOR SHOP
,
1967
.
[4]
William S. Gere.
Heuristics in Job Shop Scheduling
,
1966
.
[5]
Said Ashour.
A DECOMPOSITION APPROACH FOR THE MACHINE SCHEDULING PROBLEM
,
1967
.
[6]
R. M. Hodgson,et al.
JOB SHOPS SCHEDULING WITH DUE DATES
,
1967
.
[7]
James R. Jackson,et al.
Simulation research on job shop production
,
1957
.
[8]
Eugene S. Schwartz.
A Heuristic Procedure for Parallel Sequencing with Choice of Machines
,
1964
.
[9]
C. T. Baker,et al.
Simulation of a Simplified Job Shop
,
1960
.
[10]
Samuel Eilon,et al.
A MODIFIED SI RULE IN JOB SHOP SCHEDULING
,
1968
.