Integrated Semiconductor Supply Chain Production Planning

In this paper, we propose a deterministic mixed-integer programming model to schedule weekly production quantities for semiconductor manufacturing in order to meet forecasted demand over a six-month planning horizon. The model considers facility capacities, facility qualifying, limits on the number of facilities to use, and unit-level minimum inventory requirements. Model validity is demonstrated with a simple test case based on an industry dataset. A case study is then presented using actual industry data. Minimum inventory requirement levels are varied and compared to results obtained from traditional safety stock policies.

[1]  Yon-Chun Chou,et al.  Evaluating alternative capacity strategies in semiconductor manufacturing under uncertain demand and price scenarios , 2007 .

[2]  Reha Uzsoy,et al.  An integrated production planning model with load-dependent lead-times and safety stocks , 2009, Comput. Chem. Eng..

[3]  J.W. Fowler,et al.  Enterprise-wide semiconductor manufacturing resource planning , 2006, IEEE Transactions on Semiconductor Manufacturing.

[4]  Kenneth Fordyce,et al.  Optimized material requirements planning for semiconductor manufacturing , 2012, J. Oper. Res. Soc..

[5]  Hartmut Stadtler,et al.  Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective , 2005 .

[6]  R. John Milne,et al.  IBM Solves a Mixed-Integer Program to Optimize Its Semiconductor Supply Chain , 2006, Interfaces.

[7]  R. Uzsoy,et al.  Cycle-time improvements for photolithography process in semiconductor manufacturing , 2001 .

[8]  John W. Fowler,et al.  A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations , 2011, J. Sched..

[9]  John W. Fowler,et al.  A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shops , 2002 .

[10]  Lars Mönch,et al.  A Model for Master Planning in Semiconductor Manufacturing , 2008 .

[11]  John W. Fowler,et al.  Production Planning and Control for Semiconductor Wafer Fabrication Facilities - Modeling, Analysis, and Systems , 2013, Operations research / computer science interfaces series.

[12]  David S. Johnson,et al.  Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .

[13]  Carlo Vercellis,et al.  Multi-plant production planning in capacitated self-configuring two-stage serial systems , 1999, Eur. J. Oper. Res..

[14]  Hendrik Van Landeghem,et al.  Implementing a near-optimal solution for the multi-stage, multi-product capcitated lot sizing problem by rolling out a cyclical production plan , 2005 .

[15]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[16]  Stuart Bermon,et al.  Capacity planning under demand uncertainty for semiconductor manufacturing , 2003 .

[17]  Chen-Fu Chien,et al.  Coordinated capacity migration and expansion planning for semiconductor manufacturing under demand uncertainties , 2012 .

[18]  Kenneth Fordyce,et al.  Incorporating contractual arrangements in production planning , 2015, Comput. Oper. Res..

[19]  Zhibin Jiang,et al.  Stochastic programming based capacity planning for semiconductor wafer fab with uncertain demand and capacity , 2009, Eur. J. Oper. Res..

[20]  Harish C. Bahl,et al.  An Integrated Model for Master Scheduling, Lot Sizing and Capacity Requirements Planning , 1984 .

[21]  Lars Mönch,et al.  Using iterative simulation to incorporate load-dependent lead times in master planning heuristics , 2012, Proceedings Title: Proceedings of the 2012 Winter Simulation Conference (WSC).

[22]  David L. Woodruff,et al.  Production planning with load dependent lead times: an update of research , 2007, Ann. Oper. Res..

[23]  Shih-Min Wang,et al.  Simultaneous resource portfolio planning under demand and technology uncertainty in the semiconductor testing industry , 2013 .

[24]  Lars Mönch,et al.  Simulation-based performance assessment of master planning approaches in semiconductor manufacturing , 2014 .

[25]  Sydney C. K. Chu A mathematical programming approach towards optimized master production scheduling , 1995 .

[26]  El-Houssaine Aghezzaf,et al.  An application of cyclical master production scheduling in a multi-stage, multi-product environment , 2003 .

[27]  Michael C. Caramanis,et al.  Modeling load-dependent lead time constraints for efficient supply chain coordination: convexity issues , 1999, Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304).

[28]  Reha Uzsoy,et al.  Short‐term capacity allocation problem with tool and setup constraints , 2005 .

[29]  Oktay Günlük,et al.  Robust capacity planning in semiconductor manufacturing , 2005 .

[30]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[31]  Lars Mönch,et al.  Heuristic approaches for master planning in semiconductor manufacturing , 2012, Comput. Oper. Res..